HomeMy WebLinkAbout12-05-16 CC Mtg - C8. Parking Fund CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Parking Fund Capital Improvement Plan (CIP) for Fiscal
Years 2018-2022.
AGENDA ITEM TYPE: Consent
MEETING DATE: December 5, 2016
RECOMMENDATION: Adopt the Parking Fund Capital Improvement Plan (CIP) for
Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th.
The Assistant City Manager and other city staff met in October & November to develop the
attached Capital Plan for the equipment and capital needs of the Parking Fund. The plan was
approved as presented at the Parking Commission’s meeting on November 10, 2016.
Item of Note:
• P022 Parking Garage and Citation Equipment – As the parking garage is not staffed,
our equipment must be highly reliable and operate with limited staff intervention.
Because too often breakdowns have stranded customers in the garage, the Parking
Commission has requested this equipment to attempt to reduce garage equipment
malfunctions, which anger customers and diminish trust in the facility and of local
government. Also as new technology and user interfaces are available, improved
56
reliability and customer experience will result in increased revenues through more
reliable equipment operation and enforcement in general.
• P023 Parking Garage Security Cameras – Presently, two video cameras cover the exit
gates of the garage. The cameras do not provide adequate coverage of the entire facility.
Limited internet speed heeded efforts in the past but recent installation of fiber has
provided the needed bandwidth to support additional cameras. These additional security
cameras placed in key locations will provide the security needed on all levels of the
garage and stairwells.
• P001 Willson Lot Redesign – While originally funded in FY17, we will not be
completing the project due to the timeframes related to its use as a construction staging
site. Instead, we have added the project back into the plan in FY19.
• Parking operations do not generate adequate revenues to fund capital replacement or
expansion projects. The Parking Fund must rely heavily on the Downtown Tax
Increment Finance (TIF) District to support its capital plan. The Downtown TIF is
planning to contribute $1,000,000 to Parking Capital between FY16-FY21.
• Parking Revenues are unpredictable; a large portion of the funds (roughly 50%) come
from parking enforcement (ticket/fine) revenues.
640 - Parking Fund Revenue history Amount Change
2012 $ 395,914.00 -7.3%
2013 $ 431,128.00 8.9%
2014 $ 619,319.00 43.7%
2015 $ 584,593.00 -5.6%
2016 $ 647,709.00 10.8%
Linear Trend 2017 $ 700,000.00
Average FY12- FY16 $ 535,732.53 10.1%
57
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: November 17, 2016
Attached: Parking Fund CIP
$-
$100,000.00
$200,000.00
$300,000.00
$400,000.00
$500,000.00
$600,000.00
$700,000.00
2011 2012 2013 2014 2015 2016
Parking Fund Revenues
58
Parking FundCapital Improvement PlanFinancial Summary Current YearFY17 FY18 FY19 FY20 FY21 FY22UnscheduledProjected Beginning Balance Dedicated to CIP 166,616$ 176,616$ 190,716$ 146,242$ 174,862$ 125,914$ Cash In Lieu of Parking Plus: Parking Revenues Dedicated to Capital‐$ 44,100$ 46,305$ 48,620$ 51,051$ 53,604$ ‐$ Plus: Downtown TIF Interest Contribution 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Plus: TIF Contribution for parking lot redesign and improv.