HomeMy WebLinkAbout12-12-16 CC Mtg - C6. Street Maintenance Fund CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Street Maintenance Fund Capital Improvement Plan (CIP)
for Fiscal Years 2018-2022
AGENDA ITEM TYPE: Consent
MEETING DATE: December 12, 2016
RECOMMENDATION: Adopt the Street Maintenance Fund Capital Improvement Plan
(CIP) for Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing various parts of the plan forward as items on the Consent agenda. We will
be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Street Maintenance Fund.
The Street Maintenance CIP encompasses the projects and equipment purchases that are not
Street and Curb Reconstructions in the Street Maintenance Fund.
Item of Note:
• Significant increases in Pavement Maintenance projects over the next 5 years are
scheduled including mill and overlay as well as chip seal projects of over $1,000,000
annually.
129
• PW04 Property on corner of Aspen & Rouse – Property for potential purchase in close
proximity to shops complex has been identified for expansion of the shops and offices.
This cost would be shared with Wastewater and Water utility funds.
• Routine replacement of equipment such as graders, sweepers, trucks, plows, etc in
the normal course of street maintenance are included.
• Revenue increases are a continuation of the policy we began in FY16; increasing the
assessment by $1 Million over 3 years, dedicated to pavement maintenance projects. We
will be in the third year of increases. FY18 will require an additional 9% increase to the
assessment to fund the mill and overlay & chip seal projects. After the FY18 increase, we
are estimating a small annual increase related to land (square-footage) annexations and
development.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
$3,673,147
$4,077,193 $4,158,737 $4,241,912 $4,326,750 $4,413,285
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
$4,500,000
$5,000,000
FY17 FY18 FY19 FY20 FY21 FY22
Total Estimated Revenues
130
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: December 2, 2016
Attached: Street Maintenance CIP
131
Street Maintenance District Capital Improvement PlanFinancial SummaryCurrent YearFY17 FY18 FY19 FY20 FY21 FY22UnscheduledProjected Beginning Reserve Balance Dedicated to CIP (481,014)$ (282,634)$ (377,529)$ 189,779$ 560,924$ 539,757$ Plus: Street Mtc Revenues Dedicated to CIP 1,101,944$ 1,590,105$ 1,621,907$ 1,654,346$ 1,687,433$ 1,721,181$ ‐$ Plus: Gas Tax693,936$ 693,900$ 693,900$ 693,900$ 693,900$ 693,900$ Less: Scheduled CIP Project Costs (1,597,500)$ (2,378,900)$ (1,748,500)$ (1,977,100)$ (2,402,500)$ (2,146,789)$ (3,401,210)$ Projected Year‐End Cash Dedicated to CIP (282,634)$ (377,529)$ 189,779$ 560,924$ 539,757$ 808,049$ Assumptions Made for Revenue Estimates: Current YearFY17 FY18 FY19 FY20 FY21 FY22Estimated Undesignated Annual Street Mtc Revenues 3,673,147$ 3,673,147$ 4,077,193$ 4,158,737$ 4,241,912$ 4,326,750$ Estimated Annual Increase ‐ Attributed to Annexations‐ 2% 2% 2% 2% 2% Annual Increase in Pavement Maintenance‐ 9% 0% 0% 0% 0%Total Estimated Revenues 3,673,147$ 4,077,193$ 4,158,737$ 4,241,912$ 4,326,750$ 4,413,285$ Current Revenues Dedicated to CIP % 20.0% 30.0% 39.0% 39.0% 39.0% 39.0% Plus: Increase Dedicated to CIP 10.0% 9.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 30.0% 39.0% 39.0% 39.0% 39.0% 39.0%Total Estimated Revenues Dedicated to CIP 1,101,944$ 1,590,105$ 1,621,907$ 1,654,346$ 1,687,433$ 1,721,181$ ProjectedProjectedCURRENT4,000,0003,500,0003,000,0002,500,0002,000,0001,500,0001,000,000500,0000Street Maintenance Projects & Equipment 132
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22Street Maintenance DistrictPW04ENGINEERINGPROPERTY ON CORNER OF ASPEN & ROUSE$100,000STR71‐18ENGINEERINGSTREET MAINTENANCE MILL & OVERLAY FY18$967,600STR71‐19ENGINEERINGSTREET MAINTENANCE MILL & OVERLAY FY19$554,500STR71‐20ENGINEERINGSTREET MAINTENANCE MILL & OVERLAY FY20$808,100STR71‐21ENGINEERINGSTREET MAINTENANCE MILL & OVERLAY FY21$964,000STR71‐22ENGINEERINGSTREET MAINTENANCE MILL & OVERLAY FY22$913,329STR72‐18ENGINEERINGSTREET MAINTENANCE CHIP SEAL FY18$185,300STR72‐19ENGINEERINGSTREET MAINTENANCE CHIP SEAL FY19$827,000STR72‐20ENGINEERINGSTREET MAINTENANCE CHIP SEAL FY20$913,000STR72‐21ENGINEERINGSTREET MAINTENANCE CHIP SEAL FY21$902,500STR72‐22ENGINEERINGSTREET MAINTENANCE CHIP SEAL FY22$727,460PW03PUBWORKS ADMINVEHICLE MAINTENANCE DESIGN & STORAGE CONSTRUCTION$50,000STR53PUBWORKS ADMENDENHALL & BABCOCK STREETSCAPE$2,076,210STR01STREETS OPREPLACE #1539 ‐ 2WD 1990 FORD RANGER$16,000STR01STREETS OPREPLACE #2749 ‐ 1997 FORD 1 TON MANUAL TRANSMISSION F350$45,000STR20STREETS OPANNUAL BIKE PATH IMPROVEMENTS$25,000$25,000$25,000$25,000$25,000STR22STREETS OPGRADER LEASE$40,000$40,000$40,000$40,000$40,000STR30STREETS OPANNUAL MEDIAN & BOULEVARD MAINTENANCE$55,000$55,000$55,000$55,000$55,000STR34STREETS OPSWEEPERS$100,000$100,000$100,000$100,000$100,000STR35STREETS OPREGENERATIVE AIR SWEEPER$250,000STR38STREETS OPMINI LOADER$90,000133
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22STR40STREETS OPDUMP TRUCK WITH PLOW & SANDER ‐ 2$200,000STR40STREETS OPDUMP TRUCK WITH PLOW & SANDER ‐ 1$180,000STR49STREETS OPSANDERS$16,000$16,000$16,000$16,000$16,000STR50STREETS OPPLOWS$10,000$10,000$10,000$10,000$10,000STR56STREETS OPTACK OIL DISTRIBUTION UNIT$90,000STR58STREETS OPTANDEM AXLE DUMP TRUCK WITH PLOW & SANDER$230,000$250,000STR62STREETS OPREPLACE #2751 ‐ WATER TRUCK$160,000STR63STREETS OPREPLACE SIGNAL AT BABCOCK & WILSON$750,000STR64STREETS OPSTEEL DRUM ROLLER & TRAILER$120,000STR67STREETS OPCOVERED STORAGE AT SHOPS COMPLEX$100,000STR73STREETS OPREPLACE SKID STEER$80,000STR74STREETS OPPAINT TRUCK$225,000STR68STREETS SIGNRECTANGULAR RAPID FLASHING BEACON$10,000$10,000$10,000$10,000$10,000Summary for Street Maintenance District (34 items)Totals by year:$2,402,500 $2,146,789$2,378,900$3,401,210FY21FY22FY18UnscheduledFY20$1,977,100$1,748,500FY19134
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
PW03
DEPARTMENT
PUBWORKS ADMIN
PROJECT NAME
Vehicle Maintenance Design & Storage Construction
FY18 FY19
$50,000
Unscheduled
DESCRIPTION OF PROJECT
Design and construct vehicle storage
Describe the criticality (i.e., importance) of this project to the operation: Having equipment, especially winter equipment, inside
and ready to go extends the life, produces less emissions by not having to warm up and shortens response time.
