Loading...
HomeMy WebLinkAbout12-12-16 CC Mtg - A3. Payment Agreement with Gilhousen for Graf Street Commission Memorandum REPORT TO: Mayor and City Commission FROM: Rick Hixson, City Engineer SUBJECT: Payment Agreement for Construction of Graf Street From South 15th Avenue to McNab Street AGENDA ITEM TYPE: Action MEETING DATE: December 12, 2016 RECOMMENDATION: Authorize the City Manager to sign the Payment Agreement for Construction of Graf Street From South 15th to McNab Street between Gilhousen Property Trust and the City of Bozeman. BACKGROUND: The Gilhousen Property Trust (GPT) was recently granted approval for a 5 lot minor subdivision at the intersection of South 19th Avenue and the future Graf Street for the purpose of creating a development to be known as The Yellowstone Center (TYC). As part of that development GPT is going to install the section of Graf Street adjacent to their project. City staff recognized this as an opportunity to partner with GPT to complete Graf street all the way from South 19th to McNab Street, much as we did with Town Pump at the intersection of Huffine and Cottonwood. This will be of immense benefit to residents living south of Kagy as well as serving as an indispensible detour route during the future reconstruction of Kagy Boulevard. There will be substantial benefit to the immediately adjacent properties at the time of development by providing an immediately functional road. The coordination of efforts will reduce the overall expense of constructing the road. Staff members developed a funding strategy for this potential project which includes the use of Street Impact Fees for the eligible portions of Graf Street. 516 The Fiscal Year 2017 Approved Budget included SIF077 – Graf Street Extension project (19th Avenue to Ritter) appropriations in the Street Impact Fee fund in the amount of $1,035,000. On October 3, 2016, the Commission approved a budget amendment to increase the appropriations in the Street Impact Fee fund for the project by $1,120,000, to a total of $2,155,000. GPT is responsible for $1,215,000 of the improvements to Graf Street where adjacent to their property boundary and $38,000 of signal improvements at the intersection of Graf Street and South 19th Avenue as summarized in the attachment, “The Yellowstone Center Impact Fee Reimbursement Summary.” UNRESOLVED ISSUES: None. FISCAL EFFECTS: As a result of approving this Payment Agreement, the city will make payments up to $1,728,793.70 to GPT from the Street Impact Fee Fund for the construction of Graf Street as described in the Agreement. The City also intends to adopt a payback district upon completion of the project for future repayment of portions of the Impact Fee money when development occurs adjacent to the improvements. ALTERNATIVES: As suggested by the City Commission. Attachments: 1 Original Agreement Attachment A, Graf Street Bid Summary Yellowstone Center Impact Fee Reimbursement Summary 517 518 519 520 521 Graf Street Extension Bid Schedule Page 1 OF 4 Attachment A ITEM No.ITEM DESCRIPTION