Loading...
HomeMy WebLinkAbout12-12-16 CC Mtg - A2. Yellowstone Theological Institute Preliminary PlatPage 1 of 20 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Preliminary Plat Application Public Hearing Date: City Commission meeting is on December 12, 2016 at 6:00 p.m. Project Description: A preliminary plat application requesting a first minor subdivision of a tract of record consisting of 78 acres to create five lots. Project Location: The property is addressed as 3000 South 19th Avenue and is legally described as the SW ¼ NE ¼, NW ¼ SW ¼ less right of way Mandeville Creek Annexation, Section 24, T2S, R5E, P.M.M., City of Bozeman, Gallatin County, Montana. The property is zoned R-1, residential single household low density and R-2, residential two- household medium density district. Recommendation: Approval with conditions. Recommended Motion: “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for Application 15574 and move to approve the preliminary plat application requesting a second or subsequent minor subdivision of a tract of record, 78 acres to create five lots with conditions and subject to all applicable code provisions.” Report Date: November 30, 2016 Staff Contact: Brian Krueger, Development Review Manager Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues There are no known unresolved issues at this time. Project Summary A Preliminary Plat Application requesting a first minor subdivision of a tract of record of 78 acres to create five lots. Three lots are proposed for further development to accommodate the Yellowstone Theological Institute campus. Two lots are proposed for restricted development. This subdivision is a first minor subdivision from a tract of record and does not require Planning Board review. A public meeting is required before a Commission decision. At its October 19, 2016 meeting, the Development Review Committee (DRC) voted unanimously to recommend approval of the application with the conditions and code provisions identified in this report. 391 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 2 of 20 No parkland dedication is required for this subdivision. No subdivision or zoning variances are requested with this application. No public comment has been received. The final decision for a First Minor Subdivision Preliminary Plat must be made within 35 working days of the date it was deemed adequate; or in this case by December 12, 2016. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 1 - MAP SERIES .......................................................................................................... 3 SECTION 2 - REQUESTED VARIANCES OR DEVIATIONS .................................................. 6 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ............................................ 6 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ........................ 8 SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS ............................................ 11 SECTION 6 - STAFF ANALYSIS AND FINDINGS ................................................................. 11 Applicable Subdivision Review Criteria, Section 38.03.040, BMC................................. 11 Primary Subdivision Review Criteria, Section 76-3-608 Mont. Code Ann. .................... 13 Preliminary Plat Supplements ........................................................................................... 13 APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY ..................................... 19 APPENDIX B - NOTICING AND PUBLIC COMMENT .......................................................... 19 APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF .................................. 20 FISCAL EFFECTS ....................................................................................................................... 20 ATTACHMENTS ......................................................................................................................... 20 392 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 3 of 20 SECTION 1 - MAP SERIES Figure 1: Zoning Map 393 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 4 of 20 Figure 2: Future Land Use Designation Map 394 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 5 of 20 Figure 3: Proposed Preliminary Plat 395 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 6 of 20 SECTION 2 - REQUESTED VARIANCES OR DEVIATIONS No subdivision or zoning variances are requested with this preliminary plat application. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to this project. Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. The plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM, 24.183.1107 ARM) and must be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application must include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies; one (1) PDF copy; and five (5) paper prints. The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized mylar sheet in the plat set. 3. All notes, restrictions and conditions of approval must be relocated from the plat and transferred to the final plat conditions of approval sheet. 4. Lot 2, Block 1 must be labeled as a Lot 2, Common open space. 5. Lot 4, Block 1 and Lot 1, Block 2 must be platted as an undevelopable lot in accordance with Section 38.39.080.B.6 BMC, with the following language placed on each undevelopable lot of the final plat “Lot development subject to further subdivision review.” No public improvements shall be required for the undevelopable lot until it is subdivided as a lot which is not subject to this restriction. This language shall be placed on the face of the plat or in a separate executed document to be recorded with the final plat: “NOTICE IS HEREBY GIVEN to all potential purchasers of Lot 4, Block 1 and Lot 1, Block 2, of the Yellowstone Theological Institute Minor Subdivision, City of Bozeman, Gallatin County, Montana, that the final plat of the subdivision was approved by the Bozeman City Commission without completion of on and off site improvements required under the Bozeman Municipal Code, as is allowed in Chapter 38.39 of the Bozeman Municipal Code. As such, this Restriction is filed with the final plat that stipulates that any use of these lot is subject to further subdivision, and no development of this lot shall occur until all on and off site improvements are completed as required under the Bozeman Municipal Code. THRERFORE, BE ADVISED, that Building Permits will not be issued for Lot 4, Block 1 and Lot 1, Block 2, of the Yellowstone Theological Institute Minor Subdivision, City of Bozeman, Gallatin County, Montana 396 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 7 of 20 until all required on and off site improvements are completed and accepted by the City of Bozeman. No building or structures are permitted to be constructed on this lot until this restriction is lifted. This restriction runs with the land and is revocable only by further subdivision and the written consent of the City of Bozeman. 6. The following landscape improvements must be installed with Phase I: a. South 19th Avenue street frontage and the watercourse setback planting plan landscape requirements; b. Common Open Space, Lot 2, Block 1 including the detention facility; c. North/south trail corridor; and d. Graf Street, street frontage. 7. The final plat must provide all necessary utility easements and must be described, dimensioned and shown on the final plat in their true and correct location. Any rear or side yard utility easements not provided will require written confirmation from utility companies providing service indicating that rear or side yard easements are not needed. 8. A ten foot front yard utility easement must be provided on the east side of the sidewalk installed along the South 19th Avenue frontage in lieu of the standard easement location. 9. The final plat application must contain the following notation on the conditions of approval sheet in the final plat: “No parkland dedicated with this subdivision. Development on land initially exempted from park dedication is required to provide park dedication if further development of the site does not continue to meet the criteria for exemption.” 10. Unless already filed and prior to final plat approval, an executed waiver of right to protest the creation of special improvement districts (SIDs) for a park maintenance district must be filed and recorded with the Gallatin County Clerk and Recorder. 11. The applicant must submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed, and must include a digital copy (pdf) of the entire Final Plat submittal. This narrative must be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 12. The proposed project falls within the Payback Districts known as the Meadow Creek Paybacks, which requires reimbursement to the Meadow Creek Subdivision developer for the following infrastructure improvements: a. Intersection of Stucky Road and N. 19th Avenue = $62,845.41 b. Intersection of Graf Street and N. 19th Avenue = $136,659.23 c. Water Improvements, 24-inch pipe = $84,999.49 d. Water Improvements, 16-inch pipe = $56,455.01 e. Sanitary Sewer Improvements = $116,628.57 The applicant must pay the Meadow Creek Paybacks to the City Engineering Department prior to final plat approval. 