Which infrastructure assets are maintained by this equipment: All of our rolling stock and equipment.
How is efficiency improved with this equipment: The difference in getting in a motor grader that is parked inside vs. one that is
parked outside in -20 degree weather is enormous. Equipment stays in better shape. Much less wear and tear on drivetrain and
hydraulics. Easily adds an hour of productivity to every shift.
How is this project leveraged with other stakeholders/projects/funds: By being located next to existing city property, we could
aggregate the lots giving even more useful space.
ALTERNATIVES CONSIDERED
Not build and only use for outdoor storage.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Equipment continues to degrade from the sun and exposure. Large inside
storage for several departments. Equipment would be located next to current Vehicle Maintenance Shop. Good access onto Rouse and
Griffin. Early morning shift equipment could be stored here so as not to disturb the neighbors in this mostly zoned Industrial area. With this
building, Streets could switch to producing our own brine solution for pre wet of the sand. We wouldn't have to use mag chloride which is
about 4-5 times more expensive than salt brine. Gallatin County has expressed interest in buying brine from us.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal building maintenance. Possibly heat with waste oil from the Shops. Possibly heat with wood chips from Forestry.
FUNDING SOURCES
This project totals $200,000. It will be split evenly 4 ways: Water Fund ($50,000), Wastewater Fund ($50,000), Street Maintenance ($50,000),
and Parks ($50,000).
New
Replacement
Equipment
Project
FY20 FY21 FY22
135
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
PW04
DEPARTMENT
ENGINEERING
PROJECT NAME
Property on Corner of Aspen & Rouse
FY18
$100,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Property Purchase to expand shops area and potentially offices. This is an opportunity to make more land available for project
PW01-SH - Shops Expansion.
ALTERNATIVES CONSIDERED
Do not purchase the property. Wait to purchase at a later date.
ADVANTAGES OF APPROVAL
Larger contiguous land area for City Shops. The Shops Expansion project has been a scheduled CIP for a number of years. This item could
bring an important piece of land into that project area, making a better-functioning property at Rouse and Tamarack.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Building Maintenance would be needed to keep the existing structure useful.
FUNDING SOURCES
Split 33/33/33 between Water, Wastewater and Street Maintenance Funds.
New
Replacement
Equipment
Project
FY20 FY21 FY22
136
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR01
DEPARTMENT
STREETS OP
PROJECT NAME
Replace #1539 - 2WD 1990 Ford Ranger
FY18 FY19
$16,000
Unscheduled
DESCRIPTION OF PROJECT
Replace #1539 -2WD 1990 Ford Ranger With Hybrid Sedan. We would buy one of the Public Works lease hybrids. Their lease
ends August
Describe the criticality (i.e., importance) of this project to the operation: Currently when we need to do inspections, inventories,
GIS, training trips or take several people on route training, we use several vehicles or make several trips. A hybrid sedan to
replace the truck would be much more useful.
Which infrastructure assets are maintained by this equipment: Streets, luminaires, sidewalks, curbs, signs.
How is efficiency improved with this equipment: Able to carry up to 4 people at a time in a hybrid sedan.
What is the impact (i.e., scope-of-use) for this equipment: For inventories, GIS, training trips and route training. Would be
available to other departments as needed.
ALTERNATIVES CONSIDERED
Drive it until it dies.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Poor use of time. Excessive emissions. Continued use of two vehicles
when a 4 passenger car would work. A much more useable year round vehicle. Better fuel mileage and lower emissions.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
137
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR01
DEPARTMENT
STREETS OP
PROJECT NAME
Replace #2749 - 1997 Ford 1 Ton Manual Transmission F350
FY18 FY19
$45,000
Unscheduled
DESCRIPTION OF PROJECT
Replace #2749 - 1997 Ford 1 Ton Manual Transmission F350
Describe the criticality (i.e., importance) of this project to the operation: Setting up and mobilizing to the job site is done with
this truck and a trailer. Being able to leave the truck hooked up to the trailer during the project helps with transporting and also
utilizing the smallest work area in neighborhoods. Single pieces of equipment scattered over blocks in the core not only
inconveniences the residents where we are working but affects the surrounding blocks as well.
Which infrastructure assets are maintained by this equipment: Streets and alleys.
How is efficiency improved with this equipment: Mainly used to haul large equipment to the job site. Without this truck
operating reliably, we have to drive equipment to the site which can take a paver or skid steer more than an hour to travel
through town.
What is the impact (i.e., scope-of-use) for this equipment: Pulling large trailers and normal one ton uses.
Are there other affected projects: This truck is used to haul equipment to paving projects.
ALTERNATIVES CONSIDERED
Drive it until it dies.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: More people and more equipment used to complete projects.