Quantity Unit Unit Price Sub Total General 10 Mobilization 1 LS $50,250.00 $50,250.00 11 Insurance (Per City of Bozeman Standards)1 LS $25,000.00 $25,000.00 12 Performance & Payment Bonds (Per City of Bozeman Standards)1 LS $34,000.00 $34,000.00 13 Construction Staking 1 LS $36,250.00 $36,250.00 14 Traffic Control 1 LS $5,500.00 $5,500.00 15 Miscellaneous Work 50,000 EA $1.00 $50,000.00 16 Prepare & Procure SWPPP 1 LS $5,000.00 $5,000.00 17 Erosion Control/BMPs 1 LS $7,500.00 $7,500.00 18 Dewatering 1 LS $8,650.00 $8,650.00 19 Winter shut down - Spring Startup (Including Road Closer signage)1 LS $3,250.00 $3,250.00 General Subtotal $225,400.00 Roadway Improvements 20 Clear and Grub - Dispose off site 253,700 SF $0.06 $15,222.00 21 Sterilant 13,210 SY $0.25 $3,302.50 22 Sawcut Asphalt Concrete 44 LF $5.00 $220.00 23 Dispose Asphalt Concrete 44 SF $5.00 $220.00 24 Sawcut Concrete Curb 4 LF $50.00 $200.00 25 Dispose Concrete Curb 4 LF $50.00 $200.00 26 Excavation and Embankment 970 CY $7.00 $6,790.00 27 Excavation & Stockpile Onsite For Future Placement 4,840 CY $2.75 $13,310.00 28 Embankment Placed from On-site Stockpile 4,840 CY $2.75 $13,310.00 29 Imported Non-structural Embankment 2,000 CY $7.85 $15,700.00 29 Subgrade Replacement - Excavation, Fabric & Pit Run 500 CY $25.00 $12,500.00 30 Tensar TX-190 Geogrid 200 SY $5.15 $1,030.00 31 Woven Geotextile (Mirafi 500X or approved equal)13,200 SY $0.95 $12,540.00 32 6" Minus Uncrushed Pit Run (18" thick)6,925 CY $14.00 $96,950.00 33 1-1/2" Minus Crushed Road Base Course (6" depth)2,310 CY $22.75 $52,552.50 34 Asphalt Concrete (4" thick - 2 lifts)91,050 SF $1.70 $154,785.00 35 Asphalt Concrete (3" thick)4,150 SF $1.60 $6,640.00 36 Curb and Gutter 4,055 LF $14.25 $57,783.75 37 Concrete Sidewalk (10' wide, 6" thick) with Base 20,835 SF $6.00 $125,010.00 38 Concrete Sidewalk (6' wide, 6" thick) with Base 625 SF $6.00 $3,750.00 39 ADA Ramps with Base 2,476 SF $8.25 $20,427.00 40 ADA Cast Iron Detectable Warning Surface - 5' wide 54 EA $225.00 $12,150.00 41 Concrete Valley Gutter - 7" thick 2,411 SF $11.50 $27,726.50 42 Topsoil in Boulevards (6-inch depth)850 CY $25.00 $21,250.00 43 Utility Conduits (3-12" PVC & 1-4" Sch 40 PVC in one trench)634 LF $30.00 $19,020.00 44 4" Lighting Conduit - 30" deep 880 LF $6.50 $5,720.00 45 4" Sch40 Irrigation Sleeve - 12"-18" deep 304 LF $6.50 $1,976.00 46 Median Concrete Curb 862 LF $20.00 $17,240.00 47 8" Reinforced Concrete Drive Apron 2,960 SF $10.00 $29,600.00 48 Mountable Curb 285 LF $20.00 $5,700.00 Graf Street Extension Improvements Bid Summary Sime Construction 522 Graf Street Extension Bid Schedule Page 2 OF 4 Attachment A ITEM No.ITEM DESCRIPTION Quantity Unit Unit Price Sub Total Graf Street Extension Improvements Bid Summary Sime Construction 49 Concrete Median Cap & Base 2,275 SF $6.75 $15,356.25 50 Remove & Dispose of Fence 160 LF $5.00 $800.00 Roadway Improvements Subtotal $768,981.50 Water Main Improvements 60 Structural Trench Backfill (6" minus)1,435 CY $14.00 $20,090.00 61 Type II Bedding (3" minus) & Excavation 