397 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 8 of 20 13. The applicant must add a note to the Conditions sheet of the plat to the effect that maintenance of stormwater infrastructure is the responsibility of the property owners’ association. 14. The applicant must add a note to the Conditions sheet of the plat to the effect that maintenance of private streets within the development is the responsibility of the property owners’ association. 15. If not already filed, the applicant shall provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: a. Street improvements to Graf Street including paving, curb/gutter, sidewalk, and storm drainage b. Street improvements to S. 19th Avenue including paving, curb/gutter, sidewalk, and storm drainage c. Street improvements to S. 15th Avenue including paving, curb/gutter, sidewalk, and storm drainage d. Street improvements to Arnold Street including paving, curb/gutter, sidewalk, and storm drainage e. Intersection improvements to S. 19th Avenue and Graf Street f. Intersection improvements to Graf Street and S. 11th Avenue g. Intersection improvements to S. 19th Avenue and Stucky Road h. Intersection improvements to S. 19th Avenue and Kagy Boulevard The document filed shall specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. This is a condition of final plat approval. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS 1. Section 38.23.100.A.2.f water course setback planting plan requirements. Landscape plan does not meet the requirements as required for zone 1 and zone 2 of the watercourse setback. 2. Section 38.26.050.E Street frontage landscaping required. The street frontage landscaping proposed along the street frontages do not meet the standard for regular spacing along the street frontages at 1 per 50’. The trees are shown clustered on the submitted landscape plan. 3. Section 38.23.040 Blocks Rights-of-way for pedestrians. Rights-of-way for pedestrian walks, not less than ten feet wide, shall be required where deemed necessary to provide circulation or access to parks, open space, schools, playgrounds, shopping centers, transportation, and other community facilities. In addition, no continuous length of block shall exceed 600 feet without intersecting a street or pedestrian walk. Pedestrian walks shall also be installed at the end of culs-de-sac where deemed appropriate. 398 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 9 of 20 1. Yards adjacent to pedestrian rights-of-way less than 30 feet wide shall be treated as corner side yards. Yards adjacent to pedestrian rights-of-way 30 feet wide or greater shall be treated as side yards; 2. The pedestrian walks shall be maintained by the adjacent property owner or by the property owners association. The party responsible for maintenance of pedestrian walks shall be identified in the preliminary plat application; and 3. Pedestrian walks shall be constructed as a city standard sidewalk, and the provisions of section 38.24.080 shall apply. The proposed public trail easement must be further described on the conditions of approval sheet and noted clearly that this easement is specifically for public access. Staff recommends that the applicant consider the dedication include a 30’ wide easement in order to allow a five foot side yard to apply adjacent to the easement. A construction detail of the sidewalk must be provided with the final plat application. The requirement in Section 38.24.080 is for a concrete City standard 5’ minimum sidewalk. 4. Section 38.23.080.H Grading and Drainage. The final landscape plan for the drainage facility on Lot 2 must include a cross section. 5. Section 38.26.070 Landscaping of public lands. The right of way for pedestrians noted in 38.23.040, Blocks, must be landscaped as a public land. The final plan application must include a landscape plan for the entirety of the trail corridor. 6. Section 38.23.180 states: the transfer of water rights or the payment of cash-in-lieu (CIL) of water rights shall be provided. The applicant must contact the City Engineering Division for an analysis of CIL of water rights and pay any CIL of water rights due prior to final plat approval. 7. 38.24.010.A states: All streets shall be provided in accordance with the adopted growth policy and/or transportation plan. The arrangement, type, extent, width, grade and location of all streets shall be considered in their relation to existing and planned streets, to topographical conditions, to public convenience and safety, and to the proposed uses of the land to be served by such streets. Construction of streets adjacent to the proposed project borders is required. This includes extension of S. 15th Avenue along the eastern border of the property and construction of Arnold Street on the northern border of the property. However, timing of these improvements will be triggered by adjacent development. With the proposed plat application and initial site plan application for this project, S. 15th Avenue and Arnold Street will not be required. The City and the applicant have agreed to delay these local street improvements until such time as the improvements are needed and in conjunction with completion of Graf Street from 19th Avenue to Ritter Drive with the current plat application. The applicant must execute and file a waiver of right to protest creation of a special improvement district for S. 15th Avenue and Arnold Street to ensure that the City can obtain financial participation in these street improvements when required. The applicant must execute the waiver on the City’s standard form and provide the filed copy to the City Engineering Division prior to final plat approval. 399 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 10 of 20 Graf Street and S. 19th Avenue and all associated improvements must be completed by the applicant and accepted by the City or financially guaranteed as allowed by BMC prior to final plat approval. 8. Section 38.23.060.A states: Where determined to be necessary, public and/or private easements shall be provided for private and public utilities, drainage, vehicular or pedestrian access, etc. The applicant must execute and file with the County Clerk and Recorder a public access easement for the sidewalk that parallels S. 19th Avenue. The easement must be executed on the City’s standard form and provided to the City Engineering Division prior to final plat approval. The applicant must execute and file with the County Clerk and Recorder temporary stormwater easements for the temporary stormwater ponds that will accommodate runoff from Graf Street and S. 19th Avenue. The temporary stormwater ponds and associated easements must remain in place until permanent stormwater detention is provided on the subject property. 9. Section 38.23.060.D states: The developer shall establish appropriate irrigation facility easements that: a. Are in locations of appropriate topographic characteristics and sufficient width to allow the physical placement and unobstructed maintenance of active open ditches or below ground pipelines. The easement shall facilitate the delivery of water for irrigation to persons and lands legally entitled to the water under an appropriated water right or permit of an irrigation district or other private or public entity formed to provide for the use of the water right; (1) The easements shall ensure the conveyance of irrigation water through the land to be developed to lands adjacent to or beyond the development's boundaries in quantities and in a manner that are consistent with historic and legal rights; and (2) A minimum easement width of ten feet is required on each side of irrigation canals and ditches. b. Are a sufficient distance from the centerline of the irrigation facility to allow for construction, repair, maintenance and inspection of the ditch or pipeline; and c. Prohibit the placement of structures or the planting of vegetation other than grass within the irrigation facility easement without the written permission of the facility owner. The applicant must sufficiently indicate easements for on-site agricultural water user facilities on the plat prior to final plat approval. The conditions of approval sheet must show the location of the irrigation facilities on the exhibit as described in note 5. 