A much more useable year round truck. Better fuel mileage and lower emissions. We are spending about $.90 per mile on maintenance and
repairs. A new vehicle spends about $.05 per mile on M&R. Anytime M&R exceed $.50 per mile, it is time to consider removing the truck from
the fleet.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
138
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR20
DEPARTMENT
STREETS OP
PROJECT NAME
Annual Bike Path Improvements
FY18
$25,000
FY19
$25,000
Unscheduled
DESCRIPTION OF PROJECT
This item would provide for bike-related infrastructure including (but, not limited to) racks, signs, striping, curb-cuts, and
separated pathways.
Describe the criticality (i.e., importance) of this project to the operation: Medium.
How is capacity affected by this project: The Greater Bozeman Area Transportation Plan (2007 Update) Section 5.4
Recommended Bicycle Facility Improvements outlines many facilities. The Bozeman Area Bicycle Advisory Board (BABAB) gave
the City their top 2 priorities: They are listed with City Engineering cost estimates: North 11th Ave - Mendenhall to Durston,
$14,500: Willson Ave - Main Street to Kagy Blvd, $54,300.
How is connectivity affected by this project: Enhanced.
What safety or risk measures are mitigated with this project: Allows for safer bike usage.
What regulations or standards are attained with this project: Conformance with Transportation Plan recommendations.
How is this project leveraged with other stakeholders/projects/funds: Can be combined with street re-surfacing projects.
Are there other affected projects: Can be coordinated with street re-surfacing projects.
ALTERNATIVES CONSIDERED
Continue with existing infrastructure.
ADVANTAGES OF APPROVAL
Safety will likely be improved.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No additional operating costs.
FUNDING SOURCES
100% Street Maintenance Fund
New
Replacement
Equipment
Project
FY20
$25,000
FY21
$25,000
FY22
$25,000
139
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR22
DEPARTMENT
STREETS OP
PROJECT NAME
Grader Lease
FY18
$40,000
FY19
$40,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request to establish at a minimum a 20 year replacement schedule for our graders. Currently our fleet is comprised of a
1994, 1998, 2003, 2007, and 2014.
Describe the criticality (i.e., importance) of this project to the operation: Grading the residential streets is critical to safe travel of
our citizens. Pulling the snow out from the curb so it can be blown into trucks and hauled away is important to parking in the
downtown and other business areas.
Which infrastructure assets are maintained by this equipment: Streets.
How is efficiency improved with this equipment: With all wheel drive our productivity increases. Newer equipment has less
breakdowns and better fuel economy which means less time in the shop and fueling during a shift.
What is the impact (i.e., scope-of-use) for this equipment: Grading local streets.
How is this project leveraged with other stakeholders/projects/funds: The old grader would be traded in or auctioned.
ALTERNATIVES CONSIDERED
Budget 250k every 5 years to purchase. Cut back on our use of graders in the residential areas. Continue to use what we have and replace
when we have complete failure.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Although the industry standard schedules a 15 year replacement, we
believe our extensive preventative maintenance schedule will allow us to get 20 years out of a grader. Much more reliable and fuel efficient
equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in costs due to newer equipment.
FUNDING SOURCES
100% Street Maintenance Revenue
New
Replacement
Equipment
Project
FY20
$40,000
FY21
$40,000
FY22
$40,000
140
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR30
DEPARTMENT
STREETS OP
PROJECT NAME
Annual Median & Boulevard Maintenance
FY18
$55,000
FY19
$55,000
Unscheduled
DESCRIPTION OF PROJECT
This is a request for money to be used for maintaining and upgrading our medians.
ALTERNATIVES CONSIDERED
None.
ADVANTAGES OF APPROVAL
Making our currently unmaintained medians into weed free low maintenance show pieces. We are partnering internally with the Water
Conservation Manager and externally with MSU to design and install low water easily maintained medians. Also contract out the maintenance
on our established medians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None. Lower water use means lower utility costs.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20
$55,000
FY21
$55,000
FY22
$55,000
141
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR34
DEPARTMENT
STREETS OP
PROJECT NAME
Sweepers
FY18
$100,000
FY19
$100,000
Unscheduled
DESCRIPTION OF PROJECT
This is for leasing or purchasing through the MACI (Montana Air and Congestion Initiative) equipment purchase program. These
are mechanical sweepers that if necessary can be operated without using water. The next sweeper we would replace is our 2005
model with 59,000 miles and 9372 hours. It is scheduled for an elevator replacement next year and we would like to replace
rather than repair at a cost of $15,000. Industry standards show it is best to replace municipal sweepers at 5 years. We are able
to get about 10 years due to our excellent maintenance program.
Describe the criticality of this project to the operation: The City's MS4 Stormwater Permitting requires sweeping up sand and
dirt before it can enter waterways. Clean streets/ bike lanes are a quality of life issue. We are required to meet the goal of
sweeping all local streets twice per year, monthly sweeping of all arterial and collector roadways and weekly sweeping of Main
Street, most bike lanes weekly during the summer. Heavy development activity requires additional sweeping in construction areas.
Which infrastructure assets are maintained by this equipment: Streets, parking lots, Stormwater intakes and Bozeman's air quality.
How is efficiency improved with this equipment: Sweepers are very high maintenance as they age. Leases terms for sweepers are
a maximum of 5 years due to life expectancy. We are currently in the 3rd year of one lease. This additional sweeper lease would
replace our oldest sweeper a 2006.
How is this project leveraged with other stakeholders/projects/funds: We submit every year to the Montana Department of
Transportation's (MDT) Montana Air and Congestion Initiative (MACI) equipment purchase program for sweepers. With this
program, MACI pays for 87% and we pay 13% for a sweeper. If we are chosen, we would use our lease payment to fund our
share of the cost which would be ~$34,000.
Other affected projects: Stormwater contractor compliance, spring and fall street cleaning, pre sweep for pavement painting.
ALTERNATIVES CONSIDERED
Budget 250k every year until all sweepers are replaced. Cut back on our sweeping There are no local contractors at this time. Continue to use
what we have.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Major repairs. Downtime and not being able to complete sweeping
routes. Increased discharge to waterways and increase in particulate mater, reducing air quality. Much improved operations. Better air quality.
Improved storm water discharge.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20
$100,000
FY21
$100,000
FY22
$100,000
142
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR35
DEPARTMENT
STREETS OP
PROJECT NAME
Regenerative Air Sweeper
FY18 FY19 Unscheduled
$250,000
DESCRIPTION OF PROJECT
Regenerative Air Sweeper
Describe the criticality (i.e., importance) of this project to the operation: We have had demonstrations of these sweepers and
their ability to get the fine particles off of the pavement is noticeable. As air quality and Stormwater discharge regulations tighten,
we may be forced to use regenerative type sweepers or at the very least have one in our fleet to do the final sweeping pass to
get the <1 micron particles that can become airborne.