480 CY $30.00 $14,400.00 62 Remove and Salvage Blowoff Assembly & Connect to Ext'g 24" Main 1 LS $1,250.00 $1,250.00 63 8" DI pipe class 51 420 LF $44.50 $18,690.00 64 12" DI pipe class 51 1,362 LF $58.25 $79,336.50 65 24" DI pipe class 250 797 LF $90.00 $71,730.00 66 Install Salvaged Blowoff Assembly 1 EA $1,000.00 $1,000.00 67 Blowoff Assembly 10 EA $1,725.00 $17,250.00 68 12" DI Tapped Cap MJ 3 EA $300.00 $900.00 69 8" DI Tapped Cap MJ 8 EA $200.00 $1,600.00 70 8" 11.25° Bend 1 EA $450.00 $450.00 71 8" 22.5° Bend 1 EA $450.00 $450.00 72 12" 11.25° Bend 1 EA $500.00 $500.00 73 24" 11.25° Bend 2 EA $1,650.00 $3,300.00 74 24" 22.5° Bend 1 EA $1,675.00 $1,675.00 75 24"x12" Cross 1 EA $4,250.00 $4,250.00 76 12"x8" Cross 2 EA $975.00 $1,950.00 77 24"x8" Cross 1 EA $1,975.00 $1,975.00 78 24"x12" Reducer 1 EA $1,250.00 $1,250.00 79 12"x8" Tee 2 EA $625.00 $1,250.00 80 12"x6" Hydrant Tee 3 EA $625.00 $1,875.00 81 24"x6" Hydrant Tee 1 EA $1,750.00 $1,750.00 82 36" Diameter Steel Casing & Appurtenances 33 LF $300.00 $9,900.00 83 4'x8' Foam Insulation Boards (2" thk minimum)92 LF $20.00 $1,840.00 84 8' Bury Hydrant Assembly 3 EA $4,450.00 $13,350.00 85 8.5' Bury Hydrant Assembly 1 EA $4,550.00 $4,550.00 86 6" DI Hydrant Lead 62 LF $45.00 $2,790.00 87 12" Gate Valve 4 EA $2,200.00 $8,800.00 88 24" Butterfly Valve 3 EA $7,450.00 $22,350.00 89 Pressure Test, Flushing & BacTs (Each Branch)1 LS $0.00 $0.00 Water Main Subtotal $310,501.50 Sanitary Sewer Improvements 90 Structural Trench Backfill (6" minus)395 CY $14.00 $5,530.00 91 Type II Bedding (3" minus) & Excavation 56 CY $35.00 $1,960.00 92 8" SDR35 PVC 304 LF $30.50 $9,272.00 93 8"SDR 35 PVC Cap 6 EA $125.00 $750.00 94 48" S.S. Manhole (5' barrel section)3 EA $2,650.00 $7,950.00 95 48" Manhole Additional VF 18 VF $300.00 $5,400.00 96 Testing Main & Manholes 1 LS $0.00 $0.00 523 Graf Street Extension Bid Schedule Page 3 OF 4 Attachment A ITEM No.ITEM DESCRIPTION Quantity Unit Unit Price Sub Total Graf Street Extension Improvements Bid Summary Sime Construction 97 TV Inspection 304 LF $1.00 $304.00 Sanitary Sewer Subtotal $31,166.00 Storm Sewer Improvements 100 24" RCP Class IV Culvert 102 LF $65.00 $6,630.00 101 24" FETS 2 EA $650.00 $1,300.00 102 6"-12" Diameter Rip Rap Pad (6'x6' )12 CY $75.00 $900.00 103 18" Diameter PVC Stub (2.5' Long) & Cap 1 EA $500.00 $500.00 104 15" A-2000 PVC SD 201 LF $32.00 $6,432.00 105 18" A-2000 PVC SD 780 LF $36.00 $28,080.00 106 Curb Inlet 7 EA $2,550.00 $17,850.00 107 MH Combo/Curb Inlet 4 EA $2,650.00 $10,600.00 108 Double Curb Inlet 2 EA $2,850.00 $5,700.00 109 48" SD MH 2 EA $2,750.00 $5,500.00 110 18" FETS 3 EA $500.00 $1,500.00 111 22"x36" RCP Class IV Arch Culvert & Cap Ends 222 LF $100.00 $22,200.00 112 22x36" FETS 2 EA $750.00 $1,500.00 113 18"x28" RCP Class IV Arch Culvert 104 LF $80.00 $8,320.00 114 18"x28" RCP FETS 2 EA $775.00 $1,550.00 115 Temporary Retention Pond G1 (4,070 CF)1 LS $2,500.00 $2,500.00 116 Temporary Retention Pond G2 (4,975 CF)1 LS $2,500.00 $2,500.00 117 Temporary Retention Pond G3 (4,400 