400 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 11 of 20 10. Section 38.41.060.11.b states: The plan shall include sufficient site grading and elevation information (particularly for the basin sites, drainageways and lot finished grades), typical stormwater retention/detention basin and discharge structure details, basin sizing calculations, and a stormwater maintenance plan. The applicant must provide a stormwater maintenance plan for the temporary detention ponds on site for review and approval prior to final plat approval. The owner or future property owner’s association (POA) is responsible for maintenance of the temporary stormwater detention systems until the systems are replaced with a permanent stormwater system. SECTION 5 - RECOMMENDATION AND FUTURE ACTIONS Project Name: Yellowstone Theological Institute Minor Subdivision Preliminary Plat, 15574 The Development Review Committee (DRC) reviewed the proposed minor subdivision preliminary plat application on December 30, 2015; January 6, 2016; and October 12, 2016. On January 6, 2015, the DRC determined the application submittal inadequate for further review. A revised application was determined to contain the detailed, supporting information that is sufficient to allow for the review of the proposed subdivision on October 19, 2016. The DRC finds that the application, with the recommended conditions of approval, is in compliance with the adopted growth policy, the Montana Subdivision and Platting Act and the Unified Development Code. This subdivision is a first minor subdivision from a tract of record and does not require Planning Board review. A public meeting is required before a Commission decision. The City Commission will review the application and the minor subdivision preliminary plat on December 12, 2016. The meeting will be held at 121 N. Rouse Avenue, Bozeman and will begin at 6:00 p.m. Having considered the criteria established for a minor subdivision, Staff recommends conditional approval as submitted. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.03.040, BMC In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 401 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 12 of 20 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As noted in recommended Condition of Approval No. 2, the final plat must comply with State statute, Administrative Rules of Montana, and the Bozeman Municipal Code. 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act The final plat must comply with the standards identified and referenced in the Unified Development Code (UDC). The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. Therefore, the subdivision will be in compliance with the subdivision regulations. 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act The public meeting before the City Commission has been properly noticed as required by the Bozeman Municipal Code. Based on the recommendation of the Development Review Committee (DRC) and other applicable review agencies, as well as any public testimony received on the matter, the City Commission will make the final decision on the applicant’s request. A preliminary plat application was submitted to the Department of Community Development on December 14, 2015 and was deemed acceptable for initial review on December 21, 2015. The preliminary plat was reviewed by the DRC on December 30, 2015; January 6, 2016. On January 6, 2015, the DRC determined the application submittal inadequate for further review. A revised application was submitted on September 16, 2016. On October 12, 2016 the DRC determined the submittal contained detailed, supporting information that is sufficient and adequate to allow for the review of the proposed subdivision. Public notice for this application was scheduled in the legal advertisements section of the Bozeman Daily Chronicle on November 6, 2016 and the site was posted with a public notice on November 7, 2016. Public notice was sent to physically adjacent property owners via certified mail, and to all other property owners of record within 200 feet of the subject property via first class mail, on November 4, 2016. No public comment has been received as of the writing of this report. On December 1, 2016 this first minor subdivision preliminary plat application staff report was drafted and forwarded with a recommendation of conditional approval by the Director of Community Development for consideration by the City Commission which is scheduled to make a final decision at its December 12, 2016 public hearing. The final decision for a First Minor 402 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 13 of 20 Subdivision Preliminary Plat must be made within 35 working days of the date it was deemed adequate; or in this case by December 12, 2016. 4) Compliance with Chapter 38, BMC and other relevant regulations Community Development, the Development Review Committee, Recreation and Parks Advisory Board and the Wetland Review Board reviewed the preliminary plat against all applicable regulations and compliance with all regulations appears to be met. Recommended conditions of approval and code provisions requiring plat corrections are included to complete the application processing for final plat approval. Site specific conditions and plat corrections are included in this report for consideration by the City Commission. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities As detailed above under Criteria 2, required by Section 38.23.060.A and recommended as Condition of Approval No. 7, all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. All necessary utilities and required utility easements will be provided and depicted accordingly on the final plat. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel All of the proposed lots have frontage to public streets constructed to City standards with lot frontage that meets minimum standards as shown on the preliminary plat. The access is noted on the plat. Primary Subdivision Review Criteria, Section 76-3-608 Mont. Code Ann. Primary subdivision review criteria are not required for first minor subdivisions from a tract of record therefore, are not included in this report. Preliminary Plat Supplements A subdivision pre-application plan review was completed by the DRC on August 12, 2015. With the pre-application plan review application, waivers were requested by the applicant from Section 38.41.060 , Additional Subdivision Preliminary Plat Supplements. The following supplement waivers were granted: geology, slopes, and soils, vegetation, wildlife, historical features, educational facilities, parks and recreation facilities, neighborhood center, miscellaneous, and affordable housing. Staff offers the following summary comments on the supplemental information required with Article 38.41, BMC. 38.41.060.A.1 Surface Water No significant impacts are identified. The only impacts to surface water are from the crossing of the surface features by Graf Street. Review and mitigation are provided via a 404 permit issued the Army Corps of Engineers. There are three surface water features on site, Mandeville Creek, 403 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 14 of 20 the Woward-Esgar Ditch and an un-named Irrigation Ditch. Mandeville Cree parallels the western property boundary and is a stream that was relocated historically to parallel South 19th Avenue. Much of the Mandeville Creek flow is diverted east to an irrigation ditch that parallels the north property boundary. Adjacent wetlands exist along Mandeville Creek and will be retained. The Woward-Esgar Ditch parallels the east boundary of the parcel from south to north. The channel is dry and the historic water sources were removed during the construction of an adjacent subdivision. The only impacts to these features will be to place culverts for the crossing and construction of Graf Street. Army Corps. Of Engineers 404 permitting has been obtained for those impacts. The watercourse setback areas of Mandeville Creek will be planted according to code standards. A code correction is identified relating to this issue in Section 4. The Wetland Review Board reviewed the subdivision on January 7, 2015 and supported the proposed wetland buffers and watercourse setback along Mandeville Creek. They reviewed the proposed stormwater facility layout and the proposal for a sidewalk along South 19th Avenue. The Board recommended approval. The Woward-Esgar Ditch and the unnamed ditch along the north property boundary will be reviewed in greater detail with the further subdivision of the restricted development lots. 38.41.060.A.2 Floodplains No significant impacts are identified. A floodplain study was provided for Mandeville Creek and identified no impacts from this subdivision. 