Which infrastructure assets are maintained by this equipment: Streets.
How is efficiency improved with this equipment: Rather than make several passes with our mechanical sweepers, an RA sweeper
could get it done in one pass. The one drawback is that RA sweepers can not be used below freezing. They need water at all
times.
How is this project leveraged with other stakeholders/projects/funds: Possible MDT MACI funds.
Are there other affected projects: Compliance with Stormwater permitting.
ALTERNATIVES CONSIDERED
Only use mechanical sweepers which discharge dust when sweeping.
ADVANTAGES OF APPROVAL
What is the impact (i.e., scope-of-use) for this equipment: All sweeping operations.
What are the implications of deferring the purchase of this equipment: Continue to make several passes and never getting the fine particles.
We could improve our discharge into the storm water system. Spring sweeping of the winter sand would generate less dust therefore
eliminating complaints from citizens and DEQ.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal sweeper maintenance costs.
FUNDING SOURCES
100% Street Maintenance District
New
Replacement
Equipment
Project
FY20 FY21 FY22
143
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR38
DEPARTMENT
STREETS OP
PROJECT NAME
Mini Loader
FY18
$90,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
This request is for a mini loader that would be used for sidewalk maintenance, removal, and repair. Will also be used in curb
repairs and alley maintenance. Using a smaller loader allows us to only close the parking lane and keep traffic flowing. Loader
will accept attachments such as bucket, bucket with thumb, brooms and plows that we already have.
Describe the criticality (i.e., importance) of this project to the operation: It would be useful in tight situations where a full size
loader wouldn't fit, such as when the mini excavator is being used and material needs to be moved off site.
Which infrastructure assets are maintained by this equipment: This loader will accept many attachments that we already have,
such as brooms, sweepers, and plows.
How is efficiency improved with this equipment: Currently we are using full size loaders for repairs. It will be safer and more
efficient to use equipment sized for the smaller jobs.
What is the impact (i.e., scope-of-use) for this equipment: Anywhere a loader is needed this can be used. It is safer in the tight
situations to use smaller equipment.
How is this project leveraged with other stakeholders/projects/funds: This loader would be available for use in other departments.
ALTERNATIVES CONSIDERED
No comparable equipment is available for rent.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Wear and tear on our large loaders. Tying up the large loaders on
smaller jobs when the loader can be used on asphalt and gravel road projects.
This loader will give us another piece of equipment that will utilize our attachments. The compact size will allow us to get in spaces that we
wouldn’t normally be able to access.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
144
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR40
DEPARTMENT
STREETS OP
PROJECT NAME
Dump Truck With Plow & Sander - 1
FY18
$180,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
The 1990 Dump truck will be 28 years old with 82,000 in town miles and over 10,000 hours. Parts have been discontinued. We
have had to patch the leaking gas tank because a replacement is not available. When the other rusted spots start leaking we will
be forced to park the truck. The motor is so tired that we are removing the plow this winter because it doesn’t have the power
to plow and sand uphill. We average about $1,200 per year in repairs and maintenance. The running and floor boards are rusted
through but we are able to cover them with old mud flaps to make it drivable. Parts availability will be what stops this truck.
Describe the criticality (i.e., importance) of this project to the operation: Single axle dump trucks are used on smaller projects in
the summer including alley maintenance, asphalt patching and debris pickup. In the winter these trucks are the only equipment
we can safely and efficiently plow the narrow streets. We are able to haul snow in tight quarters also.
Which infrastructure assets are maintained by this equipment: This will replace a 1990 underpowered gasoline engine dump truck
that averages about 3 MPG when used for plowing operations. The FY21 request will replace a 1993 underpowered gasoline
engine dump truck.
How is efficiency improved with this equipment: The new truck could be fueled with alternative fuels such as Biodiesel. Estimates
show that the 1990 spews over 30 tons of CO2 into the air per year and by removing this from our fleet will help us reach our
goal of reducing municipal greenhouse emissions 15% below 2000 levels by 2020.
What is the impact (i.e., scope-of-use) for this equipment: Much more reliable, safer and environmentally friendly than our
current model. This truck will be used in all aspects of our operations.
How is this project leveraged with other stakeholders/projects/funds: Could be used by other departments.
ALTERNATIVES CONSIDERED
Continue with 1990 model.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Chance of catastrophic failure of the underpowered gasoline trucks.
Efficiency, less emissions, safety, fuel savings and more reliable equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than current model.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
145
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR40
DEPARTMENT
STREETS OP
PROJECT NAME
Dump Truck With Plow & Sander - 2
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
The 1993 Dump truck will be 25 years old with 51,025 in town miles and over 5400 hours. Parts have been discontinued. We
had to replace the fuel tank with a used diesel tank (new tanks no longer available) and since have spent over $4,000 on fuel
related repairs. Over the past 5 years we have spent almost $16,000 in repairs. Fuel issues and parts availability will be what
stops this truck.
Describe the criticality (i.e., importance) of this project to the operation: The new truck could be fueled with alternative fuels
such as Biodiesel. Estimates show that the 1993 spews over 30 tons of CO2 into the air per year and by removing this from our
fleet will help us in our goal of reducing municipal greenhouse emissions 15% below 2000 levels by 2020.
Which infrastructure assets are maintained by this equipment: This will replace a 1993 underpowered gasoline engine dump truck
that averages about 3 MPG when used for plowing operations.
How is efficiency improved with this equipment: The new truck could be fueled with alternative fuels such as Biodiesel which is
more fuel efficient with less emissions.
What is the impact (i.e., scope-of-use) for this equipment: Much more reliable, safer and environmentally friendly than our
current model. This truck will be used in all aspects of our operations.
ALTERNATIVES CONSIDERED
Continue with 1993 model.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Chance of catastrophic failure of the underpowered gasoline trucks.