‐$ 250,000$ 300,000$ 280,000$ 170,000$ Plus: Additional TIF Contribution Request‐$ ‐$ Less: Scheduled CIP Costs (adjusted)‐$ (290,000)$ (400,779)$ (310,000)$ (280,000)$ (45,000)$ (2,310,000)$ Projected Year‐End Cash Dedicated to CIP176,616$ 190,716$ 146,242$ 174,862$ 125,914$ 144,517$ Assumptions Made for Revenue Estimates: Current YearFY17 FY18 FY19 FY20 FY21 FY22Estimated Annual Parking Fund Revenues 700,000$ 700,000$ 735,000$ 771,750$ 810,338$ 850,854$ Estimated Growth in Revenues‐ 5% 5% 5% 5% 5%Total Estimated Revenues 700,000$ 735,000$ 771,750$ 810,338$ 850,854$ 893,397$ Current Revenues Dedicated to CIP % 0.0% 0.0% 6.0% 6.0% 6.0% 6.0% Plus: Increase Dedicated to Capital Improvements % 0.0% 6.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 0.0% 6.0% 6.0% 6.0% 6.0% 6.0%Total Estimated Revenues Dedicated to Capital‐$ 44,100$ 46,305$ 48,620$ 51,051$ 53,604$ ProjectedProjectedCURRENT2,500,0002,250,0002,000,0001,750,0001,500,0001,250,0001,000,000750,000500,000250,0000Parking Fund Capital Projects 59
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22Parking FundGF199PARKINGPROFESSIONAL BUILDING RECONFIGURATION ‐ PHASE 2$35,779P001PARKINGWILLSON LOT REDESIGN$300,000P004PARKINGSURFACE PARKING LOT HARDWARE & SOFTWARE SYSTEMS$15,000$15,000$15,000$15,000P012PARKINGARMORY LOT REDESIGN AND IMPROVEMENTS$250,000P013PARKINGBLACK (CARNEGIE) LOT REDESIGN & IMPROVEMENTS$410,000P014PARKINGPARKING GARAGE CRACK MAINTENANCE AND REPAIR$5,000$0$5,000$20,000$5,000$20,000P015PARKINGPARKING GARAGE ROOF PROJECT$400,000P016PARKINGPURCHASE OF PROPERTY FOR FUTURE PARKING FACILITIES IN THE DOWNTOWN PARKING DISTRICT.$1,500,000P017PARKINGROUSE PARKING LOT RE‐DESIGN AND IMPROVEMENTS$280,000P020PARKINGPARKING VEHICLE LEASES$10,000$10,000$10,000$10,000$10,000P021PARKINGPORTABLE RADIO REPLACEMENT$20,000P022PARKINGPARKING GARAGE AND CITATION EQUIPMENT$250,000P023PARKINGPARKING GARAGE SECURITY CAMERAS$25,000Summary for Parking Fund (13 items)Totals by year:$280,000 $45,000$290,000$2,310,000FY21FY22FY18UnscheduledFY20$310,000$400,779FY1960
CIP Project Fund
Parking Fund
PROJECT NUMBER
GF199
DEPARTMENT
PARKING
PROJECT NAME
PROFESSIONAL BUILDING RECONFIGURATION - Phase 2
FY18 FY19
$35,779
Unscheduled
DESCRIPTION OF PROJECT
The City is responding to growth by adding staff to meet the increased demand for services in our community. We have also
reorganized divisions (Community Development) and created other divisions (Stormwater) to improve efficiency and better serve
our community. In order to accommodate this growth, we need to remodel the Stiff Building. In FY16 the City Commission
approved a Phase 1 of the remodel that will provide a better use of existing space by relocating certain functions to the basement
and reclaiming unused square footage. Approval of Phase II would allow the consolidation of Community Development (Planning
and Building) together on one floor and the consolidation of Public Works Services (Engineering, GIS and Stormwater) together
on another floor. This will allow better coordination of staff and better service to our public. Phase 1 is anticipated to be
completed late spring of 2016.
ALTERNATIVES CONSIDERED
Continue to operate as we are today
ADVANTAGES OF APPROVAL
Community Development would be able to consolidate its operations and services to allow for an integrated customer-focused service delivery
model. It will also provide Public Works with the ability to collocate its services in the Stiff Building. Finally it will help the City to take a planned
and efficient approach to building utilization and service optimization.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No additional operating costs anticipated for building reconfiguration.
