Loading...
HomeMy WebLinkAbout2a-16404 Billion ZMA - application ENGINEERING    CONSULTING      PLANNING    DESIGN  204 N. 11th Ave.  BOZEMAN, MT  59715  406‐581‐3319  www.g‐e‐i.net 204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 1 of 1   September 16, 2016    Chris Saunders  Community Development Planning Interim Director  City of Bozeman Community Development  PO Box 1230  Bozeman, MT 59771‐1230    Re: Billion Auto Plaza – Zoning Map Amendment Application       Dear Chris,    As we discussed earlier this summer, the Billion group would like to change the zoning of the  original Billion Auto Plaza (property on corner of Huffine and Cottonwood).  The purpose of the  zoning change would be to align the zoning with the direction of the Billion Auto Plaza and to match  the zoning with the current Growth Policy.  The zoning would match existing zoning to the north  and east of the subject property.  Please find attached one hardcopy of the Zone Map Amendment  form and narrative, as well as 3 copies of the exhibits, and two CDs with full digital copies of the  submittal.  Also included in the submittal is a check for $2,894 to cover the review fee of $1,785 +  ($57 x 19.45 acres).      Thank you for meeting with me regarding this project.  Let us know if you need anything else as  part of this submittal.      Sincerely,             __________________________                                             Chris Wasia, P.E.                                                       Genesis Engineering, Inc.                                        www.g‐e‐i.net        cc:   H:\1134\001\DOCS\Zoning Amendment\ZMA ‐ cover letter.doc  A1 Development Review Application A1 Page 1 of 3 Revision Date 01-04-16 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications DEVELOPMENT REVIEW APPLICATION 1. PROJECT Development Name: Description: 2. PROPERTY OWNER Name: Full Address: Phone: Email: 3. APPLICANT Name: Full Address: Phone: Email: 4. REPRESENTATIVE Name: Full Address: Phone: Email: 5. PROPERTY Full Street Address: Full Legal Description: Current Zoning: Current Use: Community Plan Designation: Billion Autoplaza Zone Map Amendment J&D Family Limited Partnership - c/o Joe Billion, see attached for additional 270 Automotive Ave, Bozeman MT 59718 406-556-9076 J&D Family Limited Partnership - c/o Joe Billion 270 Automotive Ave, Bozeman MT 59718 406-556-9076 Genesis Engineering Inc. - Chris Wasia 204 North 11th Ave, Bozeman, MT 59715 406-581-3319 cwasia@g-e-i.net See Attached for multiple addresses See Attached for multiple legal descriptions BP Existing Dealership, Car Wash, Auto Body Community Commercial Mixed Use Development Review Application A1 Page 2 of 3 Revision Date 01-04-16 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications Overlay District: Neighborhood Conservation Entryway Corridor None Urban Renewal District: Downtown North 7th Avenue Northeast None 6. STATISTICS (ONLY APPLICATION TYPES 2-12, 17, 24 AND 26) Gross Area: Acres: Square Feet: Net Area: Acres: Square Feet: Dwelling Units: Nonresidential Gross Building Square Feet: 7. APPLICATION TYPES Check all that apply, use noted forms. Form Form 1. Pre-application Consultation None 17. Informal Review INF 2. Master Site Plan MSP 18. Zoning Deviation None 3. Site Plan SP 19. Zoning or Subdivision Variance Z/SVAR 4. Subdivision pre-application PA 20. Conditional Use Permit CUP 5. Subdivision preliminary plat PP 21. Special Temporary Use Permit STUP 6. Subdivision final plat FP 22. Comprehensive Sign Plan CSP 7. Subdivision exemption SE 23. Regulated Activities in Wetlands RW 8. Condominium Review CR 24. Zone Map Amendment (non Annexation) ZMA 9. PUD concept plan PUDC 25. UDC Text Amendment ZTA 10. PUD preliminary plan PUDP 26. Growth Policy Amendment GPA 11. PUD final plan PUDFP 27. Modification/Plan Amendment MOD 12. Annexation and Initial Zoning ANNX 28. Extension of Approved Plan EXT 13. Administrative Interpretation Appeal AIA 29. Reasonable Accommodation RA 14. Administrative Project Decision Appeal APA 30. Other: 15. Commercial Nonresidential COA CCOA 1 6. Historic Neighborhood Conservation Overlay COA NCOA 8. APPLICATION FEES AND MATERIALS A. Fees are to be provided based upon the adopted fee schedule FS. Contact our office for an estimate. approximately 46,000 square feet 19.45 acres 12.6 Development Review Application A1 Page 3 of 3 Revision Date 01-04-16 Required Forms: Varies by project type Recommended Forms: Presentation of submitted plans and specifications B. Application materials shall be submitted for each application as shown in the specific guidance and checklists that is provided for each application type. A common development review application form and common notice materials may be provided for an application that includes more than one application type. All other application materials shall be submitted for each individual application type per the project guidance and checklists. 9. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance – I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy or costs to correct noncompliance. Applicant Signature: Printed Name: Owner Signature: Printed Name: Owner Signature Printed Name: If signing as a corporation, please provide the title and position of the individual signing on behalf of the corporation. Attach separate sheets for additional owner signatures. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net J&D Family Limited Partnership - Joe Billion J&D Family Limited Partnership - Joe Billion Billion Family Limited Partnership - Joe Billion ENGINEERING CONSULTING PLANNING DESIGN 204 N. 11th Ave.  BOZEMAN, MT 59715  406-581-3319  www.g-e-i.net Development Review Application Additional Street Addresses and Legal Descriptions Legal: Lot 1A, Block 3, Amended JC Billion Auto Plaza Sub, Plat J-180-C Street Address: 171 Competition Drive, Bozeman, MT 59718 Legal: Lot 3, Block 3, JC Billion Auto Plaza Sub, Plat J-180 Street Address: 100 Competition Drive, Bozeman, MT 59718 Legal: Lot 1A, Block 2, Amended JC Billion Auto Plaza Sub, Plat J-180-A Street Address: Auto Plaza Drive, Bozeman, MT 59718 Legal: Lot 3, Block 1, JC Billion Auto Plaza Sub, Plat J-180 Street Address: Competition Drive, Bozeman, MT 59718 Legal: Lot 2, Block 1, JC Billion Auto Plaza Sub, Plat J-180 Street Address: Auto Plaza Drive, Bozeman, MT 59718 Legal: Lot 1, Block 1, JC Billion Auto Plaza Sub, Plat J-180 Street Address: 1 Auto Plaza Drive, Bozeman, MT 59718 Legal: Lot 4, Block 1, JC Billion Auto Plaza Sub, Plat J-180 Street Address: Common Area H:\1134\001\DOCS\Zoning Amendment\addresses and legals.doc 204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 1 of 1 ZMA Zone Map Amendment Required Materials ZMA Page 1 of 2 Revision Date 1-05-16 Required Forms: A1, N1 Recommended Forms: Required Forms: ZONE MAP AMENDMENT REQUIRED MATERIALS APPLICATION SETS 3 total sets are required that include 1 copy of every item below bound or folded into 8½ x 11 or 8½ x 14 sets. This application is only for a proposed zone map amendment to in association with annexation. If an annexation is associated with the map amendment, see form ANNX. Complete and signed development review application form A1. Plan sets that include all items required in the zone map amendment checklist below. Standard application sets required plan sizes: 2 sets that include full size 24 x 36 inch plans 1 set that include 11 x 17 inch plans 2 digital versions of all materials (JPEG or PDF) on separate CD-ROM’s or USB drive. Individual files must be provided at 5MB or less in size. Files shall be named according to naming protocol. Notes: All plans must be drawn to scale on paper not smaller than 8½ x 11 inches or larger than 24 x 36 inches. The name of the project must be shown on the cover sheet of the plans. If 3-ring binders will be used, they must include a table of contents and tabbed dividers between sections. Plans that are rolled or not bound into sets will not be accepted. NOTICING MATERIALS Completed and signed property adjoiners certificate form N1 and materials. APPLICATION FEE Base fee: $1, 785 Plus: $57 per acre ZONE MAP AMENDMENT CRITERIA 1. A thorough project narrative including a detailed response to the following: a. Is the new zoning designed in accordance with the growth policy? How? b. Will the new zoning secure safety from fire and other dangers? How? c. Will the new zoning promote public health, public safety and general welfare? How? d. Will the new zoning facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? How? e. Will the new zoning provide reasonable provision of adequate light and air? How? f. Will the new zoning have an effect on motorize and non-motorized transportation systems? How? g. Does the new zoning promote compatible urban growth? How? h. Does the new zoning promote the character of the district? How? i. Does the new zoning address the affected area’s peculiar suitability for particular uses? How? j. Was the new zoning adopted with a view to conserving the values of buildings? How? k. Does the new zoning encourage the most appropriate use of land throughout the