Efficiency, less emissions, safety, fuel savings and more reliable equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than current model.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21
$200,000
FY22
146
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR49
DEPARTMENT
STREETS OP
PROJECT NAME
Sanders
FY18
$16,000
FY19
$16,000
Unscheduled
DESCRIPTION OF PROJECT
Sanders are used in a very corrosive and abrasive environments. We rebuild the conveyor and hydraulic system in the first 4
years. If we don’t have a have a catastrophic failure in the next 2-3 years, the V box and structural components start to fail in the
7th year. By replacing the sander every 8 years (we now have 8 sanders), we can avoid having a season ending failure. Sanders are
about 6 months out when ordering so we would never get a new one in the same season that we needed a replacement. We
have two different sizes so we could run them until they fail during a major storm and then have one of each size sitting here.
The problem with that is the new sanders would be aging without being used. Using this method we could have two failures in
one year and be short one sander.
Describe the criticality (i.e., importance) of this project to the operation: If we can't put down sand or deicer during the winter,
we fail to service our citizens. Not being able to control the quantity, means we are either putting down too much or too little
product. Too much sand and we increase our spring sweeping and too little sand and the crashes increase.
How is efficiency improved with this equipment: Less down time during a storm for repairs. Less preseason maintenance needed
with newer more reliable equipment. Able to more accurately control quantities.
What is the impact (i.e., scope-of-use) for this equipment: Sanding in the winter.
Are there other affected projects: Everyone that has to stop or get up a hill in the winter are affected by whether our sanders are
operating.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Sanders wear out every 5 years, depending on the winter. We have
seven sanders, so we will make them last 7 years. Major breakdowns in the middle of winter can put a sander out of service for weeks if not
months. More reliable sanders. Less failures in the middle of a storm.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in maintenance costs.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20
$16,000
FY21
$16,000
FY22
$16,000
147
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR50
DEPARTMENT
STREETS OP
PROJECT NAME
Plows
FY18
$10,000
FY19
$10,000
Unscheduled
DESCRIPTION OF PROJECT
This is to replace the worn plow blades.
Describe the criticality (i.e., importance) of this project to the operation: Critical to have fully operational plows. With as much
as a 90 day delivery time to replace a plow, it is important to replace them before they fail.
Which infrastructure assets are maintained by this equipment: We have 7 large plows so they will be on a 7 year replacement
schedule.
How is efficiency improved with this equipment: When the moldboard of the plow gets bent after several years of use, it is very
difficult to bolt on a replacement cutting edge. If they are not tight to the cutting edge surface they face early failure and require
replacement at inopportune times.
What is the impact (i.e., scope-of-use) for this equipment: Plowing snow.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Failure during a snowstorm and possibility of not getting a replacement
during the winter season. A much more efficient plow operation. Less time spent replacing cutting edges that prematurely break.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20
$10,000
FY21
$10,000
FY22
$10,000
148
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR53
DEPARTMENT
PUBWORKS ADMIN
PROJECT NAME
Mendenhall & Babcock Streetscape
FY18 FY19 Unscheduled
$2,076,210
DESCRIPTION OF PROJECT
Conduct Streetscape Improvements Along Mendenhall & Babcock (On Hold For SID Development)
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
New
Replacement
Equipment
Project
FY20 FY21 FY22
149
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR56
DEPARTMENT
STREETS OP
PROJECT NAME
Tack Oil Distribution Unit
FY18
$90,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
The 1971 Distributor will be 47 years old, mileage and hours are unknown as the meters quit working accurately long ago, and
parts for the truck and oil distributor unit have been discontinued. Due to lack of available parts, we recently had to convert the
rear axle to a wet system. Parts are no longer available for the pre heat system. Therefore, someone has to come in early to heat
the oil so we can spray tack oil after 8. The distributor is a two man system. One drives and the other rides on the back to
engage the clutch for the tack oil. Not a safe way to spray oil. Application rates on the unit are controlled by the speed of the
truck. The guy riding on back has to yell to the driver to speed up or slow down as needed. We have only spent ~$2,500 on this
truck in the last 5 years because parts are not available. We have been jury-rigging burners and drive trains to get it to work one
more time. We think there is some interest in donating this to a museum if we do get a replacement.
Describe the criticality (i.e., importance) of this project to the operation: Critical to our paving operation. If our 1971 unit failed
in the middle of a job, we couldn't continue to pave.
Which infrastructure assets are maintained by this equipment: This is used to spray tack oil on asphalt patches and paving.
Currently we are using the 1971 unit or doing it by hand with our patch truck.
How is efficiency improved with this equipment: Less chance for an oil spill. Able to calibrate to dispense the exact amount
needed for the job. Not having to have workers ride on the back of the unit to engage the spray bar. Currently in order to
control the amount of tack oil being put down, the operator on the back of the truck hand signals to the driver to go faster or
slower as needed. This means the driver is constantly watching his mirrors instead of the road.
What is the impact (i.e., scope-of-use) for this equipment: Used for tack oil for paving, mill and overlays and large patches.
How is this project leveraged with other stakeholders/projects/funds: Patching and paving for other departments.
ALTERNATIVES CONSIDERED
Continue to use what we have when it runs.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Chance of equipment failure during operations. More reliable and safer
unit. Less chance of major spill.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Costs will be less with the newer unit.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
150
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR58
DEPARTMENT
STREETS OP
PROJECT NAME
Tandem Axle Dump Truck With Plow & Sander
FY18
$230,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace a 1994 tandem axle truck with 128,000 miles and over 11,000 hours.
Describe the criticality (i.e., importance) of this project to the operation: It is very important that we get the arterials and
collectors done before 8 AM. When a tandem axle 10 yard truck is down for any period of time, the backup is a 1990 gas engine
single axle 4 yard truck which takes twice as long to finish a route if it stays in operation for the entire shift. Not acceptable to
our customers.
Which infrastructure assets are maintained by this equipment: All streets and alleys. With the widening of multiple collectors and
arterials, the continued need for a larger capacity truck to finish plow and sanding routines is critical to maintaining our service to
the traveling public.
How is efficiency improved with this equipment: During paving operations, being able to haul twice as much asphalt cuts down on
the number of trips to the asphalt plant. This make she paving crew more efficient and uses less fuel.
What is the impact (i.e., scope-of-use) for this equipment: Plowing, sanding, hauling and paving.
How is this project leveraged with other stakeholders/projects/funds: The 1994 truck would be used as a backup in the winter
and still be used for paving instead of a single-axle truck.
Are there other affected projects: Snow plowing, snow hauling and paving.
ALTERNATIVES CONSIDERED
Continue with no tandem back up in the winter. Run single axle 4 yard dump trucks with asphalt operations
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Hope that none of our tandem axle trucks break down during a storm or
paving operations.