CF)1 LS $2,500.00 $2,500.00 118 36"x59" Arch Culvert Class IV 312 LF $185.00 $57,720.00 119 36"x59" FETS 6 EA $1,250.00 $7,500.00 120 A.O.P. Gravel - Match Size to Ext'g Stream Bed Gravel Size 10 CY $100.00 $1,000.00 121 Trash Rack (for 36"x59" culvert)3 EA $750.00 $2,250.00 122 Trash Rack (for 22"x36" culvert)1 EA $675.00 $675.00 123 Trash Rack (for 18"x28" culvert)1 EA $575.00 $575.00 124 Trash Rack (for 24" culvert)1 EA $500.00 $500.00 Storm Sewer Subtotal $196,282.00 Signing & Striping Improvements 130 D11-1: Bike Route 18" x 24"4 EA $137.50 $550.00 131 D3-1: Street Name 9" x X"8 EA $104.50 $836.00 132 M6-1: Arrow 12" x 18"4 EA $67.50 $270.00 133 OM4-3: Three Dead End Barricade Signs 18" x 18"10 EA $105.00 $1,050.00 134 R1-2: Yield 24" x 24"8 EA $180.00 $1,440.00 135 R1-5L: Yield Here to Pedestrian 24" x 24"5 EA $180.00 $900.00 136 R6-4: Two Chevrons 24" x 30"4 EA $225.00 $900.00 137 R7-1: No Parking Any Time 12" x 18"9 EA $71.50 $643.50 138 W14-1: Dead End Sign 24" x 24"2 EA $180.00 $360.00 139 W11-2: Pedestrian 24" x 24"8 EA $185.00 $1,480.00 140 W16-7P: Arrow Plaque 12" x 24"8 EA $90.00 $720.00 141 W13-1P: 15 M.P.H. sign 18" x 18"2 EA $105.00 $210.00 142 W2-6: Roubdabout Sign 30" x 30"2 EA $280.00 $560.00 524 Graf Street Extension Bid Schedule Page 4 OF 4 Attachment A ITEM No.ITEM DESCRIPTION Quantity Unit Unit Price Sub Total Graf Street Extension Improvements Bid Summary Sime Construction 143 Surface Mount Delineator - White 8 EA $110.00 $880.00 144 Surface Mount Delineator - Yellow 10 EA $110.00 $1,100.00 145 Sign Post 59 EA $300.00 $17,700.00 146 8" White Inlaid Thermoplastic 990 LF $11.75 $11,632.50 147 24" White Inlaid Thermoplastic 30 LF $32.00 $960.00 147 24" Yellow Epoxy 1,035 LF $8.25 $8,538.75 148 4" White Epoxy 5,810 LF $0.90 $5,229.00 149 4" Double Yellow Epoxy 3,365 LF $1.50 $5,047.50 150 4" Yellow Epoxy 345 LF $0.90 $310.50 151 6" Yellow Epoxy 527 LF $1.35 $711.45 152 6" White Epoxy 540 LF $1.35 $729.00 153 Yellow Epoxy Curb Paint 480 LF $9.75 $4,680.00 154 12" White Inlaid Thermoplastic Turkey Track (gap not incl. in quantities 71 LF $18.50 $1,313.50 155 Pedestrian Crossing: 8'x2' White Inlaid Thermoplastic Bars 512 SF $26.00 $13,312.00 156 Bike Lane Symbol & Directional Arrow Inlaid Thermoplastic 9 EA $325.00 $2,925.00 157 "Sharks Teeth" Yield Bar White Thermoplastic Triangles 102 SF $37.00 $3,774.00 Signing & Striping Subtotal $88,762.70 Street Lighting Improvements 160 Structural Concrete Pole Foundations 4.8 CY $1,250.00 $6,000.00 161 Conduit, 2.0" PVC, Trench 3285 LF $9.00 $29,565.00 162 Conduit, 2.0" PVC, Sleeve 730 LF $9.00 $6,570.00 163 Pull Box, Composite Type 1 30 EA $880.00 $26,400.00 164 Conductor, Copper, #8 AWG 3270 LF $0.95 $3,106.50 165 Conductor, Copper, #10 AWG, Lighting & Ground 2455 LF $0.70 $1,718.50 166 Light Std. 30' Mount (Type 10-A)9 EA $2,725.00 $24,525.00 167 Luminaire, (Type 3S 72w LED)9 EA $500.00 $4,500.00 168 Single Type C - Power Supply 1 EA $5,315.00 $5,315.00 Street Lighting Subtotal $107,700.00 Total $1,728,793.70 525 526 527 528 529 530 531