jurisdictional area? 2. If map amendment, provide an exhibit of the property to be modified. Provide existing zoning designation and the proposed land use designation. The exhibit should include the legal limits of the property and size in square feet and acreage. If adjacent to a right of way the zoning should extend to the centerline of the right of way. ✔ ✔ ✔ ✔ ✔ Zone Map Amendment Required Materials ZMA Page 2 of 2 Revision Date 1-05-16 Required Forms: A1, N1 Recommended Forms: Required Forms: CERTFICATION AND SIGNATURES I (We), the undersigned, hereby certify that the information contained in this application is true and correct to the best of my (our) knowledge. Property Owner’s Signature(s) Date State of County of On this day of , 20 , before me, a Notary Public ofr the State of , personally appeared , known to me to be the person(s) whose name(s) is(are)) subscribed to the above instrument and acknowledge to me that he/she/they executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and year first above written. Notary Public for State of Residing at My Commission Expires CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net ENGINEERING    CONSULTING      PLANNING    DESIGN  204 N. 11th Ave.  BOZEMAN, MT  59715  406‐581‐3319  www.g‐e‐i.net 204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 1 of 2   September 16, 2016    Zone Map Amendment Narrative  Lot 3 of Minor Subdivision 340 & J.C. Billion Auto Plaza Subdivision         1. A thorough narrative including a detailed response to the following:  a. Is the new zoning designed in accordance with the growth policy?  The growth policy lists the subject property as “Community Commercial Mixed Use”.  The proposed  zoning change from BP to B‐2 actually brings the zoning closer to the growth policy by changing the  zoning from industrial to commercial.    b. Will the new zoning secure safety from fire and other dangers? How?  The proposed B‐2 zoning has standards for building height, setback, and list of authorized uses within  the current U.D.O. which will help secure safety from fire in future development in this area.  The  surrounding north, south, and east lands are already zoned B‐2 and secure safety from fire is currently  being met.  Emergency vehicle access standards as well as the applicable building codes will also aid in  the fire safety.    c. Will the new zoning promote public health, public safety and general welfare? How?  The proposed B‐2 zoning has standards which promote public health, safety and welfare within the  current U.D.O.  The zoning changes does not affect the public health standards established by the City  and State for roads and public utilities.  All City and Federal public safety requirements will still be  required in the proposed B‐2 zoning.    d. Will the new zoning facilitate the adequate provision of transportation, water, sewerage, schools, parks,  and other public requirements? How?  The proposed B‐2 zoning has standards to provide for adequate transportation, water, sewerage,  schools, and parks within the current U.D.O. The zoning change does not affect the public health  standards established by the City and State for roads and public utilities.      e. Will the new zoning provide reasonable provision of adequate light and air? How?  The building height and landscaping requirements are the same for BP and B‐2 zoning.  Therefore, the  zoning change will not affect the provision of adequate light or air.  Separate national and local building  requirements will also likely provide for a reasonable provision of adequate light and air.    f. Will the new zoning have an effect on motorized and non‐motorized transportation systems? How?  No, the effect on motorized and non‐motorized transportation systems will remain the same.    g. Does the new zoning promote compatible urban growth? How?  The new zoning promotes compatible urban growth since the proposed zoning matches existing zoning  to the south, east, and north.  The proposed zoning is also more aligned with the current growth policy.    h. Does the new zoning promote the character of the district? How?  Yes, the new zoning will better promote the character of the district since the existing buildings and  uses will now be principle authorized uses within the proposed zoning district.       204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 2 of 2 i. Does the new zoning address the affected area’s peculiar suitability for particular uses? How?  