Loading...
HomeMy WebLinkAbout16- Amendment 6 to PSA - Morrison-Maierle, Inc. - North 7th Lighting Design and Construction AdministrationAMENDMENT NO. 6 TO PROFESSIONAL SERVICES AGREEMENT FOR NORTH 7T" LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION MMI. No. 0417.063 THIS IS AN AGREEMENT made as of N6Vf_wtbe e- -).t S� 2jpk b, between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59171-1230 (OWNER) and Morrison- Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-1113 (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated July 11, 2011, herein referred to as the Original Agreement, for professional engineering services for the North 71 Lighting Design and Construction Administration project; and WHEREAS, the scope of the Original Agreement included preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment No.1 to the Original Agreement included additional miscellaneous services; and WHEREAS, the scope of Amendment No.2 to the Original Agreement included a pre -design investigation services phase; and WHEREAS, the scope of AmendmentNo.3 to the Original Agreement included additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment NoA to the Original Agreement included additional pre -design investigation services; and WHEREAS, the scope of Amendment No.5 to the Original Agreement included additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services for the project.; and WHEREAS, the parties desire to amend provisions of the Original Agreement to transfer budget from construction engineering services to preliminary and final design level engineering services. This will transfer budget previously allocated for construction services between West Villard Street and West Main Street to preliminary and final design services between Durston Road and West Villard Street. This amendment does not change the total contract amount. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C-6 — SCOPE OF SERVICES FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION and EXHIBIT D-6 — ENGINEERING FEE ESTIMATE are hereby incorporated in and made part of this agreement. The Scope of Services and Engineering Fees are increased per these exhibits. ARTICLE 1 - ENGINEERING SERVICES 1 Article 1.1 of the original agreement is modified to include the following: LL The detailed description of the specific project components is described as follows: Perform preliminary and final design level engineering services for improvements to North 7'h Avenue, between West Durston Road and West Main Street. Perform miscellaneous services as requested by the City of Bozeman for improvements to North 7'h Avenue, between Durston Road and West Main Street. Perform Street Tree / Stormwater Analysis, Design and Landscape Architectural Services. ARTICLE 6 - COMPENSATION FOR ENGINEERING SERVICE Article 6.1 of the original agreement is modified as follows: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $265,416.59 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: $41,880.56 (--16% of design fee) until the Pre -Design Investigation Phase report and exhibits have been submitted to the OWNER. $144.184.03 (-54% of design fee) until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $79352.00 (--30% of design fee) until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6.1.3 General, Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Article 6.2 of the original agreement is modified as follows: Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $ 92,819.00 except as provided under 6.2.1.2 and 6.2.4. 2 6.2. 1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2 Notification. At anytime during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.2.1.3 Costs Exceeding Estimated Compensation, Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount ofthe costs incurred up to an amount not to exceed $ 7,360.00 which includes $ 0.00 for consultants employed by the Engineer and $ 7,360.00 for all other reimbursable expenses. The estimated reimbursable expenses are identified in Exhibit "_" 6.2.3. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. 