38.41.060.A.3 Groundwater No significant impacts are identified. Monitoring of ground water was completed and found that groundwater depths vary from three to five feet. The site is affected within six feet of the ground surface. Groundwater and soils will be further analyzed with further development to determined appropriate foundations for construction. Connections to City sewer and water infrastructure will minimize the potential for groundwater degradation. City stormwater requirements for Graf Street and the lots platted for development will reduce sediments and contaminants in the runoff prior to reintroduction into the groundwater. Stormwater flow discharge will be limited to the predevelopment rate. 38.41.060.A.4 Geology, Soils and Slopes No significant impacts are identified. Supplemental information waived by the DRC. There are no known geologic hazards associated with the site. The site topography slopes at a slight grade in a northern direction. Proposed road and lot grades will not exceed 3-percent and slope work will not exceed a 4:1 horizontal: vertical ratio. The soils will be verified at further development review for any development. 38.41.060.A.5 Vegetation No significant impacts are identified. Supplemental information waived by the DRC. No significant or critical vegetation exists on the subject property. Noxious weeds are being controlled by the required Noxious Weed Management Plan. Mandeville Creek is vegetated and 404 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 15 of 20 will not be significantly impacted by the subdivision. Additional watercourse setback plantings will augment the existing vegetation to shade and slow water in the creek along the west boundary of the subdivision. 38.41.060.A.6 Wildlife No significant impacts are identified. Supplemental information waived by the DRC. This is a developing urban area. The subject property is designated as a residential area according to the City of Bozeman Community Plan. The area is zoned for residential development has been used for agricultural purposes. Although there are incidental small animals residing on this and adjacent property no significant impacts to wildlife is identified in this developing area. 38.41.060.A.7 Historical Features No significant impacts are identified. Supplemental information waived by the DRC. No historical features are anticipated on site. The property has been substantially disturbed and graded over time which would remove historical features. Mandeville Creek was relocated in the past eliminating any archeological sites that might have been associated with it. Agricultural buildings on site were reviewed and approved via a certificate of appropriateness and demolition permit for removal prior to subdivision application. 38.41.060.A.8 Agriculture No significant impacts are identified. The site is currently used for agricultural uses. Fence lines exist to separate this parcel from adjacent agricultural uses. This area is a planned residential development area of the City that is not planned for agricultural uses. 38.41.060.A.9 Agricultural Water User Facilities No significant impacts are identified. Agricultural water user facilities exist on the property. This plat will dedicate land for future streets including South 15th Avenue and Arnold Street. These dedications will provide access to the existing ditches. An existing twenty foot wide easement to access agricultural water user facilities exists on the entire south boundary of the adjacent property to the north. Mandeville Creek can be accessed from South 19th Avenue. No changes to the configurations or to the flows are proposed with this subdivision. 38.41.060.A.10 Water and Sewer No significant impacts are identified. Adequate service capacity exists to serve the development. New water and sewer infrastructure will be installed to serve the development. The water main extended in Graf Street will connect to existing city water main at the Graf Street/South 19th Avenue intersection. Sewer service is being extended from the existing main on Stucky Road south into Graf Street. Per a code requirement, prior to final plat approval, the transfer of water rights or the payment of cash-in-lieu (CIL) of water rights must be provided in accordance to Bozeman Municipal Code (BMC) section 38.23.180. Follow up infrastructure design and permitting is required and listed under the code provisions in Section 4. This site is located in a payback district for water and sewer improvements installed by the Meadow Creek Subdivision. Condition of Approval No. 12 would require those payments to be made by the property owner prior to final plan. 405 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 16 of 20 38.41.060.A.11 Stormwater Management No significant impacts to the stormwater system are identified. A stormwater management plan was included and reviewed with this application. Storm water for the public streets will be located on common open space, Lot 2, Block 1 in the northwest corner of the subdivision which is to be owned and maintained by the property owners’ association. Storm water collection will be via a surface gutter flow and piped collection system. Combined on site detention is proposed for the street and subsequent development. All storm water facility outlet structures will be properly landscaped and maintained according to city standards. Code corrections related to these items are included in Section 4. 38.41.060.A.12 Streets, Roads and Alleys Impacts are identified. Conditions of approval and code requirements mitigate the impacts identified. The project requires all perimeter street adjacent to platted lots to be developed to City standard. Access to the subdivision is provided by an extension of Graf Street east from the intersection of South 19th Avenue. Graf Street is classified as a collector street and South 19th Avenue is a principal arterial. South 19th Avenue requires widening to City arterial standard from the intersection of Graf Street to the north property boundary. The access to the lots is proposed from Graf Street only. A roundabout is proposed at the primary access location along Graf Street. Graf Street is proposed at a collector standard with two lanes of travel, a center turn lane and bike lanes. A shared use pathway is proposed along the north side of Graf Street. A traffic study submitted with the application and determined that the development will have minimal impacts to traffic operations on South 19th Avenue and Stucky Road. Graf Street is anticipated to be extended beyond the boundary of this subdivision east to the existing Graf Street section near South 3rd Avenue. This will provide the first continuous east/west connection between South 3rd Avenue and South 19th Avenue south of Kagy Boulevard and north of Goldenstein Lane. A signal exists at the South 19th Avenue and Graf Street and will be improved with this project to accept westbound traffic. Code corrections are provided related to this issue. Follow up infrastructure design and permitting is required and listed under the code provisions in Section 4. Lot 4, Block 1 and Lot 1, Block 2 are proposed as restricted development lots, which require further subdivision review as they will not install all the required infrastructure to support the development of the lots. The application proposes to dedicate rights of ways for Arnold Street and South 15th Avenue with this plat. During development review the application agreed to file waivers of protest for an SID for these and other streets in the event that adjacent development proceeds prior to the further subdivision of the two lots. The applicant understands that an SID may be used by the City to install Arnold Street and South 15th Avenue improvements. Code provision No. 7 and Condition of Approval No. 15 are related to this issue. This site is located in a payback district for intersection improvements installed by the Meadow Creek Subdivision. Condition of Approval No. 12 would require those payments to be made by the property owner prior to final plan. 406 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 17 of 20 38.41.060.A.13 Utilities No significant impacts are identified. Electric and gas capacity exists to serve the subdivision, confirmed by a letter submitted by NorthWestern Energy. Electrical, gas and communications lines are installed within the South 19th Avenue right of way. A 10’-0” wide utility easement is proposed along all street frontages. As required with Condition of Approval No. 7, all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. n order to reduce conflicts between the utilities and the Mandeville Creek watercourse, staff recommends Condition of Approval No. 8 to require that the ten foot front yard utility easement along South 19th Avenue be located on the east side of the existing sidewalk along the corridor. All necessary utilities and required utility easements will be provided and depicted accordingly on the final plat. 38.41.060.A.14 Educational Facilities No significant impacts are identified. Supplemental information waived by the DRC. No residential development is proposed. 