The new zoning does will not significantly affect the areas suitability for particular uses. The primary use  of the existing buildings is currently a non‐conforming use within the existing zoning and a principle use  within the proposed zoning.  The new zoning will also match surrounding zoning to the south, east and  north, while still leaving a buffer to low density residential zoning.    j. Was the new zoning adopted with a view to conserving the values of buildings? How?  The proposed zoning will surely not depreciate the value of the existing buildings.  The value of the  buildings will most likely be constrained as the result of the proposed zoning change and principle uses.    k. Does the new zoning encourage the most appropriate use of land throughout the jurisdictional area?  Yes. Since most of the area is already existing buildings and the existing buildings are principle  authorized uses within the proposed zoning, the new zoning does encourage the most appropriate use  of land.  The proposed re‐zoning to B‐2 is also congruent with zoning adjacent main corridors  throughout the City of Bozeman zoning area.                             H:\1134\001\DOCS\Zoning Amendment\re‐zoning narrative.doc  N1 Noticing Materials Page 1 of 1 Revision Date 1-05-16 Required Forms: N1 Recommended Forms: Required Forms: NOTICING MATERIALS Notice is required for certain projects in order for citizens to participate in decision making which affects their interests and provides opportunity to receive information pertinent to an application that would not otherwise be available to the decision maker. SITE PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT, VARIANCE, DEVIATION, FIRST MINOR SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site, attached to this checklist. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. MAJOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site and not physically contiguous (touching a boundary) to the subdivision, attached to this checklist. Clearly label list ADJOINER NOT CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. Legible list of full names and addresses of all property owners physically contiguous (touching a boundary) including recorded purchasers under contract for deed to be sent certified mail attached to this checklist. Clearly label list CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed. Two sets additional mailing labels with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed attached. NOTICE Current property owners of record can be found at the Gallatin County Clerk and Recorder’s Office in the Gallatin County Courthouse 311 West Main Street Bozeman, Montana. CERTIFICATION I, _____________________________________________, hereby certify that, to the best of my knowledge, the attached name and address list of all adjoining property owners (including all condominium owners, within 200 feet of the property located at ________________________________________________________, is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccurate list may delay review of the project. _______________________________________ Signature CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net JEREMY MAY J.C. BILLION AUTO PLAZA SUBDIVISION & AMENDMENTS(J-180, J-180-A, J-180-C) ✔ ✔ ✔ ✔ ✔ ✔ Proposal _________________________________ $GMRLQLQJ3URSHUW\2ZQHUVAdjacent to proposal site and across watercourses, roads*, etc. Within _______ feet of proposal site./HJDO'HVFULSWLRQRI3URSHUW\3URSHUW\2ZQHU¶V1DPH0DLOLQJ$GGUHVVRI3URSHUW\2ZQHUIURP&RXQW\7D[5HFRUGV12345678910* If road is a state highway, also include Montana Department of Transportation in property owner list. Page _____ of ______ (If additional pages of this form are needed, download the file entitled "Adjoiner List".)Adjoiner List-051306/13CONTIGUOUS TO PROJECT✔200W1/2,SE1/4,SE1/4, SEC 9, T02S, R05E FLOWEREE FAMILY, LLC C/O MUCKEL ANDERSONPO BOX 1869, RENO, NV 89505-1869HUFFINE LANE (HIGHWAY 191) Montana Department of TransportationPO BOX 1110, BOZEMAN, MT 5977111 Proposal _________________________________ $GMRLQLQJ3URSHUW\2ZQHUVAdjacent to proposal site and across watercourses, roads*, etc. Within _______ feet of proposal site./HJDO'HVFULSWLRQRI3URSHUW\3URSHUW\2ZQHU¶V1DPH0DLOLQJ$GGUHVVRI3URSHUW\2ZQHUIURP&RXQW\7D[5HFRUGV12345678910* If road is a state highway, also include Montana Department of Transportation in property owner list. Page _____ of ______ (If additional pages of this form are needed, download the file entitled "Adjoiner List".)Adjoiner List-051306/13ADJOINER NOT CONTIGUOUS✔✔200LOT 11, BLOCK 1, LOYAL GARDEN SUB, PHASE 1A GOLDEN GATE