HomeMy WebLinkAbout12-05-16 CC Mtg - C9. Library Depreciation Fund CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Library Depreciation Fund Capital Improvement Plan
(CIP) for Fiscal Years 2018-2022
AGENDA ITEM TYPE: Consent
MEETING DATE: December 5, 2016
RECOMMENDATION: Adopt the Library Depreciation Fund Capital Improvement
Plan (CIP) for Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Library, City Manager, and other city staff met in October to develop the attached Capital
Plan for the equipment and capital needs of the Library. This plan was proposed to and
approved by the Library Board at their meeting on November 16, 2016.
Items of Note:
• LIB12-Pedestrian Access-Library Parking Lot – This project is a re-design and
construction of pedestrian-friendly features of the Library Parking Lot. The revised site
plan has been completed by WTI with estimated construction costs of $50,000 for Phase I
and $30,000 for Phase II. The Downtown TIF will be participating with an amount to be
determined and the balance coming from The Library Depreciation Reserve. The Library
74
Foundation will also contribute by providing the funds needed for changes to the
impacted landscaping.
• LIB24 Two Self-Check Kiosks for Main and Second Floor – In response to numerous
patron requests, the Library is asking for 2 self-check kiosks to accommodate patrons
who want to check their materials out themselves and leave. This will lessen the burden
on circulation staff and serve the patrons more efficiently.
• LIB22 Carpet for the Public Area of Library – This project is scheduled for FY19 and
would replace worn out carpeting on both floors in the public areas of the Library.
• Other Items with Unknown Costs: The following items are included as an indicator
that the project is being worked on, including development of estimated costs. Because
this fund is budgeted with collaboration between the City Commission and the Library
Board of Trustees, projects may move forward during FY18 budget development, or
continue to future year capital plans.
• LIB13 – Reconfiguration of Existing Building Space
• LIB14 – Implementation of Landscape Master Plan
• LIB20 – Security system
Revenue estimates for the Plan: Any unspent budget authority within the Library’s
departmental budget in the General Fund is transferred to this fund at year end. The amount
transferred each year fluctuates greatly; especially when personnel positions remain vacant for
extended periods of time. Our estimate for the coming years of the plan are that approximately
1.9% of the annual budget will remain unspent – to be transferred to this fund.
75
Remaining Budget for Library Department of General Fund
Fiscal Year Amount Unspent
2012 125,394
2013 17,600
2014 1,238
2015 44,500
2016 5,458
2017 Estimate - Average $ 38,838
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: November 21, 2016
Attached: Library Depreciation Fund CIP
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
2012 2013 2014 2015 2016 2017
Estimate -
Average
Remaining Library Budget
76
Library Depreciation Reserve Fund Capital Improvement PlanFinancial SummaryCurrent YearFY17FY18FY19 FY20 FY21 FY22UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 259,000$ 209,000$ 157,357$ (53,518)$ (13,612)$ 27,093$ Plus: Estimated Annual Unspent Appropriations38,357$ 39,124$ 39,907$ 40,705$ 41,519$ ‐$ Plus: Library Foundation for Bookmobile Less: Scheduled CIP Project Costs(50,000)$ (90,000)$ (250,000)$ ‐$ ‐$ ‐$ ‐$ Projected Year‐End Cash Dedicated to CIP209,000$ 157,357$ (53,518)$ (13,612)$ 27,093$ 68,612$ Assumptions Made for Revenue Estimates:FY18 FY19 FY20 FY21 FY22Estimated Annual Library Budget1,960,000$ 2,018,800$ 2,059,176$ 2,100,360$ 2,142,367$ 2,185,214$ Estimated Amount of Budget left Unused0.3%1.9%1.9%1.9%1.9%1.9%Estimated Annual Unspent Appropriations5,880$ 38,357$ 39,124$ 39,907$ 40,705$ 41,519$ Current Budget Amount Dedicated to CIP %100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Capital Improvements %0.0%0.0%0.0%0.0%0.0% Total % Dedicated to CIP100.0% 100.0% 100.0% 100.0% 100.0%Total Estimated Revenues Dedicated to CIP38,357$ 39,124$ 39,907$ 40,705$ 41,519$ ProjectedProjectedCURRENT300,000250,000200,000150,000100,00050,0000Library Depreciation Fund Projects & Equipment77