3 In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA BY: A�� (City Manager) DATE ( I — 2,1-16 ATTEST: 0� �� BY: r (City Clerk) a 'U. 1. MORRISON-MAIERLE, INC. BY; (Vice -President) DATE: I'll /t/6r oda N:\0417\063\Contracts-Client\Contract Amend #6 -Main to Durston Design\PSA Amendment #6.doc 4 MLI Morrison mom Maierle engineers - surveyors planners - scientists Exhibit C-6 - Scope of Services for N. 71h Lighting Design and Construction Administration Durston Road to West Main Street October 26, 2016 The phases and tasks as noted in Contract Amendment #5 are to be modified in accordance with the schedule below. The Preliminary Design Phase including tasks 101-113 have been modified to include Durston Road to West Villard Street. The Final Design Phase including tasks 201-204 have been modified to include Durston Road to West Villard Street. The Bidding and Negotiating Phase including tasks 301 through 305 have been eliminated from West Villard Street to West Main Street. The Construction Phase including tasks 401 through 406 have been eliminated from West Villard Street to West Main Street. The Project Documentation Phase including tasks 501 through 502 have been eliminated from West Villard Street to West Main Street. The Construction Testing Phase including tasks 601 through 602 have been eliminated from West Villard Street to West Main Street. The Miscellaneous Services Phase including task 701 has been modified to include Durston Road to West Villard Street. The Street Tree / Stormwater Analysis, Design and Construction Phase including tasks 801-803 have been modified to include Durston Road to West Villard Street. This phase also includes landscape architectural services including architectural renderings throughout the corridor as requested. Task 803, construction services, has been eliminated from West Villard Street to West Main Street. Exhibit D-5 - Engineering Fee Estimate FJ Morrison City of Bozeman, PTr - North 7th Lighting Design and Construction Administration Maierle Durston Rd. to Main St. - m p• Prepared For: David Fine, City of Bozeman Economic Development Enaineerina Services Task or Division Staff Assigned Labor Hours Labor Rate Total Labor Cost 100 - Preliminary Design Phase Two Person Survey Crew 20.00 $167.0073400101. Topographic Survey -Additional Survey (Spot Senior En ineer I 4.00 132.000surveys for improvements since last survey) Land Suryor II 4.00 105.000En ineed Technician 11 14.00 105.0000102. Site Evaluation Design E ineer I 0.00 110.00Senior En ineer1 0.00 132.00103. Desi n E ineer 1 14.00 110.0000Senior LlghUn9 Layout En ineer1 4.00 132.00 .00 Design Engineer 1 20.00 110.00 2 200.00 104. Lighting Calculations and Modeling Senior Engineer I 4.00 $132.00 $528.00 105. R.O.W. Exhibits n Engineer I 0.00 $110.00 $0.00 Senior Engineer I 0.00 $132,00 $0.00 106. SILD Exhibits/LegaVPadcet Design Engineer I 4.00 $110.00 $440.00 Senior Engineer 1 7.00 $132.00 $924.00 107. Coordination - City, MDT, utilities, Suppliers Design Engineer I 50.017 $110.00 $5,500.00 Senior Engineer I 40.00 132.00 $5,280.00 Design Engineer I 5.00 $110.00 $550.00 10B. Traffic Control Plan Senior Engineer1 4.00 $132.00 $528.00 109. CMI Components (sidewalk, boulevard, grading, ineer Intern 134.00 .00 $11,792.00 landscaping, signs, etc for 26 properties) Engineering Technician II Senior Engineer I 44.00 44.00 105.00 $132.00 $4,620.00 $5,08.00 Design Engineer I 18.00 110.D0 $1,980.00 110. Preliminary Plans and Specifications Senior Engineer I 44.00 $132.00 $5,6[18.00 Design Engineer 1 5.00 $110.DD $550.00 111. Preliminary Engineer's Estimate Senior Engineer 1 10.00 $132.00 $1,320.00 112. NSURB Meetings 10 Senior Enalneer I 28.00 $132.00 0,696.00 113. Oualitv Assurance]Oualitv Control Supervising Engineer ID 3.00 177.00 S531.00 200 - Final Design Phase Engineer 1 86.00 I10.DO 9460.00 201. Final Plan Set Preparation -Design Senior En (neer I 62.00 132.00 8184.00 Desi n Engineer I 26.00 110.00 2660.00 202. Final Specifications /Bidding Docs Senior Engineer I 40.00 132.00 5280.00 203. Final Review(Permitting Coordination Senior Enoineer I 40.00 132.00 5280.00 204. uali Assuranceuall Control S sl En ineer IB 8.00 177.00 1 416.00 300 - Bidding or Negotiating Phase Administrative Specialist It 0.00 75.00 0.00 301. Prepare Advertisement, Bid bowmen[ Senior neer I 0.00 132.00 0.00 Reproduction, Bidders List, Process Deposits Su sin En ineer If[ 0.00 149.00 0.00 302. Conduct Pre -BI Conference and Respo to Design Engineer I 0.00 110.00 0.00 Contractor Requests Senior (neer I 0.00 $132.00 $0.00 Design Engineer 1 0.00 $110.00 $0.00 303. Prepare and Issue Addendum Senior Engineer 1 0.00 $132.00 $0.00 3D4. Attend Bid Opening, Prepare/Evaluate Bid Tab, Design Engineer I $110.00 0.00 Award Recommendation Senior Enciineer I $132.00 $0.00 Senior ineer 1 0.00 132.00 0.00 305. Award Contract and Contract Documents Su n4sina En neer tit 0.00 $177.00 0.00 400 -Construction Phase 401. Conduct Pre -Construction conference and Design Engineer 1 0.00 1 $0.00 Notice to Proceed Senior Engineer 1 0.00 $132.00 $0.00 402. Shop DrawingfUraffic control/Permit Review D n Engineer 1 0.00 $110.DO $0.00 and Approval Senior Engineer I 0.00 $132.00 $0.00 403. Construction La Control Two Person Survey Crew 0.00 $167.00 0.00 404. Resident Project Representative (1/4 Time, 2.5 Months Engineer Intern 0.00 $88.00 $0.00 405. Construction Management - Coordination, Design Engineer I 0.00 $110.DO $0.00 Schedule Pro ress Pay ReQuests Senior Enqineer 1 0.00 $132.00 $0.00 Design Engineer I 1 0.00 $110.00 $0.00 406. Final and TWo Year Warranty Inspection Senior En ineer I 1 0.00 132.00 $0.00 500 - Protect Documentation Design Engineer I 0.00 112 .00 0.00 501. Progress Reports (Monthly) Senior Engineer) 0.00 $132.00 $0.00 Design Engineer I 0.00 110.00 0.00 502. Record Drawings and Project Notebook SenorIneer I 0.00 132.00 0.00 Goo - Construction Testing 601. Concrete Strength, Air, Temp, Slump (Flatwork) Engineer Intern 0.00 $88.00 $0.00 6(12. Su rade and Base Densities Engineer Intern 0.00 8.00 0.00 700 - Miscel aneous Services 701. Miscellaneous Services -Additional ueshed NOL W Exceed Rate Schedule 30 000.00 D 000.00 :fflitieulsaia 800 -Street Tree/ Stormxrater Analysis, Design an Lan scapeA itecture 801. Pre -Design Analysis and Report $7,500.00 7 500.00 802. Prellmina Anal Design Not to Exceed $20.550.00 20 550.00 803. Construction Services r Not to Exceed 90.00 0.00 r t t t t D aTotalEx ense Technoland Cornmunkations 78670 6.011 4 716.00 Vehicle(ml)1172 .71 832.12 Soil Proctor 0 $360.OD $0.00 concrete Strenoth Testi Set of 4 0 1 $0.00 Mylar Record Drawings Set $200.OD $200.00 Miscellaneous ExDense 1.0% 150411.00 1.0% ;1504.11 Survey Equipment (day) 2.5 210.00 ;525.00 Project Total - Engineering Services//////////////////, $158,188.23 t N:\01IA063\ConbeusCnx\Contract P n d 06 -Main W Durston DesignNEAN D-6- Eng Fre Duston Ma -15 10/26MI6 b Morrison ME MEE Maierle engineers , surveyors , planners . scientists October 26, 2016 City of Bozeman, Economic Development Attn: David Fine 121 N. Rouse PO Box 1230 Bozeman, MT 59771-1230 2880 TECHNOLOGY BLVD. W • P.O. BOX 1113 • BOZEMAN, MT 59771 406.587.0721 • www.m-m.net Re: Bozeman — N. 71h Light Design & Construction Contract Amendment #6 -Signed MMI#: 0417.063 Mr. Fine: Please find two (2) signed originals of Amendment #6 to the PSA for the North 7th Lighting Design and Construction Administration project. This amendment does not change the overall contract amount, rather it shifts budget previously allocated for construction services to design engineering services. Essentially the existing construction engineering budget for West Main Street to West Villard Street is being transferred to the design engineering budget for West Villard Street to Durston Road. This allows Morrison-Maierle to complete the design of a larger stretch of roadway (Main to Durston) for submittal, review and approval by the City of Bozeman and the Montana Department of Transportation. This amendment also allows for landscape architectural services from West Villard to Durston Road. Included in this effort will be a conceptual design graphic that illustrates the design intent for the streetscape as well as a perspective (street view) rendering. These graphics will help with visually communicating the design intent with the Midtown Board, City of Bozeman, MDT, property owners along N 7th, the public and other stakeholders. See below for a simplified breakdown of the budget shifts. The contract amendment contains a more detailed breakdown. Scope of Work Previously Contracted Amendment #6 Contracted Main St. to Villard St. Design Eng. Services $75,351.03 $75,351.03 Main St. to Villard St. Construction Eng. Services $52,837.00 $0.00 Villard Street to Durston Rd. Design Eng. Services $0.00 $52,837.00 Villard St. to Durston Rd. Construction Eng. Services $0.00 $0.00 We create solutions that build better communities. AN EMPLOYEE -OWNED COMPANY - AN EQUAL OPPORTUNITY EMPLOYER — MINORITIES I FEMALES I DISABLED I VETERANS Morrison Maierle engineers • surveyors • planners � scientists The amendment and associated attachments are enclosed. As always, we appreciate the opportunity to work with you and look forward to continued service in the future. Please contact me at 922-6823 if you have any questions. Sincerely, Kevin Jacobsen, P.E., LEED AP Senior Civil Engineer Enclosure(s) N:\0417\063\Contracts-Clienl\Contract Amend #6 -Main to Durston Design\Contract Amend #6 Letter.docx