Reliability, efficiency, less emissions and safety.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Less than the current model.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
$250,000
151
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR62
DEPARTMENT
STREETS OP
PROJECT NAME
Replace #2751 - Water Truck
FY18
$160,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
This request is to replace a 1995 water truck (#2751) with 500,000 miles. This truck is used in the summer to water and also
apply dust control to gravel streets. Also used to wash concrete medians. In the winter it can be used for de-icer or to apply
anti-icing before a storm.
Describe the criticality (i.e., importance) of this project to the operation: Very important in the maintenance of our gravel roads.
Without a water truck, the roads would become washboard and all the gravel fines would end up in the ditch. If we couldn't
apply dust control, air quality would suffer in the neighborhoods.
Which infrastructure assets are maintained by this equipment: All streets, gravel and paved.
How is efficiency improved with this equipment: The new water truck will be an automatic transmission so that all CDL license
holders can drive. Title 49 of the Code of Federal Regulations (CFR) 383.95c now requires that if you test for your CDL in an
automatic truck then you can not drive a manual transmission truck. Because we need our new recruits to pull a trailer while
testing, we can not test with our current water truck because it can't tow a trailer.
What is the impact (i.e., scope-of-use) for this equipment: Watering gravel roads, washing streets and concrete medians, and
applying de-icer.
How is this project leveraged with other stakeholders/projects/funds: Occasionally, water trucks become available in the MACI
program. We will pursue if they become available in the MACI equipment program.
ALTERNATIVES CONSIDERED
Let employees hired before 2015 drive it until it dies. Lease or rent.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: It has a manual transmission and with CDL laws making you test in the
type of transmission that you will drive, new employees can't test in it and therefore, can't operate it.
Everyone can drive it, less down time due to failures, more fuel efficient and less emissions.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
152
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR63
DEPARTMENT
STREETS OP
PROJECT NAME
Replace Signal At Babcock & Wilson
FY18 FY19 Unscheduled
$750,000
DESCRIPTION OF PROJECT
Upgrade Signal At Babcock & Wilson
How is capacity affected by this project: Underground conduit is full and failing. Pedestrian functions should be upgraded to new
type such as count down and vibratory tactile.
What safety or risk measures are mitigated with this project: This signal can't have Opticom for fire trucks
What regulations or standards are attained with this project: Also should conform with ADA.
ALTERNATIVES CONSIDERED
Leave as is until failure.
ADVANTAGES OF APPROVAL
Fire department can use Opticom to pass through the light. ADA requirements would be met. Room for future expansion in the conduit.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance.
FUNDING SOURCES
Arterial and Collector Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
153
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR64
DEPARTMENT
STREETS OP
PROJECT NAME
Steel Drum Roller & Trailer
FY18
$120,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
This is a request for a larger roller for our paving operations.
Describe the criticality (i.e., importance) of this project to the operation: This roller will allow us to get better compaction
therefore, giving a better finished product. Milling and paving salvageable portions of our local roadways is a key strategy for
extending the life of existing local streets until they can be reconstructed.
Which infrastructure assets are maintained by this equipment: Paved streets.
How is efficiency improved with this equipment: The roller we currently have is for smaller projects and tighter areas.
What is the impact (i.e., scope-of-use) for this equipment: Compacting asphalt paving projects.
Are there other affected projects: In house paving projects.
ALTERNATIVES CONSIDERED
Rent if/when available. Lease. Rental rates are $1000.00 per week without a trailer.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: If a rental roller is not available, we can't pave local streets. Best paving
possible for longer pavement life. Improve PCI.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
154
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR67
DEPARTMENT
STREETS OP
PROJECT NAME
Covered Storage At Shops Complex
FY18 FY19 Unscheduled
$100,000
DESCRIPTION OF PROJECT
Covered Storage At Shops Complex
Describe the criticality (i.e., importance) of this project to the operation: Getting equipment parked inside greatly extends the life
of the equipment.
Which infrastructure assets are maintained by this equipment: All of our rolling stock and equipment.
How is efficiency improved with this equipment: The difference in getting in a motor grader that is parked inside vs. one that is
parked outside in -20 degree weather is enormous. Equipment stays in better shape. Much less wear and tear on drivetrain and
hydraulics. Easily adds an hour of productivity to every shift.
What is the impact (i.e., scope-of-use) for this equipment: Equipment and vehicle storage.
What are the implications of deferring the purchase of this equipment: Equipment continues to degrade from the sun and
exposure.
How is this project leveraged with other stakeholders/projects/funds: At the proper site we could build one big enough to house
other departments equipment. Project is split 50% Street Maintenance Fund, 20% Water Fund, & 25% Wastewater Fund.
Are there other affected projects: Depends where this building is located.
ALTERNATIVES CONSIDERED
Keep parking millions of dollars’ worth of equipment outside.
ADVANTAGES OF APPROVAL
Better equipment management.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal building maintenance.
FUNDING SOURCES
50% Street Maintenance Fund, 25% Water Fund, 25% Wastewater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
155
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR68
DEPARTMENT
STREETS SIGN
PROJECT NAME
Rectangular Rapid Flashing Beacon
FY18
$10,000
FY19
$10,000
Unscheduled
DESCRIPTION OF PROJECT
This request is for a rectangular rapid flashing beacon.
Describe the criticality (i.e., importance) of this project to the operation: We get several requests a year for these and would like
to have one ready to install. These would be similar to the unit installed on Kagy at 7th avenue.
Which infrastructure assets are maintained by this equipment: Crosswalks.
How is efficiency improved with this equipment: RRFB's have shown to increase visibility of pedestrians in crosswalks which in
turn increases safety of the pedestrian.
What is the impact (i.e., scope-of-use) for this equipment: High pedestrian use intersections.
How is this project leveraged with other stakeholders/projects/funds: In the past we have had the Bozeman School District and
the Bozeman Police Foundation contribute to the cost of these.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Not having a unit in stock may increase the time to respond to requests.
By having one on hand, we are able to install it in the same construction season it is requested without waiting for a budget cycle.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20
$10,000
FY21
$10,000
FY22
$10,000
156
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71-18
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Mill & Overlay FY18
FY18
$967,600
FY19 Unscheduled
DESCRIPTION OF PROJECT
Mill & Overlay Story Mill Rd (Bridger Dr to Caddie Ct), Lincoln St (19th to S 11th), Grant (S 6th to Willson), Willson (Kagy to
Babcock), Church (Story to Olive), Church (Babcock to Davis), College (8th to 11th), and Lamme (Church to Broadway).
