Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2018-2022 .
AGENDA ITEM TYPE: Consent
MEETING DATE: December 12, 2016
RECOMMENDATION: Adopt the Street and Curb Reconstruction Fund Capital
Improvement Plan (CIP) for Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Street and Curb
Reconstruction Fund. This plan outlines the use of Street Maintenance District dollars that are
dedicated to the reconstruction of streets and curbs. The policy for required matches with
Special Improvement Districts (SID’s) is outlined in Commission Resolution No. 4507.
Item of Note:
• Each project is dependent upon the creation of a Special Improvement District to pay for
a share of the project costs.
106
• If preliminary information indicates that property owners along the street are likely to
have sufficient protests to prevent creation of the SID, we recommend moving to the next
project on the list.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: December 2, 2016
Attached: Street and Curb Reconstruction CIP
107
Street and Curb Reconstructions Fund 504Capital Improvement PlanFinancial SummaryCurrent YearFY17 FY18 FY19 FY20 FY21 FY22UnscheduledProjected Beginning Reserve Balance Dedicated to CIP74,209$ (653,637)$ (416,238)$ (602,538)$ (67,099)$ 375,300$ Plus: Street Maintenance Assessments Dedicated 673,773$ 700,993$ 715,013$ 729,313$ 743,899$ 758,777$ Plus: SID for West Olive ‐ SCR03 ‐ 15%236,756$ Plus: SID for South Grand ‐ SCR04 ‐ 75%1,588,781$ Plus: SID for West Lincoln ‐ SCR20 ‐ 75%126,000$ Plus: SID for South Tracy ‐ SCR09 ‐ 50%673,313$ Plus: SID for South Black ‐ SCR08 ‐ 75%401,625$ Plus: SID for North Tracy ‐ SCR10 ‐ 50%241,500$ Plus: SID for North 17th ‐ SCR16 ‐ 75%511,875$ Less: Scheduled CIP Project Costs (1,638,375)$ (2,178,375)$ (1,574,625)$ (595,500)$ (543,000)$ (742,500)$ (13,157,375)$ Projected Year‐End Cash Dedicated to CIP (653,637)$ (416,238)$ (602,538)$ (67,099)$ 375,300$ 903,452$ Assumptions Made for Revenue Estimates: Current YearFY17 FY18 FY19 FY20 FY21 FY22Total Estimated Annual Street Assessment Revenue 4,346,920$ 4,433,858$ 4,522,536$ 4,612,986$ 4,705,246$ 4,799,351$ Estimated Annual Increase ‐ Attributed to Annexations 2% 2% 2% 2% 2%Total Estimated Revenues 4,346,920$ 4,522,536$ 4,612,986$ 4,705,246$ 4,799,351$ 4,895,338$ Current Revenues Dedicated to Street & Curb CIP % 15.5% 15.5% 15.5% 15.5% 15.5% 15.5% Plus: Increase Dedicated to Reconstruction & Curbs 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 15.5% 15.5% 15.5% 15.5% 15.5% 15.5%Total Estimated Revenues Dedicated to CIP 673,773$ 700,993$ 715,013$ 729,313$ 743,899$ 758,777$ ProjectedProjectedCURRENT14,000,00012,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000Street Reconstruction Projects 108
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22Street & Curb Replacement FundSCR01ENGINEERINGANNUAL CURB REPLACEMENT & CONCRETE REPAIR PROGRAM$60,000$60,000$60,000$60,000$60,000SCR03ENGINEERINGW OLIVE (8TH TO TRACY) ‐ DESIGN AND CONSTRUCTION$1,441,125SCR04ENGINEERINGS GRAND (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION$2,118,375SCR05ENGINEERINGN GRAND (MENDENHAL TO PEACH) ‐ DESIGN AND CONSTRUCTION$989,625SCR07ENGINEERINGS 3RD (OLIVE TO CLEVELAND) ‐ DESIGN AND CONSTRUCTION$1,548,750SCR08ENGINEERINGS BLACK (COLLEGE TO S CUL‐DE‐SAC) ‐ DESIGN AND CONSTRUCTION$535,500SCR09ENGINEERINGS TRACY (BABCOCK TO COLLEGE) ‐ DESIGN AND CONSTRUCTION$1,346,625SCR10ENGINEERINGN TRACY (VILLARD TO PEACH) ‐ DESIGN AND CONSTRUCTION$483,000SCR11ENGINEERINGS 4TH AVE (COLLEGE TO BABCOCK) ‐ DESIGN AND CONSTRUCTION$1,295,000SCR12ENGINEERINGW KOCH (8TH TO TRACY) ‐ DESIGN AND CONSTRUCTION$1,438,500SCR13ENGINEERINGS 6TH (BABCOCK TO CLEVELAND) ‐ DESIGN AND CONSTRUCTION$1,758,750SCR14ENGINEERINGS 5TH (OLIVE TO HAYES) ‐ DESIGN AND CONSTRUCTION$2,121,000SCR15ENGINEERINGW HARRISON (TRACY TO 6TH) ‐ DESIGN AND CONSTRUCTION$1,084,125SCR16ENGINEERINGN 17TH (DURSTON TO END) ‐ DESIGN AND CONSTRUCTION$682,500SCR17ENGINEERINGW COLLEGE (8TH TO 11TH) ‐ DESIGN AND CONSTRUCTION$530,250SCR18ENGINEERINGLINDLEY (KOCH TO OLIVE) ‐ DESIGN AND CONSTRUCTION$420,000SCR19ENGINEERINGDAVIS (CHURCH TO PLUM) ‐ DESIGN AND CONSTRUCTION$530,250109
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22SCR20ENGINEERINGW LINCOLN (GRAND TO WILSON) ‐ DESIGN AND CONSTRUCTION$168,000Summary for Street & Curb Replacement Fund (18 items)Totals by year:$543,000 $742,500$2,178,375$13,157,375FY21FY22FY18UnscheduledFY20$595,500$1,574,625FY19110
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR01
DEPARTMENT
ENGINEERING
PROJECT NAME
Annual Curb Replacement & Concrete Repair Program
FY18
$60,000
FY19
$60,000
Unscheduled
DESCRIPTION OF PROJECT
When a pedestrian ramp is installed, many times the adjacent curbs need to be replaced in order to get drainage to not stop at
the new ramp. Smaller curb repairs can be necessary rather than replacing a whole block.
Describe the criticality (i.e., importance) of this project to the operation: Medium