38.41.060.A.15 Land Use No significant impacts are identified. The proposed five lot subdivision is withinR-1, residential single household and R-2, residential two household zoning districts and is designated as residential in the Bozeman Community Plan. The anticipated use of the lots is for the Yellowstone Theological Institute, which is classified as a community center. A concept review has been processed by the Planning Division in anticipation of a master plan, site plan, and conditional use permit for the further development of the campus. 38.41.060.A.16 Parks and Recreation Facilities No significant impacts are identified. Supplemental information waived by the DRC. No residential development is proposed; therefore no parkland dedication is required. Staff recommends Condition of Approval No. 9 to note clearly that no parkland was dedicated with this subdivision. A north/south trail corridor is proposed to meet block length standards. This is proposed as a public access area and is planned to include a ten foot wide concrete shared use pathway. This pathway will connect to the north to the Mandeville Creek city park corridor planned along the watercourse that was approved with the South University District Master Plan. This north/south pedestrian corridor and pathway satisfy the PROST Plan pathway requirement as shown on the parks plan map. A ten foot shared use pathway is proposed consistent with the PROST plan on the north side of Graf Street and will extend continuously from South 19th Avenue to the existing Graf Street location near South 3rd Avenue. This shared use pathway will be located within the right of way and have public access. Condition of Approval No. 10 is recommended which requires the applicant to file a waiver of right to protest an SID for a parks maintenance district. The Subdivision Subcommittee of the Parks and Recreation Advisory Board (RPAB) met to review the project twice, first on January 7, 2015 and again in November, 2016. The board recommended approval of the subdivision with recommendation to include a ten foot side shared use pathway along South 19th Avenue. The Engineering Division subsequently approved a six foot sidewalk along South 19th Avenue, which meets the arterial street standard in the City of 407 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 18 of 20 Bozeman Transportation Plan. That sidewalk along with the widening of South 19th Avenue has been completed. The north/south trail corridor proposed to meet block length standards will be a continuous 10 foot wide concrete shared use pathway between Arnold Street and Graf Street. This connection will provide a shared use pathway corridor that will connect to the main park planned within the South University District along Mandeville Creek. 38.41.060.A.17 Neighborhood Center Plan Supplemental information waived by the DRC. No residential development is proposed. 38.41.060.A.18 Lighting Plan No significant impacts are identified. A lighting plan was included in the subdivision application. LED street lights are proposed along South 19th Avenue and Graf Street according to Engineering Standards. Follow up infrastructure design and permitting is required and listed under the code provisions in Section 4. 38.41.060.A.19 Miscellaneous No significant impacts are identified. Supplemental information waived by the DRC. The subdivision will not impact access to any public lands and there are no identified hazards in proximity to the subject property. 38.41.060.A.20 Affordable Housing No impacts are identified. Supplemental information waived by the DRC. No residential development is proposed; no affordable housing is proposed. 408 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 19 of 20 APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The subject property is zoned R-1, Residential Single Household and R-2, Residential Two- Household. The intent of the R-1 residential single-household low density district is to provide for primarily single-household residential development and related uses within the city at urban densities, and to provide for such community facilities and services as will serve the area's residents while respecting the residential character and quality of the area. The intent of the R-2 residential two-household medium density district is to provide for one- and two-household residential development at urban densities within the city in areas that present few or no development constraints, and for community facilities to serve such development while respecting the residential quality and nature of the area. Adopted Growth Policy Designation: The property is designated as “Residential” in the Bozeman Community Plan. The Plan indicates that “This category designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential designation indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development.” APPENDIX B - NOTICING AND PUBLIC COMMENT The public meeting before the City Commission has been properly noticed as required by the Bozeman Municipal Code. Based on the recommendation of the Development Review Committee (DRC) and other applicable review agencies, as well as any public testimony received on the matter, the City Commission will make the final decision on the applicant’s request. A preliminary plat application was submitted to the Department of Community Development on December 14, 2015 and was deemed acceptable for initial review on December 21, 2015. The preliminary plat was reviewed by the DRC on December 30, 2015; January 6, 2016. On January 6, 2015, the DRC determined the application submittal inadequate for further review. A revised application was submitted on September 16, 2016. On October 19, 2016 the DRC determined the submittal contained detailed, supporting information that is sufficient and adequate to allow for the review of the proposed subdivision. 409 15574, Staff Report for the Yellowstone Theological Institute Minor Subdivision Page 20 of 20 Public notice for this application was scheduled in the legal advertisements section of the Bozeman Daily Chronicle on November 6, 2016 and the site was posted with a public notice on November 7, 2016. Public notice was sent to physically adjacent property owners via certified mail, and to all other property owners of record within 200 feet of the subject property via first class mail, on November 4, 2016. No public comment has been received as of the writing of this report. On December 1, 2016 this first minor subdivision preliminary plat application staff report was drafted and forwarded with a recommendation of conditional approval by the Director of Community Development for consideration by the City Commission which is scheduled to make a final decision at its December 12, 2016 public hearing. The final decision for a First Minor Subdivision Preliminary Plat must be made within 35 working days of the date it was deemed adequate; or in this case by December 12, 2016. APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF Owner/Applicant: Karen Gilhousen 601 South Pine Butte Road Bozeman, MT 59718 Representative: Madison Engineering, LLC, 895 Technology Blvd, Suite 203, Bozeman, MT 59718 Report By: Brian Krueger, Development Review Manager FISCAL EFFECTS No unusual fiscal effects have been identified. No presently budgeted funds will be changed by this zone map amendment. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application Preliminary Plat Resubmittal Preliminary Plat Supplemental Information Preliminary Plat Street Landscape Plan 410 411 Yellowstone Theological Institute Preliminary Plat Application Table of Contents Section Description 1. Application A. Development Review Application - Form A1 B. Subdivision Preliminary Plat Required Materials - Form PP C. Preliminary Plat Checklist - Form PP1 D. Noticing Materials - Form N1 & Property Adjoiners List E. Wetland Review Checklist & Narrative 2. Certificate of Title 3. Response to Pre-Application Comments 4. Agency Letters & Responses 5. Preliminary Plat Supplemental Information 6. Covenants 7. Plans A. Weed Management Plan B. Landscape Plan 8. Exhibits A. Vicinity Map B. Phasing Plan C. Site Plan 9. Preliminary Plat 10. Appendices A. Waters of the US Delineation Report B. Groundwater C. Water System Design D. Wastewater System Design E. Stormwater Management F. Road Sections G. Traffic Impact Study H. Lighting I. Floodplain Study 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 449 450 451 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 SIOSIOSIO40'-60'30'-40'TREESSYMB.BOTANICAL NAMESIZETYPESPACING#COMMON NAMESTORMWATER POND PLANT SCHEDULEPOPULUS SONGARICASONGARICA POPLAR2.5" CALB & BPER PLAN3POPULUS ACUMINATALANCELEAF POPLAR2.5" CALB & BPER PLAN4MATUREHEIGHT50'-75'MATURESPREAD20'-40'B & BPER PLAN56'-12'6'-8'SALIX GEYERIANA GEYER WILLOWB & BPER PLAN515'8'PRUNUS VIRGINIANA NATIVE CHOKECHERRYSHRUBS5 GALB & BPER PLAN78'-15'6'-10'ALNUS VIRIDIS GREEN ALDER5 GAL5 GALSIOWETLAND SEEDINGELYMUS LANCEOLATUS THICKSPIKE WHEATGRASS 'CRITANA'ELYMUS LANCEOLATUS STREAMBANK WHEATGRASS 'SODAR'FESTUCA IDAHOENSIS IDAHO FESCUEPASCOPYRUM SMITHII WESTERN WHEATGRASS 'ROSANNA'STORMWATER POND PLANT SCHEDULELANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERYSTOCK3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPEARCHITECT. ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE.406-587-4873 OR TROY@DESIGN5LA.COM5.ALL SOD AREAS SHALL HAVE A MINIMUM OF 4" TOPSOIL6.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF PREPARED, AMENDED SOIL TO PROMOTEPLANT GROWTH7.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS AND PRODUCT PLACEMENT.8.ALL TREES SHALL BE STAKED FOR MIN. 2 YEARS. REMOVE STAKES AFTER 2 YEARS.9.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLANARE TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, WITH SEED MIXLISTED BELOW.10.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALL AT TIME OF LANDSCAPEINSTALLATION. IRRIGATION WATER SOURCE TO BE FROM WELLS AND INSTALLED IN ACCORDANCEWITH ALL STATE AND LOCAL CODES AND ORDINANCES.IRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE OF TREEWITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS, OR APPROVED ALTERNATE.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PERINDIVIDUAL PLANT REQUIREMENTS.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS, OR APPROVED ALTERNATE.6.SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION. ALL HEADS MUST ACHIEVEHEAD-TO-HEAD COVERAGE7.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.8.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN APPROVED EXTERNAL GRADEBOX,AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCALCODES AND ORDINANCES, WITH ARCHITECTURE. AND WITH ALL OTHER TRADES.9.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.10.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.11.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.12.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE, AND GPMAVAILABLE. LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIES BETWEEN STATED WATERPRESSURE AND GPM AND ACTUAL.13.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALLTIMES.RECLAMATION SEEDINGAGROPYRON TRACHYCAULUS SLENDER WHEATGRASS 'PRYOR'ELYMUS LANCEOLATUS THICKSPIKE WHEATGRASS 'CRITANA'FESTUCA OVINA SHEEP FESCUE 'COVAR'PASCOPYRUM SMITHII WESTERN WHEATGRASS 'ROSANNA'RECLAMATION SEED MIX***ALL UPLANDDISTURBED AREAS TO BERESEEDED WITH THIS MIX***design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\00_design\yti_stormwater_planting.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana khm TMS StormwaterPondPlantingL10009/07/161L1001"=40'-0"Stormwater Pond Planting Plan4020080490 491 492 493 494 495 496 497 498 499 500 501 GRAF STREETSOUTH 19TH AVENUE.16PRIVATE DRIVEWWWWWWWWWSSSSSSSS ET ET ETEEEEE EEE EEEEEEEEEEEEEEEEEEEEEXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXG GGG GGGGGGGGGTTTTTTT TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW1 inch = 0 SCALE 200 feet 400100200 EXHIBITMADISON ENGINEERING 895 TECHNOLOGY BLVD STE 203, BOZEMAN, MT 59718 PHONE (406) 586-7355 FAX (406) 586-7357 YELLOWSTONE THEOLOGICAL INSTITUTE SITE PLAN BOZEMAN, MT 502 503 504 505 506 ONLY ONLY AMEAMEAMEAMEAMEAMEAMEAMEGRAF STREETPROPOSED STREETLIGHT6' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTER10' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERPROPOSEDSTREETLIGHTVISION TRIANGLETREESSHRUBSACER PLATANOIDES 'HELENA' ***HELENA MAPLE2.5" CALB & BPER PLAN10PHYSOCARPUS OPULIFOLIUS 'SEWARD'SUMMERWINE NINEBARK5 GALPOT4SPIRAEA BETULIFOLIATOR SPIRAEA5 GALPOT1240'-60'4'-6'2'-3'30'4'-6'2'-3'2.5" CALB & B1818'-30'15'-25'ACER TATARICUM TARTARIAN MAPLE(SINGLE STEM)JUNIPERUS SABINA 'BUFFALO'BUFFALO JUNIPER5 GALPOT531'-2'5'-8'SYMB.SIZETYPESPACING#MATUREHEIGHTMATURESPREADPER PLANPER PLANPER PLANPER PLANNOTE: SEE ALSO THE WATERCOURSE SETBACK PLAN SCHEDULE . PLANT QUANTITIES SHOWN THERE ARE IN ADDITION TO THEQUANTITIES LISTED ABOVE.BOTANICAL NAMECOMMON NAMETILIA AMERICANA 'DROPMORE'LINDEN 'DROPMORE'2.5" CALB & BPER PLAN2450'-65'20'-40'PERENNIALS AND ORNAMENTAL GRASSESCALAMAGROSTIS x ACUTIFLORAKARL FOERESTER1 GALPOT502'-3'2'-3'NEPETA RACEMOSAWALKERS LOW CATMINT1 GALPOT202'2'-3'RUDBECKIA 'GOLDSTRUM'GOLDSTRUM BLACKEYED SUSAN1 GALPOT192'2'-3'SALVIA NEMOROSAMAY NIGHT SALVIA1 GALPOT252'2'-3'PEROVSKIA ATRIPLICIFOLIARUSSIAN SAGE2 GALPOT104'-5'3'-4'PER PLANPER PLANPER PLANPER PLANPER PLANNATIVE FESCUE KENTUCKYBLUEGRASS BLEND SODSHREDDED CEDAR MULCH31,665 SQ/FT2,835 SQ/FTSHRUBSGRAF ST PLANTING SCHEDULEAME3" DEPTHSTREET FRONTAGE LANDSCAPINGREQUIRED: ONE LARGE CANOPY TREE FOR EVERY 50 FEET OF STREET FRONTAGE . 1,302' LINEAR FEET OF STREET FRONTAGE, (26 TREES REQUIRED) PROVIDED: 26 LARGE CANOPY TREES PROVIDED ON BOTH SIDES OF GRAF ST.GRAF STREETAMEAMEAMEAMEAME10' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERPROPOSED STREETLIGHTPROPOSEDSTREETLIGHT10' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERPROPOSED STREETLIGHT316" STEEL EDGINGSHREDDED CEDARMULCHONLYONLYONLY 19TH AVENUE L100aL100bL101aL101bL102a L102b L103a L103bLANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTS SHOULD BESUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM5.ALL SOD AND SEED AREAS SHALL HAVE A MINIMUM OF 4" TOPSOIL6.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 12" OF PREPARED, AMENDED SOIL TO PROMOTE PLANT GROWTH7.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TO DISCUSS PROGRESS,QUESTIONS AND PRODUCT PLACEMENT.8.ALL EDGING SHALL BE 316"x4" NATURAL STEEL (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN MIN. 18" DEEP.9.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCH PER PLAN.ROUNDABOUT AREA WITH PERENNIALS SHOULD NOT HAVE WEEDFABRIC AROUND PERENNIALS TO ENCOURAGE PLANT SPREAD.10.ALL TREES SHALL BE STAKED FOR MIN. 2 YEARS. REMOVE STAKES AFTER 2 YEARS.11.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BE RECLAIMED ANDRE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, WITH APPROVAL OF LANDSCAPE ARCHITECT. SEE SHEET L103 FOR RECLAIM SEED MIXSPECIFICATIONS.12.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. IRRIGATION TO BEINSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES. SEE IRRIGATION NOTES.1L100b1"=20'-0"Graf Street - STA. G4+00 - G9+00N2010040Graf St S. &RoundaboutPlantingL100Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l100_yti_roadwaylandscapeplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L100a1"=20'-0"Graf Street - STA. G1+00 - G5+00N2010040MATCHLINE - STA. G5+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. G5+00 - SEE ABOVE ,THIS SHEET MATCHLINE - STA. G9+00, SEE SHEET L101 PROJECT BEGINNING, STA. G1+00 MATCHLINE, 19TH AVE. STA. 20+50, SHEET L102KEY MAP507 AMEAMEAMEAMEAMEAMEAMEGRAF STREETPROPOSED STREETLIGHT6' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTER10' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERPROPOSED STREETLIGHTPROPOSEDSTREETLIGHTAMEAMEAMEAMEGRAF STREET6' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERPROPOSEDSTREETLIGHT10' PUBLIC SIDEWALKPROPERTY LINE / ROWBACK OF CURBCURB AND GUTTERTREESSHRUBSACER PLATANOIDES 'HELENA' ***HELENA MAPLE2.5" CALB & BPER PLAN10PHYSOCARPUS OPULIFOLIUS 'SEWARD'SUMMERWINE NINEBARK5 GALPOT4SPIRAEA BETULIFOLIATOR SPIRAEA5 GALPOT1240'-60'4'-6'2'-3'30'4'-6'2'-3'2.5" CALB & B1818'-30'15'-25'ACER TATARICUM TARTARIAN MAPLE(SINGLE STEM)JUNIPERUS SABINA 'BUFFALO'BUFFALO JUNIPER5 GALPOT531'-2'5'-8'SYMB.SIZETYPESPACING#MATUREHEIGHTMATURESPREADPER PLANPER PLANPER PLANPER PLANNOTE: SEE ALSO THE WATERCOURSE SETBACK PLAN SCHEDULE . PLANT QUANTITIES SHOWN THERE ARE IN ADDITION TO THEQUANTITIES LISTED ABOVE.BOTANICAL NAMECOMMON NAMETILIA AMERICANA 'DROPMORE'LINDEN 'DROPMORE'2.5" CALB & BPER PLAN2450'-65'20'-40'PERENNIALS AND ORNAMENTAL GRASSESCALAMAGROSTIS x ACUTIFLORAKARL FOERESTER1 GALPOT502'-3'2'-3'NEPETA RACEMOSAWALKERS LOW CATMINT1 GALPOT202'2'-3'RUDBECKIA 'GOLDSTRUM'GOLDSTRUM BLACKEYED SUSAN1 GALPOT192'2'-3'SALVIA NEMOROSAMAY NIGHT SALVIA1 GALPOT252'2'-3'PEROVSKIA ATRIPLICIFOLIARUSSIAN SAGE2 GALPOT104'-5'3'-4'PER PLANPER PLANPER PLANPER PLANPER PLANNATIVE FESCUE KENTUCKYBLUEGRASS BLEND SODSHREDDED CEDAR MULCH31,665 SQ/FT2,835 SQ/FTSHRUBSGRAF ST PLANTING SCHEDULEAME3" DEPTHSTREET FRONTAGE LANDSCAPINGREQUIRED: ONE LARGE CANOPY TREE FOR EVERY 50 FEET OF STREET FRONTAGE . 1,302' LINEAR FEET OF STREET FRONTAGE, (26 TREES REQUIRED) PROVIDED: 26 LARGE CANOPY TREES PROVIDED ON BOTH SIDES OF GRAF ST.ONLYONLYONLY 19TH AVENUE L100aL100bL101aL101bL102a L102b L103a L103bLANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTS SHOULD BESUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM5.ALL SOD AND SEED AREAS SHALL HAVE A MINIMUM OF 4" TOPSOIL6.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 12" OF PREPARED, AMENDED SOIL TO PROMOTE PLANT GROWTH7.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TO DISCUSS PROGRESS,QUESTIONS AND PRODUCT PLACEMENT.8.ALL EDGING SHALL BE 316"x4" NATURAL STEEL (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN MIN. 18" DEEP.9.