Describe the criticality (i.e., importance) of this project to the operation: High
How is capacity affected by this project: We plan to mill and overlay 3.8 miles in FY18, 2.4 miles in FY19, 2.4 miles in FY20, 2.7
miles in FY21, and 2.8 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation, mitigation of failed pavement sections.
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects
Are there other affected projects: Coordination needed with any utility replacement projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
157
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71-19
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Mill & Overlay FY19
FY18 FY19
$554,500
Unscheduled
DESCRIPTION OF PROJECT
Mill & Overlay S 23rd Ave (College to Main), Babcock (Main to 11th), Koch (23rd to 11th), and S 20th Ave (Koch to Babcock)
Describe the criticality (i.e., importance) of this project to the operation: High.
How is capacity affected by this project: We plan to mill and overlay 3.8 miles in FY18, 2.4 miles in FY19, 2.4 miles in FY20, 2.7
miles in FY21, and 2.8 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation, mitigation of failed pavement sections.
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
Are there other affected projects: Coordination needed with any utility replacement projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
158
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71-20
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Mill & Overlay FY20
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Mill & Overlay Tamarack (7th to Rouse), Aspen (7th to 5th), Peach (7th to Rouse), N 5th Ave (Peach to Tamarack), N 3rd
(Peach to Tamarack), and Willson (Main to Cottonwood).
Describe the criticality (i.e., importance) of this project to the operation: High.
How is capacity affected by this project: We plan to mill and overlay 3.8 miles in FY18, 2.4 miles in FY19, 2.4 miles in FY20, 2.7
miles in FY21, and 2.8 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation, mitigation of failed pavement sections.
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects
Are there other affected projects: Coordination needed with any utility replacement projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20
$808,100
FY21 FY22
159
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71-21
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Mill & Overlay FY21
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Mill & Overlay Durston (Hanson St to 7th) and Simmental Way.
Describe the criticality (i.e., importance) of this project to the operation: High.
How is capacity affected by this project: We plan to mill and overlay 3.8 miles in FY18, 2.4 miles in FY19, 2.4 miles in FY20, 2.7
miles in FY21, and 2.8 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation, mitigation of failed pavement sections
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects
Are there other affected projects: Coordination needed with any utility replacement projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21
$964,000
FY22
160
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR71-22
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Mill & Overlay FY22
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Mill & Overlay S 3rd from Goldenstein to Kagy) and Griffin (7th to Rouse)
Describe the criticality (i.e., importance) of this project to the operation: High.
How is capacity affected by this project: We plan to mill and overlay 3.8 miles in FY18, 2.4 miles in FY19, 2.4 miles in FY20, 2.7
miles in FY21, and 2.8 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation, mitigation of failed pavement sections
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects
Are there other affected projects: Coordination needed with any utility replacement projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
$913,329
161
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72-18
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Chip Seal FY18
FY18
$185,300
FY19 Unscheduled
DESCRIPTION OF PROJECT
Chip Seal Highland Blvd, Ellis St, Old Highland Blvd, Kenyon Dr (Josephine to the end), O’Connell Dr, Berthot Dr, Chambers Dr,
Baxter Dr, Knaab Dr, Lomas Dr.
Describe the criticality (i.e., importance) of this project to the operation: Medium-high.
How is capacity affected by this project: We plan to chip seal 4.4 miles in FY18, 18.7 miles in FY19, 15.6 miles in FY20, 19.3 miles
in FY21, and 13.7 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation.
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
162
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72-19
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Chip Seal FY19
FY18 FY19
$827,000
Unscheduled
DESCRIPTION OF PROJECT
Chip Seal W Oak (Ferguson to 19th), Ferguson (Fallon to Oak), Babcock (Meagher to Main), Fowler (Garfield to Babcock),
Resort Dr (Huffine to Babcock), Fallon (Ferguson to Fowler), Laramie Dr, Granite Ave, Laredo Dr, Prairie Ave, Laredo Dr,
Golden Valley Dr, Pondera Ave, E Granite Ave, Powder River Ave, Treasure Ave, Stillwater Ave, Ginella Way, Sheridan Pl, S
Sweetgrass Ave, Broadwater St, Choteau Ave, Teton Ave, Sheridan Ave (Broadwater to Durston), N Sweetgrass Ave, Meagher
(Babcock to Oak), Flathead Ave, N Sanders Ave, Mineral Ave, Toole St (Ferguson to the end), Cascade St (Ferguson to the end),
Carbon St, Diamond St, Sunstone St (Ferguson to Sanders), Moonstone Dr (Ferguson to Sanders), Annie St (Ferguson to Hanson
St), Renova Ln (Ferguson to the end), Tanzanite Dr, Opal St, Agate Ave, Bur Ave, Laduke St, Pin Ave, Yellowstone Ave (Durston
to Oak), Palm St, Potosi St, Jardine Ave, Pipestone St, Corwin St, Beaverhead St.
Describe the criticality (i.e., importance) of this project to the operation: Medium-high.
How is capacity affected by this project: We plan to chip seal 4.4 miles in FY18, 18.7 miles in FY19, 15.6 miles in FY20, 19.3 miles
in FY21, and 13.7 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
163
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72-20
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Chip Seal FY20
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Chip Seal W Beall St (25th to 15th), N 23rd Ave, N 22nd Ave (Beall to Durston), N 21st Ave (Beall to Durston), N 20th Ave
(Main to Durston), N 18th Ave, N 17th Ave (Beall to Durston), N 16th Ave, N 15th Ave (Main to Patrick), Kagy (19th west),
Stockman Way, S 22nd Ave, Remington Way, S 11th (Kagy to Opportunity Way), Opportunity Way, Graf (19th to 27th), Golden
Sun Dr, S 27th Ave (Blackwood to Graf), Parkway Ave, Kurk Dr, S 31st Ave, S 30th Ave, S 29th Ave, S 28th Ave, S 26th Ave,
Meah Ln, Parkway Ave, S Tracy Ave, Hill St, Highland Ct, Spring Creek Dr (3rd to Tracy), Circle Dr, S 15th Ave, Summer View
Ln, Spring Ridge Dr, Madrona Ln, S 11th Ave, Hidden Springs Ln, Summerset Dr, Hillcrest Dr, Gardenbrook Ln, Alder Creek Dr,
Cambridge Dr, Fieldstone Dr, Fieldstone Dr W, Concord Dr, Lexington Dr, Park Pl, Oxford Dr, Cornell Dr, Stanford Dr,
Princeton Pl, Dartmoth Dr, Silverwood Dr, Heritage Dr.
