Loading...
HomeMy WebLinkAboutL02.01 - IRRIGATION PLAN - GROUND FLOOREAST OLIVE STREET(58'-6" -60'-0" R.O.W.)SOUTH BLACK AVENUE(57'-6" R.O.W.)CBFCPIRRIRRIRRIRRIRRIRRIRRIRR IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRWPROPERTY LINECAR SHAREGARAGE ACCESSPROPERTY LINEPROPERTY LINEPROPERTY LINEBUILDING ROOF DRAINDETENTION/ IRRIGATIONSTORAGE CHAMBERSAND/OIL SEPARATOR1IRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTYTOTALANNUALH2050,311 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR0.15 acre feet19,025 gal1,054sqftH.E.SPRAYIRRIG.(SOD)24,860 gal1,376sqftH.E. BLVDSPRAYIRRIG.(SOD)0gal / week0 gal0TREESH.E. TREEBUBBLER26PLANTSH.E. SHRUBDRIP IRRIG.81PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft195 gal /week3,510 gal162 gal /week2,916 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION POINT OF CONNECTIONNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCWCBFCPBACKFLOW PREVENTERIRRIGATION CONTROLLERWEATHER STATION1IRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATIONADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS.6.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIPTUBING W/ EMITTERS ADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.7.LAWN AND SEED AREAS TO BE IRRIGATED WITH HUNTER MP ROTATOR NOZZLES ORAPPROVED EQUAL (MSMT NOZZLE WITH A PRECIPITATION RATE OF 0.8"/HOUR OR LESS).8.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE.9.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.10.BACKFLOW PREVENTER AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH. ROOM ORAPPROVED EXTERNAL GRADE BOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPECONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES, WITHARCHITECTURE. AND WITH ALL OTHER TRADES.11.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICALENGINEERING AND ELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.12.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADECHANGES ARE PRESENT.13.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.14.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE,AND GPM AVAILABLE. LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIESBETWEEN STATED WATER PRESSURE AND GPM AND ACTUAL.15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLANON SITE AT ALL TIMES.1105020N1L02.011"=10'-0"Irrigation Plan - Ground FloorSHEET TITLEISSUES/REVISIONSSTAMPSHEET NUMBERZ:\Clients\Black and Olive\Autocad\01_Sheets BLACK & OLIVE, LLC BLACK OLIVE 110 EAST OLIVE STREET, BOZEMAN, MONTANA 59715NOT FORCONSTRUCTION#DateDescription10/04/2016SITE PLAN#DateDescription111/30/2016SITE PLAN REV 1L02.01IRRIGATIONPLAN -GROUND FLOOR