How is capacity affected by this project: Control of stormwater is improved, facilitates better street sweeping
What safety or risk measures are mitigated with this project: Broken curbs can be hazardous to vehicle tires
What regulations or standards are attained with this project: Replacing dilapidated curbs to meet current standards
How is this project leveraged with other stakeholders/projects/funds: Can be combined with ADA ramp replacement work and
inlet replacement work
ALTERNATIVES CONSIDERED
Continue current operations
ADVANTAGES OF APPROVAL
This will allow completion of smaller projects instead of waiting for an entire block to be repaired
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Cost of Materials
FUNDING SOURCES
Street & Curb Replacement Fund
New
Replacement
Equipment
Project
FY20
$60,000
FY21
$60,000
FY22
$60,000
111
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR03
DEPARTMENT
ENGINEERING
PROJECT NAME
W Olive (8th to Tracy) - Design and Construction
FY18 FY19 Unscheduled
$1,441,125
DESCRIPTION OF PROJECT
Reconstruction of West Olive St from 8th to Tracy, including repairs to failed curbs and gutters
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates West Olive to
function as a Major Collector, which would require a 15% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 85%. Local SID - 15%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
112
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR04
DEPARTMENT
ENGINEERING
PROJECT NAME
S Grand (Olive to Hayes) - Design and Construction
FY18
$2,118,375
FY19 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Grand Street from Olive to Hayes, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and other pavement irregularities.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South Grand to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
113
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR05
DEPARTMENT
ENGINEERING
PROJECT NAME
N Grand (Mendenhal to Peach) - Design and Construction
FY18 FY19 Unscheduled
$989,625
DESCRIPTION OF PROJECT
Reconstruction of North Grand from Mendenhal to Peach, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates North Grand will
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
114
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR07
DEPARTMENT
ENGINEERING
PROJECT NAME
S 3rd (Olive to Cleveland) - Design and Construction
FY18 FY19 Unscheduled
$1,548,750
DESCRIPTION OF PROJECT
Reconstruction of South 3rd Ave from Olive to Cleveland, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates S 3rd to function
as a Minor Collector, which would require a 50% contribution from property owners via a Special District Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
115
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR08
DEPARTMENT
ENGINEERING
PROJECT NAME
S Black (College to S Cul-De-Sac) - Design and Construction
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Black from College to the Cul-de-Sac, including repairs to failed curb and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and other pavement irregularities.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South Black to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20
$535,500
FY21 FY22
116
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR09
DEPARTMENT
ENGINEERING
PROJECT NAME
S Tracy (Babcock to College) - Design and Construction
FY18 FY19
$1,346,625
Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of South Tracy Street from Babcock to College, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South Tracy to
function as a Minor Collector, which would require a 50% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
117
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR10
DEPARTMENT
ENGINEERING
PROJECT NAME
N Tracy (Villard to Peach) - Design and Construction
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North Tracy Street from Villard to Peach, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: This project will decrease street maintenance costs,
increase public safety and improve the condition of our public streets.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and other pavement irregularities.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates North Tracy to
function as a Minor Collector, which would require a 50% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY20 FY21
$483,000
FY22
118
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR11
DEPARTMENT
ENGINEERING
PROJECT NAME
S 4th Ave (College to Babcock) - Design and Construction
FY18 FY19 Unscheduled
$1,295,000
DESCRIPTION OF PROJECT
Reconstruction of South 4th Ave from College to Babcock, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South 4th to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
119
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR12
DEPARTMENT
ENGINEERING
PROJECT NAME
W Koch (8th to Tracy) - Design and Construction
FY18 FY19 Unscheduled
$1,438,500
DESCRIPTION OF PROJECT