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCH PER PLAN.ROUNDABOUT AREA WITH PERENNIALS SHOULD NOT HAVE WEEDFABRIC AROUND PERENNIALS TO ENCOURAGE PLANT SPREAD.10.ALL TREES SHALL BE STAKED FOR MIN. 2 YEARS. REMOVE STAKES AFTER 2 YEARS.11.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BE RECLAIMED ANDRE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, WITH APPROVAL OF LANDSCAPE ARCHITECT. SEE SHEET L103 FOR RECLAIM SEED MIXSPECIFICATIONS.12.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. IRRIGATION TO BEINSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES. SEE IRRIGATION NOTES.Graf StPlantingL101Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l100_yti_roadwaylandscapeplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L101a1"=20'-0"Graf Street - STA. G9+00 - G12+00N20100401L101b1"=20'-0"Graf Street - STA. G12+00 - G15+00N2010040MATCHLINE - STA. G12+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. G12+00 - SEE ABOVE ,THIS SHEET PROJECT END - STA. G15+00 MATCHLINE, STA. G9+00, SEE SHEET L100 KEY MAP508 ONLY19TH AVENUELANLANLANLANLANLANWESWESWESWESPROPOSED STREETLIGHT30' WETLAND SETBACK50' WETLAND SETBACKEXISTING SIDEWALKLANLANLANLANSIOLANSIO19TH AVENUE30' WETLAND SETBACK50' WETLAND SETBACKEXISTING SIDEWALK45'20'-25'TREESSYMB.SIZETYPESPACING#WATERCOURSE SETBACK PLANT SCHEDULEPOPULUS SONGARICASONGARICA POPLAR2" CALB & BPER PLAN6POPULUS ACUMINATALANCELEAF POPLAR2" CALB & BPER PLAN15MATUREHEIGHT50'-60'MATURESPREAD20'-40'SALIX LUTEAYELLOW WILLOWPOTPER PLAN1010'-25'6'-10'POTPER PLAN186'-12'6'-8'SALIX GEYERIANA GEYER WILLOWB & BPER PLAN1615'8'PRUNUS VIRGINIANA NATIVE CHOKECHERRYSHRUBS5'B&BPER PLAN228'-15'6'-10'ALNUS VIRIDIS GREEN ALDER6'-8'5 GAL5 GALLANSIOBOTANICAL NAMECOMMON NAME5 GALPOTPER PLAN616'-9'6'-10'CORNUS SERICEA RED OSIER DOGWOOD10'-30'8'-15'BETULA NIGRARIVER BIRCH2" CALB & BPER PLAN10WES2" CALB & BPER PLAN116'-10'20'-25'CRATAEGUS DOUGLASII BLACK HAWTHORNRECLAIM SEED MIXELYMUS LANCEOLATUS 30%THICKSPIKE WHEATGRASS 'CRITANA'ELYMUS LANCEOLATUS 'SODAR' 40%STREAMBANK WHEATGRASS 'SODAR'FESTUCA IDAHOENSIS 5%IDAHO FESCUEPASCOPYRUM SMITHII 25%WESTERN WHEATGRASS 'ROSANNA'47,606 SQ/FTSEED RATE= 1,000 LB/SQ.FTWATERCOURSE SETBACK PLANTING1,270' LINEAL FT OF WATERCOURSEREQUIRED: 1 SHRUB FOR EVERY 10 LINEAR FT = 127 SHRUBS1 TREE FOR EVERY 30 LINEAR FT = 42 TREESPROVIDED: 127 SHRUBS AND 42 TREESONLYONLYONLY 19TH AVENUE L100aL100bL101aL101bL102a L102b L103a L103bLANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTS SHOULD BESUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM5.ALL SOD AND SEED AREAS SHALL HAVE A MINIMUM OF 4" TOPSOIL6.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 12" OF PREPARED, AMENDED SOIL TO PROMOTE PLANT GROWTH7.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TO DISCUSS PROGRESS,QUESTIONS AND PRODUCT PLACEMENT.8.ALL EDGING SHALL BE 316"x4" NATURAL STEEL (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN MIN. 18" DEEP.9.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCH PER PLAN.ROUNDABOUT AREA WITH PERENNIALS SHOULD NOT HAVE WEEDFABRIC AROUND PERENNIALS TO ENCOURAGE PLANT SPREAD.10.ALL TREES SHALL BE STAKED FOR MIN. 2 YEARS. REMOVE STAKES AFTER 2 YEARS.11.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BE RECLAIMED ANDRE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, WITH APPROVAL OF LANDSCAPE ARCHITECT. SEE SHEET L103 FOR RECLAIM SEED MIXSPECIFICATIONS.12.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. IRRIGATION TO BEINSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES. SEE IRRIGATION NOTES.19th Ave.WatercoursePlantingL102Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l100_yti_roadwaylandscapeplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L102a1"=20'-0"19th Avenue - STA 20+50 - 17+00N20100401L102b1"=20'-0"19th Avenue - STA 17+00 - 14+50N2010040MATCHLINE - STA. 17+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. 17+00 - SEE ABOVE ,THIS SHEET MATCHLINE - STA. 14+50 - SEE SHEET L103 MATCHLINE, STA. 20+50, SEE SHEET L100 MATCHLINE, GRAF ST.STA. G1+00, SHEET L100509 LANLANLANSIOWESWESWESWESWES19TH AVENUELANLANLANSIOSIOWESSIO19TH AVENUE45'20'-25'TREESSYMB.SIZETYPESPACING#WATERCOURSE SETBACK PLANT SCHEDULEPOPULUS SONGARICASONGARICA POPLAR2" CALB & BPER PLAN6POPULUS ACUMINATALANCELEAF POPLAR2" CALB & BPER PLAN15MATUREHEIGHT50'-60'MATURESPREAD20'-40'SALIX LUTEAYELLOW WILLOWPOTPER PLAN1010'-25'6'-10'POTPER PLAN186'-12'6'-8'SALIX GEYERIANA GEYER WILLOWB & BPER PLAN1615'8'PRUNUS VIRGINIANA NATIVE CHOKECHERRYSHRUBS5'B&BPER PLAN228'-15'6'-10'ALNUS VIRIDIS GREEN ALDER6'-8'5 GAL5 GALLANSIOBOTANICAL NAMECOMMON NAME5 GALPOTPER PLAN616'-9'6'-10'CORNUS SERICEA RED OSIER DOGWOOD10'-30'8'-15'BETULA NIGRARIVER BIRCH2" CALB & BPER PLAN10WES2" CALB & BPER PLAN116'-10'20'-25'CRATAEGUS DOUGLASII BLACK HAWTHORNRECLAIM SEED MIXELYMUS LANCEOLATUS 30%THICKSPIKE WHEATGRASS 'CRITANA'ELYMUS LANCEOLATUS 'SODAR' 40%STREAMBANK WHEATGRASS 'SODAR'FESTUCA IDAHOENSIS 5%IDAHO FESCUEPASCOPYRUM SMITHII 25%WESTERN WHEATGRASS 'ROSANNA'47,606 SQ/FTSEED RATE= 1,000 LB/SQ.FTWATERCOURSE SETBACK PLANTING1,270' LINEAL FT OF WATERCOURSEREQUIRED: 1 SHRUB FOR EVERY 10 LINEAR FT = 127 SHRUBS1 TREE FOR EVERY 30 LINEAR FT = 42 TREESPROVIDED: 127 SHRUBS AND 42 TREESONLYONLYONLY 19TH AVENUE L100aL100bL101aL101bL102a L102b L103a L103bLANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTS SHOULD BESUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM5.ALL SOD AND SEED AREAS SHALL HAVE A MINIMUM OF 4" TOPSOIL6.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 12" OF PREPARED, AMENDED SOIL TO PROMOTE PLANT GROWTH7.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TO DISCUSS PROGRESS,QUESTIONS AND PRODUCT PLACEMENT.8.ALL EDGING SHALL BE 316"x4" NATURAL STEEL (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN MIN. 18" DEEP.9.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCH PER PLAN.ROUNDABOUT AREA WITH PERENNIALS SHOULD NOT HAVE WEEDFABRIC AROUND PERENNIALS TO ENCOURAGE PLANT SPREAD.10.ALL TREES SHALL BE STAKED FOR MIN. 2 YEARS. REMOVE STAKES AFTER 2 YEARS.11.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BE RECLAIMED ANDRE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, WITH APPROVAL OF LANDSCAPE ARCHITECT. SEE SHEET L103 FOR RECLAIM SEED MIXSPECIFICATIONS.12.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. IRRIGATION TO BEINSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES. SEE IRRIGATION NOTES.19th AveWatercoursePlantingL103Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l100_yti_roadwaylandscapeplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L103a1"=20'-0"19th Avenue - STA 14+50 - 11+00N20100401L103b1"=20'-0"19th Avenue - STA 11+00 - 7+50N2010040MATCHLINE - STA. 11+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. 17+00 - SEE ABOVE ,THIS SHEET END OF PROJECT - STA. 7+50 MATCHLINE, STA. 14+50, SEE SHEET L102 510 2L5013/8"=1'Ball and Burlap Deciduous Tree Planting Detail1L5013/8"=1'Coniferous Ball and Burlap Planting6L5013/8"=1'Ball and Burlap Deciduous Tree Planting Detail - On Slope5L5013/8"=1'Coniferous Ball and Burlap Planting - On SlopePRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING.13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.EXCAVATE HOLE AS SHOWN,3X DIAMETER OF ROOT BALLPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,4' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING.13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.EXCAVATE HOLE AS SHOWN,3X DIAMETER OF ROOT BALLEXCAVATE AS SHOWN,3X DIAMETER OF ROOT BALLPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING.13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.AMENDED SOIL,MOUND TOELEVATION OFCROWNEXCAVATE AS SHOWN,3X DIAMETER OF ROOT BALLPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING.13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.ORIGINALGRADEAMENDED SOIL,MOUND TOELEVATION OFCROWNORIGINALGRADE4L5011/2"=1'Perennial Planting DetailX XXYBED EDGING ANDMULCH AS SPECIFIEDTILL NATIVE SOIL TO 12" DEPTH, ADDING ORGANIC SOILAMDENDMENT SO AS TO REACH MIN. 15% ORGANIC CONTENT IN SOIL.X = PLANT SPACING. REFER TO PLANT LEGEND FORSPACINGY = SPACING BETWEEN ROWS. 86% OF XO = PLANT LOCATIONTRIANGULAR SPACING8L5011/2"=1'Ornamental Grass Planting DetailTRIANGULAR SPACING= PLANT LOCATIONX XXYY = SPACING BETWEEN ROWS, 86% OF X.X = PLANT SPACING. REFER TO PLANT LEGEND FOR SPACING REQUIREMENTS.TILL NATIVE SOIL TO 12" DEPTH. ADD ORGANICMATERIAL AS NECESSARY TO ACHIEVE 15% ORGANICCONTENT IN SOIL.BED EDGING AND MULCHAS SPECIFIED3L5013/4"=1'Shrub Planting DetailPRUNE SHRUB TO REMOVEDEAD OR DAMAGED LEAVESAND BRANCHESELEVATION OF SHRUBCROWN TO BE 3" ABOVEFINISHED GRADE ELEVATIONCIRCULAR SWALE TO RING SHRUB,2' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILALL CONTAINMENT MATERIALSAROUND ROOTS TO BE REMOVEDPRIOR TO INSTALLATION13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.EXCAVATE HOLE AS SHOWN,3X DIAMETER OF ROOT BALL7L5011"=1'Steel Edging along Natural and Turf Plantings12"REVEALFINISHED GRADE14" X6" NATURAL STEELEDGINGTAC WELDED TO #4 REBARDRIVEN MIN. 18"UNDISTURBED NATIVESOIL9L5011"=1'Edging Detail14" NATURAL STEEL EDGINGMULCH MATERIAL PER PLANMIN 3" DEEP.FINAL ELEVATION MIN 1" BELOWTOP OF STEEL EDGING1" FACE REVEAL#4 REBAR, 24" OC, MIN. 18" DEPTH SPOT WELD ON SITETO STEEL EDGINGWEED FABRIC PER PLAN4" STAPLES, 18" OCPlantingDetailsL501Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l500_yti_roadwayplantingdetails.