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22LIB12LIBRARYPEDESTRIAN ACCESS ‐ LIBRARY PARKING LOT$30,000LIB13LIBRARYRECONFIGURATION OF EXISTING BUILDING SPACELIB14LIBRARYIMPLEMENTATION OF LANDSCAPE MASTER PLANLIB20LIBRARYSECURITY SYSTEM FOR THE LIBRARY ‐ COST UNKNOWN, ANTICIPATED FOR FY18LIB21LibraryTASK CHAIRS FOR PUBLIC AND STAFF$20,000LIB22LIBRARYNEW CARPET FOR THE PUBLIC AREA OF THE LIBRARY.$230,000LIB23LIBRARY2 COPIERS: CHILDREN'S DEPT AND STAFF WORKROOM$20,000LIB24LIBRARY(2) SELF‐CHECK KIOSK FOR MAIN AND SECOND FLOO$40,000Summary for Library Depreciation Reserve (8 items)Totals by year:$90,000FY21FY22FY18UnscheduledFY20$250,000FY1978
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB12
DEPARTMENT
LIBRARY
PROJECT NAME
PEDESTRIAN ACCESS - LIBRARY PARKING LOT
FY18
$30,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Re-design and construction of pedestrian-friendly features in the Library Parking lot. Patrons parking on the west side of the
parking lot have to cross through vehicle traffic and around curbing/medians to access the Library entrance. In addition, proposed
renovations of the old Harrington Building adjacent to the Library have included adding a pedestrian pathway, crossing from
Wallace to the Library parking lot. This improvement to pedestrian access to the parking lot is expected to have consequences
for how many people will be crossing through this heavily used lot. Accessability requirements for line-of-travel and the need to
navigate the existing curbs are a concern. Some parking spaces may have to be eliminated. A revised site plan has been completed
by WTI with estimated construction costs for Phase I of $50,000 and Phase II at $30,000 – Downtown TIF participating in an
amount of TBD, with the balance coming from the Library Depreciation Reserve. The Library Foundation will also participate by
providing the funds needed for changes to the landscaping.
ALTERNATIVES CONSIDERED
Leave parking lot configuration the way it is - without a pedestrian path from Wallace.
ADVANTAGES OF APPROVAL
Improved safety for pedestrians trying to access the Library or cross the library property.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None.
FUNDING SOURCES
Library Depreciation Reserve - with possible contribution from the Downtown Tax Increment District.
New
Replacement
Equipment
Project
FY20 FY21 FY22
79
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB13
DEPARTMENT
LIBRARY
PROJECT NAME
RECONFIGURATION OF EXISTING BUILDING SPACE
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
The Library’s Strategic Plan for 2013-2017 includes reviewing current Library space usage and ensuring that we are using it as
efficiently and effectively as possible. We are working with local architect, Rob Pertzborn, (funded by the Foundation) to see
what options we have for possibly reconfiguring some of our existing space, i.e. the Computer Training Lab and the Foundation
offices. The Strategic Plan also calls for more space that can be used by local businesspeople and patrons for planning and creative
purposes. We have begun meeting with the architect but no decisions have been made and the project is still in initial phases, so
no dollar amount has been determined yet.
ALTERNATIVES CONSIDERED
Leaving the interior space utilization as it currently exists.
ADVANTAGES OF APPROVAL
The Library’s two public meeting rooms are booked months in advance, so people ask the Library staff for quiet space to have small meetings
frequently. One of our goals is to have a public work space that would include a 3-D printer and other materials conducive to creativity. That
could only be accomplished by making some changes to the current space configuration, and would answer the requests from the public.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY20 FY21 FY22
80
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB14
DEPARTMENT
LIBRARY
PROJECT NAME
IMPLEMENTATION OF LANDSCAPE MASTER PLAN
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
The Library currently has no completed Grounds Master Plan; although there are plans for the installation of memorial benches
and trees. We want to work with a landscape architect to develop a plan that will replace high-maintenance plants with low-
maintenance, drought-resistant plantings that will enhance the Library’s grounds and maintain the Library’s appearance as a
community jewel. This would also complement the landscaping that has been done by the owners of the Harrington building on
south Wallace, adjacent to the Library’s west property line, and accommodate any upgrades to the parking lot that would be
made this year (LIB12). Because the project is in the initial phases, there is no estimate of cost yet.