PROPERTIES, LLC 2149 WEST DURSTON ROAD, SUITE 31, BOZEMAN, MT 59718-2740LOT 1, BLOCK 1, LOYAL GARDEN SUB, PHASE 1A TMT&T, 2009 TRUST, C/O AMY KNOWLESPO BOX 990861, REDDING, CA 96099-0861LOT 2, BLOCK 1, LOYAL GARDEN SUB, PHASE 1A BOZEMAN HEALTH 915 HIGHLAND BLVD, BOZEMAN, MT 59715-6902LOT 1, MINOR SUB 454B PARK STREET HOLDINGS, LLC600 SOUTH MAIN STREET, BUTTE, MT 59701-2534LOT 5A, MINOR SUB 340A FIRST SECURITY BANK PO BOX 910, BOZEMAN, MT 59771-0910LOT 4, MINOR SUB 340 AO GROUP, LLC 536 SOUTH COTTONWOOD RD, SUITE 100, BOZEMAN, MT 59718-9529LOT 3, MINOR SUB 340 THEAH, LLC - C/O COTTONWOOD VET450 COTTONWOOD ROAD, BOZEMAN, MT 59718-9207UNIT 101, 102 & 302, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340HRDC OF DISTRICT IX, INC 32 SOUTH TRACY AVE, BOZEMAN, MT 59715-4659UNIT 103, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340KIMBERLEY HEITMAN 244 SOUTH COTTONWOOD RD, UNIT 103, BOZEMAN, MT 59718-923913 Proposal _________________________________ $GMRLQLQJ3URSHUW\2ZQHUVAdjacent to proposal site and across watercourses, roads*, etc. Within _______ feet of proposal site./HJDO'HVFULSWLRQRI3URSHUW\3URSHUW\2ZQHU¶V1DPH0DLOLQJ$GGUHVVRI3URSHUW\2ZQHUIURP&RXQW\7D[5HFRUGV12345678910* If road is a state highway, also include Montana Department of Transportation in property owner list. Page _____ of ______ (If additional pages of this form are needed, download the file entitled "Adjoiner List".)Adjoiner List-051306/13ADJOINER NOT CONTIGUOUS✔✔200UNIT 104, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340GTG COTTONWOOD LLC 210 CIRQUE DRIVE, BOZEMAN, MT 59718-9315UNIT 105, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340JASON & RICHARD SCHNEIDER337 SHOSHONE STREET, SHERIDAN, WY, 82801-5527, UNIT 106, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340LAURA E. ORSER 244 SOUTH COTTONWOOD RD, UNIT 106, BOZEMAN, MT 59718-9239UNIT 107, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340ANDREA FEIGE 244 SOUTH COTTONWOOD RD, UNIT 107, BOZEMAN, MT 59718-9239UNIT 108, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340JACK R. TOLEDO, JR 244 SOUTH COTTONWOOD RD, UNIT 108, BOZEMAN, MT 59718-9239UNIT 201, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340SANDRA M. TANSY 244 SOUTH COTTONWOOD RD, UNIT 201, BOZEMAN, MT 59718-9239UNIT 202, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340ROGER W. RENNER 244 SOUTH COTTONWOOD RD, UNIT 202, BOZEMAN, MT 59718-9239UNIT 203, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340NIEDENS BROADWATER, LLC214 SILVER CLOUD CIRCLE, BOZEMAN, MT 59715-0631UNIT 204, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340TRACY MARSH 244 SOUTH COTTONWOOD RD, UNIT 204, BOZEMAN, MT 59718-9239UNIT 205, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340CLINTON G. BISHOP, JR. 244 SOUTH COTTONWOOD RD, UNIT 205, BOZEMAN, MT 59718-923923 Proposal _________________________________ $GMRLQLQJ3URSHUW\2ZQHUVAdjacent to proposal site and across watercourses, roads*, etc. Within _______ feet of proposal site./HJDO'HVFULSWLRQRI3URSHUW\3URSHUW\2ZQHU¶V1DPH0DLOLQJ$GGUHVVRI3URSHUW\2ZQHUIURP&RXQW\7D[5HFRUGV12345678910* If road is a state highway, also include Montana Department of Transportation in property owner list. Page _____ of ______ (If additional pages of this form are needed, download the file entitled "Adjoiner List".)Adjoiner List-051306/13ADJOINER NOT CONTIGUOUS✔✔200UNIT 206, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340DAVID M. SWIFT 244 SOUTH COTTONWOOD RD, UNIT 206, BOZEMAN, MT 59718-9239UNIT 207, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340DONNA MILLER 244 SOUTH COTTONWOOD RD, UNIT 207, BOZEMAN, MT 59718-9239 UNIT 208, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340MAYON SARGEANT 244 SOUTH COTTONWOOD RD, UNIT 208, BOZEMAN, MT 59718-9239UNIT 301, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340JENNY McCUNE 244 SOUTH COTTONWOOD RD, UNIT 301, BOZEMAN, MT 59718-9239UNIT 303, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340LARRY M. ZAPF 244 SOUTH COTTONWOOD RD, UNIT 303, BOZEMAN, MT 59718-9239UNIT 304, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340CAROL MATLAND 244 SOUTH COTTONWOOD RD, UNIT 304, BOZEMAN, MT 59718-9239UNIT 305, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340DAVID & SARAH KENNEY 244 SOUTH COTTONWOOD RD, UNIT 305, BOZEMAN, MT 59718-9239UNIT 306, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340KYLE HELM 244 SOUTH COTTONWOOD RD, UNIT 306, BOZEMAN, MT 59718-9239UNIT 308, TBP CONDO, LOT 2 CONDO MASTER, MINOR SUB 340STEPHANIE STRATTON 210 TALON WAY, BOZEMAN, MT 59718-975933