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 511 ONLY ONLY AMEAMEAMEAMEAMEAMEAMEAMECCPGRAF STREETBLVD SPRAY ZONEPROPOSED WELLLOCATION ANDIRRIGATIONCONNECTIONAMEAMEAMEAMEAMED D DDDDDDD D D D DDDD D D DDDDD D DDD DGRAF STREETDRIP IRRIGATION ZONE4" PVC IRRIGATIONSLEEVEIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES IN NATIVE SEED ZONES (WATERCOURSE SETBACK) TO BE IRRIGATED THROUGH DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.5.ALL TREES IN BLVD SPRAY ZONES DO NOT NEED DEDICATED BUBBLERS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS. BUBBLERS TO TREES MAY BE OMITTED WHEREOVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PER PLAN.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH ROOM OR APPROVED EXTERNALGRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PERLOCAL CODES AND ORDINANCES, WITH ARCHITECTURE. AND WITH ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE, AND GPM AVAILABLE.LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIES BETWEEN STATED WATER PRESSURE AND GPMAND ACTUAL.16.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.17.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 1.5"/sqft.IRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTY29 in / sqftTOTALANNUALH20860,025 gal47,602sqft1,498,916 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR4.60 acre feetH.E.ROTORIRRIG.(NATIVESEED)0 gal0sqftH.E.ROTARYSPRAYIRRIG.(SOD)586,906 gal32,485sqftH.E. BLVDSPRAYIRRIG.(SOD)1,170 gal /week21,060 gal52TREESH.E. TREEBUBBLER196PLANTSH.E. SHRUBDRIP IRRIG.124PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft1,470 gal /week26,460 gal248 gal /week4,464 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION CONTROLLERCONNECTION POINTNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCCCP1L700b1"=20'-0"Graf Street - STA. G4+00 - G9+00N2010040IrrigationPlanL700Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l700_yti_roadwayirrigationplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L700a1"=20'-0"Graf Street - STA. G1+00 - G5+00N2010040MATCHLINE - STA. G5+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. G5+00 - SEE ABOVE ,THIS SHEET MATCHLINE - STA. G9+00, SEE SHEET L101 PROJECT BEGINNING, STA. G1+00 MATCHLINE, 19TH AVE. STA. 20+50, SHEET L702512 AMEAMEAMEAMEAMEAMEAMEGRAF STREETBLVD SPRAY ZONE4" PVC IRRIGATIONSLEEVEAMEAMEAMEAMEGRAF STREETBLVD SPRAY ZONEIRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTY29 in / sqftTOTALANNUALH20860,025 gal47,602sqft1,498,916 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR4.60 acre feetH.E.ROTORIRRIG.(NATIVESEED)0 gal0sqftH.E.ROTARYSPRAYIRRIG.(SOD)586,906 gal32,485sqftH.E. BLVDSPRAYIRRIG.(SOD)1,170 gal /week21,060 gal52TREESH.E. TREEBUBBLER196PLANTSH.E. SHRUBDRIP IRRIG.124PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft1,470 gal /week26,460 gal248 gal /week4,464 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION CONTROLLERCONNECTION POINTNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCCCPIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES IN NATIVE SEED ZONES (WATERCOURSE SETBACK) TO BE IRRIGATED THROUGH DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.5.ALL TREES IN BLVD SPRAY ZONES DO NOT NEED DEDICATED BUBBLERS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS. BUBBLERS TO TREES MAY BE OMITTED WHEREOVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PER PLAN.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH ROOM OR APPROVED EXTERNALGRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PERLOCAL CODES AND ORDINANCES, WITH ARCHITECTURE. AND WITH ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE, AND GPM AVAILABLE.LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIES BETWEEN STATED WATER PRESSURE AND GPMAND ACTUAL.16.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.17.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 1.5"/sqft.IrrigationPlanL701Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l700_yti_roadwayirrigationplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L701a1"=20'-0"Graf Street - STA. G9+00 - G12+00N20100401L701b1"=20'-0"Graf Street - STA. G12+00 - G15+00N2010040MATCHLINE - STA. G12+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. G12+00 - SEE ABOVE ,THIS SHEET PROJECT END - STA. G15+00 MATCHLINE, STA. G9+00, SEE SHEET L700 513 ONLYLANLANLANLANLANLANWESWESWESWESCCP19TH AVENUENATIVE SEEDROTARY ZONELANLANLANLANSIOLANSIO19TH AVENUEIRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTY29 in / sqftTOTALANNUALH20860,025 gal47,602sqft1,498,916 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR4.60 acre feetH.E.ROTORIRRIG.(NATIVESEED)0 gal0sqftH.E.ROTARYSPRAYIRRIG.(SOD)586,906 gal32,485sqftH.E. BLVDSPRAYIRRIG.(SOD)1,170 gal /week21,060 gal52TREESH.E. TREEBUBBLER196PLANTSH.E. SHRUBDRIP IRRIG.124PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft1,470 gal /week26,460 gal248 gal /week4,464 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION CONTROLLERCONNECTION POINTNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCCCPIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES IN NATIVE SEED ZONES (WATERCOURSE SETBACK) TO BE IRRIGATED THROUGH DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.5.ALL TREES IN BLVD SPRAY ZONES DO NOT NEED DEDICATED BUBBLERS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS. BUBBLERS TO TREES MAY BE OMITTED WHEREOVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PER PLAN.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH ROOM OR APPROVED EXTERNALGRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PERLOCAL CODES AND ORDINANCES, WITH ARCHITECTURE. AND WITH ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE, AND GPM AVAILABLE.LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIES BETWEEN STATED WATER PRESSURE AND GPMAND ACTUAL.16.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.17.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 1.5"/sqft.IrrigationPlanL702Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l700_yti_roadwayirrigationplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L702a1"=20'-0"19th Avenue - STA 20+50 - 17+00N20100401L702b1"=20'-0"19th Avenue - STA 17+00 - 14+50N2010040MATCHLINE - STA. 17+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. 17+00 - SEE ABOVE ,THIS SHEET MATCHLINE - STA. 14+50 - SEE SHEET L703 MATCHLINE, STA. 20+50, SEE SHEET L700 MATCHLINE, GRAF ST.STA. G1+00, SHEET L700514 LANLANLANSIOWESWESWESWESWES19TH AVENUENATIVE SEEDROTARY ZONELANLANLANSIOSIOWESSIO19TH AVENUENATIVE SEEDROTARY ZONEIRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTY29 in / sqftTOTALANNUALH20860,025 gal47,602sqft1,498,916 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR4.60 acre feetH.E.ROTORIRRIG.(NATIVESEED)0 gal0sqftH.E.ROTARYSPRAYIRRIG.(SOD)586,906 gal32,485sqftH.E. BLVDSPRAYIRRIG.(SOD)1,170 gal /week21,060 gal52TREESH.E. TREEBUBBLER196PLANTSH.E. SHRUBDRIP IRRIG.124PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft1,470 gal /week26,460 gal248 gal /week4,464 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION CONTROLLERCONNECTION POINTNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCCCPIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES IN NATIVE SEED ZONES (WATERCOURSE SETBACK) TO BE IRRIGATED THROUGH DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.5.ALL TREES IN BLVD SPRAY ZONES DO NOT NEED DEDICATED BUBBLERS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS. BUBBLERS TO TREES MAY BE OMITTED WHEREOVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PER PLAN.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH ROOM OR APPROVED EXTERNALGRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PERLOCAL CODES AND ORDINANCES, WITH ARCHITECTURE. AND WITH ALL OTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE, AND GPM AVAILABLE.LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIES BETWEEN STATED WATER PRESSURE AND GPMAND ACTUAL.16.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES.17.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 1.5"/sqft.IrrigationPlanL703Prelim Review09/21/16design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\clients\yti\autocad\01_sheets\yti-roadway improvements\l700_yti_roadwayirrigationplans.dwg The Yellowstone Center for Faith, Adventure, and the Arts Bozeman, Montana CI,HU TMS 1L703a1"=20'-0"19th Avenue - STA 14+50 - 11+00N20100401L703b1"=20'-0"19th Avenue - STA 11+00 - 7+50N2010040MATCHLINE - STA. 11+00 - SEE BELOW ,THIS SHEET MATCHLINE - STA. 17+00 - SEE ABOVE ,THIS SHEET END OF PROJECT - STA. 7+50 MATCHLINE, STA. 14+50, SEE SHEET L102 515