Reconstruction of West Koch Street from 8th to Tracy, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates West Koch to
function as a Minor Collector, which would require a 50% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
120
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR13
DEPARTMENT
ENGINEERING
PROJECT NAME
S 6th (Babcock to Cleveland) - Design and Construction
FY18 FY19 Unscheduled
$1,758,750
DESCRIPTION OF PROJECT
Reconstruction of South 6th Ave from Babcock to Cleveland, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South 6th to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
121
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR14
DEPARTMENT
ENGINEERING
PROJECT NAME
S 5th (Olive to Hayes) - Design and Construction
FY18 FY19 Unscheduled
$2,121,000
DESCRIPTION OF PROJECT
Reconstruction of South 5th Ave from Olive to Hayes, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates South 5th to
function as a Minor Collector, which would require a 50% contribution from property owners via a Special District Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 50%. Local SID - 50%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
122
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR15
DEPARTMENT
ENGINEERING
PROJECT NAME
W Harrison (Tracy to 6th) - Design and Construction
FY18 FY19 Unscheduled
$1,084,125
DESCRIPTION OF PROJECT
Reconstruction of West Harrison from Tracy to 6th, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates West Harrison to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
123
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR16
DEPARTMENT
ENGINEERING
PROJECT NAME
N 17th (Durston to End) - Design and Construction
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of North 17th Ave from Durston to Waggon Wheel Trailer Park, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates North 17th to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
$682,500
124
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR17
DEPARTMENT
ENGINEERING
PROJECT NAME
W College (8th to 11th) - Design and Construction
FY18 FY19 Unscheduled
$530,250
DESCRIPTION OF PROJECT
Reconstruction of West College from 8th to 11th, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates College to
function as a Major Collector, which would require a 15% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 85%. Local SID - 15%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
125
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR18
DEPARTMENT
ENGINEERING
PROJECT NAME
Lindley (Koch to Olive) - Design and Construction
FY18 FY19 Unscheduled
$420,000
DESCRIPTION OF PROJECT
Reconstruction of Lindley from Koch to Olive, including repairs to failed curbs and gutters
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates Lindley to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
126
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR19
DEPARTMENT
ENGINEERING
PROJECT NAME
Davis (Church to Plum) - Design and Construction
FY18 FY19 Unscheduled
$530,250
DESCRIPTION OF PROJECT
Reconstruction of Davis from Church to Plum, including repairs to failed curbs and gutters
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates Davis to function
as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvement projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New
Replacement
Equipment
Project
FY20 FY21 FY22
127
CIP Project Fund
Street & Curb Replacement Fund
PROJECT NUMBER
SCR20
DEPARTMENT
ENGINEERING
PROJECT NAME
W Lincoln (Grand to Wilson) - Design and Construction
FY18 FY19
$168,000
Unscheduled
DESCRIPTION OF PROJECT
Reconstruction of West Lincoln, from Grand to Wilson, including repairs to failed curbs and gutters.
Describe the criticality (i.e., importance) of this project to the operation: The street is already in a failing condition and continues
to function; however, eventually the street will become deteriorated to a point where it is unfeasible to maintain and keep open
to public use.
What safety or risk measures are mitigated with this project: This project will provide a city standard street section, with ADA
compliant pedestrian ramps, pavement markings, and signage which will improve pedestrian safety. Also, new asphalt and
drainage improvements will eliminate potholes and minimize ice build up.
What regulations or standards are attained with this project: ADA compliance and MS4 permit compliance.
How is this project leveraged with other stakeholders/projects/funds: For planning purposes, project estimates Lincoln to
function as a Local Street, which would require a 75% contribution from property owners via a Special Improvement District
Assessment.
Are there other affected projects: This project will trigger water, sewer, and storm drain improvements projects within the
reconstruction area.
ALTERNATIVES CONSIDERED
None
ADVANTAGES OF APPROVAL
Enhances safety and drainage, preserves pavement
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street and Curb Replacement Fund - 25%. Local SID - 75%.
New