Describe the criticality (i.e., importance) of this project to the operation: Medium-high.
How is capacity affected by this project: We plan to chip seal 4.4 miles in FY18, 18.7 miles in FY19, 15.6 miles in FY20, 19.3 miles
in FY21, and 13.7 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20
$913,000
FY21 FY22
164
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72-21
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Chip Seal FY21
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Chip Seal Laurel Glen Streets, Trout Meadows Rd, Fen Way, Catamount St (Davis Ln to N 27th), Sora Way, Sundew Ln,
Blackbird Dr (Lori Ln to Catamount), Warbler Way, Catalyst St, Floxtail St, Downy Ln, Savannah St, Catkin Ln, Hamilton Ct,
Marlyn Ct, N 27th Ave (Cattail to Catamount), Cattail St (Davis Ln to Ferguson), Kimberwicke St, Thoroughbred Ln, Farrier Ln,
Andalusian Ave, Arabian Ave, McCafferty St, Equestrian Ln (Harper Puckett to Arabian), Danube St, Draft Horse Dr, Lasso Ave,
N Ferguson Ave (Baxter to Cattail), Equestrian Ln (Lasso to Vaquero Pkwy), Galloway St, Bosal St, Milkhouse Ave (Equestrian to
Kimberwicke), Gallatin Green Blvd, Vaquero Pkwy (Equestrian to Kimberwicke), Lolo Way (Caspian to Marias), Lemhi Trail Dr
(Caspian to Marias), Marias Ln, Caspian Ave (Lemhi Trail Dr to Monida), Monida, Tschache Ln (Caspian to N 27th), Spring View
Ct, Autumn Grove St, Westwind Way, Winter Park St, Windward Ave, Breeze Ln, Hunters Way (Oak to Tschache), Santana Ct,
Buckrake Ave (Oak to Sartain St), Sartain St, Gale Ct, Tempest Ct, Brisk Ct, Leeward Ct, Breeze Ln, Turbulence Ln, Hedgerow
Ct, Trade Wind Ln (Santana Ct), N 27th (Oak to Baxter), Thomas Dr.
Describe the criticality (i.e., importance) of this project to the operation: Medium-high.
How is capacity affected by this project: We plan to chip seal 4.4 miles in FY18, 18.7 miles in FY19, 15.6 miles in FY20, 19.3 miles
in FY21, and 13.7 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21
$902,500
FY22
165
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR72-22
DEPARTMENT
ENGINEERING
PROJECT NAME
Street Maintenance Chip Seal FY22
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Chip Seal the streets in the Legends at Bridger Creek subdivision, Valley West subdivision, Flanders Creek subdivision, and the
Traditions subdivision – phase 1.
Describe the criticality (i.e., importance) of this project to the operation: Medium-high.
How is capacity affected by this project: We plan to chip seal 4.4 miles in FY18, 18.7 miles in FY19, 15.6 miles in FY20, 19.3 miles
in FY21, and 13.7 miles in FY22.
What safety or risk measures are mitigated with this project: Pavement preservation
How is this project leveraged with other stakeholders/projects/funds: Potential for bike lane striping enhancements with some
projects.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Increases the lifespan of streets within the City of Bozeman
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This project results in a net decrease in overall maintenance costs over the lifecycle of all pavements.
FUNDING SOURCES
Street Maintenance Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
$727,460
166
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR73
DEPARTMENT
STREETS OP
PROJECT NAME
Replace Skid Steer
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
This to replace our 2003 Skid Steer with 1750 hours. Used mainly in paving operations with the cold planer attached. This is very
important in our operation but is also very hard on the equipment. In the last 5 years we have spent over $26,000 in repairs.
Down time during these repairs has been weeks and that interferes with our ability to finish asphalt repairs in a timely manner.
Describe the criticality (i.e., importance) of this project to the operation: This is used on every paving project.
Which infrastructure assets are maintained by this equipment: Streets and Alleys.
How is efficiency improved with this equipment: Streets uses the skid steer in all aspects of milling, paving and gravel work.
When we don't have the skid steer up and running we are using larger equipment using more fuel. Working in tight spaces is
more difficult with a full size loader.
What is the impact (i.e., scope-of-use) for this equipment: All aspects of the Streets operation.
Are there other affected projects: Mill and overlays.
ALTERNATIVES CONSIDERED
Keep running the one we have.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: More down time and less use when it is needed. Less downtime
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21
$80,000
FY22
167
CIP Project Fund
Street Maintenance District
PROJECT NUMBER
STR74
DEPARTMENT
STREETS OP
PROJECT NAME
Paint Truck
FY18 FY19 Unscheduled
$225,000
DESCRIPTION OF PROJECT
Pavement marking renewal is a yearly operation because we use environmentally friendly water borne paint. The disadvantage to
latex paint is that it has to be renewed at least annually. Currently we have MDT paint for us and due to their busy schedule it is
not always done as early in the season as we would like. We are now waiting until mid to late summer to get the double yellow
center lines, bike lane lines, skip lines and fog lines painted. MDT's crew is not as dialed in to the needs and wants of our citizens
so we are not getting the quality that we and our city is used to.
Describe the criticality (i.e., importance) of this project to the operation: Very important to not have to depend on another
agency to get our painting done. Fresh pavement markings are critical to the traveling public.
Which infrastructure assets are maintained by this equipment: Streets.
How is efficiency improved with this equipment: Our crews would get it done in a more timely manner with less mistakes.
What is the impact (i.e., scope-of-use) for this equipment: Painting pavement markings.
ALTERNATIVES CONSIDERED
Continue to have MDT paint for us when it is convenient for their schedule and weather permitting. Contract out the painting.
ADVANTAGES OF APPROVAL
What are the implications of deferring the purchase of this equipment: Continue to rely on others to get our painting done. Public outcry when
markings are not visible at night or in inclement weather. Producing a quality product that we don't always get with our current MOU with
MDT. Being able to paint when we want and as often as we want.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
This will need to be stored inside and we will have to make room for that in our current buildings.
FUNDING SOURCES
100% Street Maintenance District Revenue
New
Replacement
Equipment
Project
FY20 FY21 FY22
168