ALTERNATIVES CONSIDERED
Maintain the current grounds appearance.
ADVANTAGES OF APPROVAL
The Library staff gets regular complaints and comments from our customers regarding the weeds in the ‘dog bones” of the parking lot, and the
sometimes unkempt flower beds and grounds. City Facilities staff do their best to keep the grounds mowed but weeding the current rocky
spaces is almost impossible due to their design. The current plantings are high-maintenance and time-intensive, which makes keeping them
healthy and attractive very difficult. We would like to keep the Library’s appearance up and remain a place that community members are proud
of; a landscaping master plan will help us do that.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Reserve
New
Replacement
Equipment
Project
FY20 FY21 FY22
81
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB20
DEPARTMENT
LIBRARY
PROJECT NAME
Security System for the Library - cost unknown, anticipated for FY18
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of a security system with cameras for the Library’s interior, lobby, and exterior. This will be an agenda item for
discussion during an upcoming Library Board meeting.
ALTERNATIVES CONSIDERED
Continue without security system
ADVANTAGES OF APPROVAL
Increased safety of Library customers and staff; increased security for the many thousands of dollars of materials, equipment and art in the
Library.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
82
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB21
DEPARTMENT
Library
PROJECT NAME
Task chairs for public and staff
FY18
$20,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Purchase 75 task chairs to replace worn out public and staff chairs that were purchased ten years ago and have been in constant
use since then.
ALTERNATIVES CONSIDERED
Continue to use chairs that are currently in use until they disintegrate.
ADVANTAGES OF APPROVAL
Ensure comfort and safety of the staff and patrons in need of appropriate seating.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
83
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB22
DEPARTMENT
LIBRARY
PROJECT NAME
New carpet for the public area of the Library.
FY18 FY19
$230,000
Unscheduled
DESCRIPTION OF PROJECT
Replace worn carpeting in Library on both floors, in public areas.
ALTERNATIVES CONSIDERED
Library patrons and staff will continue to walk on worn carpet.
ADVANTAGES OF APPROVAL
The 10-yr. old carpet is beginning to show a great deal of wear from the 1000-1500 people a day who come through the library. It will have to
be replace at some point for both aesthetic reasons and as a safety precaution.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
84
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB23
DEPARTMENT
LIBRARY
PROJECT NAME
2 copiers: Children's Dept and staff workroom
FY18 FY19
$20,000
Unscheduled
DESCRIPTION OF PROJECT
Place a small color copier in the Children's Department and replace the aging black & white printer in the staff workroom until it
quits.
ALTERNATIVES CONSIDERED
Place a small color copier in the Children's Department and replace the aging black & white printer in the staff workroom until it quits.
Continue to provide only black & white copies to public in Children’s; use the existing black & white printer in the staff workroom until it quits.
According to the service rep, we will not be able to get parts for the machine after the next year.
ADVANTAGES OF APPROVAL
Patrons of the Children’s department have asked for color printing for some time and will be pleased to have this service. A new color printer
in the staff workroom will help Library staff complete work efficiently.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
85
CIP Project Fund
Library Depreciation Reserve
PROJECT NUMBER
LIB24
DEPARTMENT
LIBRARY
PROJECT NAME
(2) Self-check kiosk for Main and Second floo
FY18
$40,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
We need to put a self-check kiosk on the second floor to accommodate people who want to check their materials out
themselves and leave, rather than waiting in line to use the self-check machines on the first floor. This is in response to numerous
patron requests. It will lessen the burden on circulation staff and serve the patrons more efficiently.
ALTERNATIVES CONSIDERED
Continue to have no self-check machines upstairs and send everyone to the first floor Circulation desk or two kiosks.
ADVANTAGES OF APPROVAL
Less dependence on Library staff and greater efficiency for Library patrons.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Library Depreciation Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
86