FUNDING SOURCES
Building Inspection, Community Development, General Fund, Parking, Water
New
Replacement
Equipment
Project
FY20 FY21 FY22
61
CIP Project Fund
Parking Fund
PROJECT NUMBER
P001
DEPARTMENT
PARKING
PROJECT NAME
Willson Lot Redesign
FY18 FY19
$300,000
Unscheduled
DESCRIPTION OF PROJECT
Improve the parking lot layout, set-backs, landscaping, signage, lighting, required storm water treatment infrastructure
requirements and parking kiosk.
ALTERNATIVES CONSIDERED
Keep lot as is
ADVANTAGES OF APPROVAL
Improved functioning of parking lot
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Parking Fund and TIF Contribution
New
Replacement
Equipment
Project
FY20 FY21 FY22
62
CIP Project Fund
Parking Fund
PROJECT NUMBER
P004
DEPARTMENT
PARKING
PROJECT NAME
Surface Parking Lot Hardware & Software Systems
FY18 FY19
$15,000
Unscheduled
DESCRIPTION OF PROJECT
It is highly likely the Downtown Parking Lots will be transitioned to a fee lots. This will require the purchase and installation of
pay-and-display kiosks for each parking lot estimated to cost $60,000. The pads and vehicle protection will be installed as a part of
each surface lot’s redesign.
ALTERNATIVES CONSIDERED
Do not convert lots to pay lots; continue the current practice of permit holders and free 2-hour parking.
ADVANTAGES OF APPROVAL
Citizens using the surface lots will pay for the actual time they use the facilities. Revenue from parking charges can be used to support the
parking operations and fund additional parking assets. This equipment will improve the efficiency of parking officers monitoring parking rules in
the downtown.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minor operational costs.
FUNDING SOURCES
Parking Fund and TIF Contributions
New
Replacement
Equipment
Project
FY20
$15,000
FY21
$15,000
FY22
$15,000
63
CIP Project Fund
Parking Fund
PROJECT NUMBER
P012
DEPARTMENT
PARKING
PROJECT NAME
Armory Lot Redesign and Improvements
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
This project is scheduled after the completion of the Etha Hotel construction project. Layout, set-backs, landscaping, signage,
lighting, sidewalks, and storm water treatment facilities are being planned.
ALTERNATIVES CONSIDERED
Keep the lot as is.
ADVANTAGES OF APPROVAL
Better functioning and safer parking lot layout. Will reduce a significant amount of untreated stormwater runoff. Increased revenue and parking
asset coordination through the implementation of pay kiosks.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
New asphalt will require less maintenance, but plantings and landscaping will require additional maintenance.
FUNDING SOURCES
Parking Fund and TIF Contributions - the Etha Hotel may also help fund these improvements.
New
Replacement
Equipment
Project
FY20 FY21
$250,000
FY22
64
CIP Project Fund
Parking Fund
PROJECT NUMBER
P013
DEPARTMENT
PARKING
PROJECT NAME
Black (Carnegie) Lot Redesign & Improvements
FY18 FY19 Unscheduled
$410,000
DESCRIPTION OF PROJECT
Improve the parking lot with layout, set-backs, landscaping, signage, lighting, sidewalks, and required storm water treatment
infrastructure. This site may provide an important location for a regional underground storm water retention and treatment
system under the parking surface.
ALTERNATIVES CONSIDERED
Keep the lot as is.
ADVANTAGES OF APPROVAL
Better functioning and safer parking lot layout. Will reduce a significant amount of untreated stormwater runoff. Increased revenue and parking
asset coordination through the implementation of pay kiosks.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
New asphalt will require less maintenance, but plantings and landscaping will require additional maintenance.
FUNDING SOURCES
Parking Fund and TIF Contribution. Potential for Stormwater program funding.
New
Replacement
Equipment
Project
FY20 FY21 FY22
65
CIP Project Fund
Parking Fund
PROJECT NUMBER
P014
DEPARTMENT
PARKING
PROJECT NAME
Parking Garage Crack Maintenance and Repair
FY18
$5,000
FY19
$20,000
Unscheduled
$0
DESCRIPTION OF PROJECT
Includes laser measuring of deck gaps and routine repairs and patching of concrete deck surfaces. Structural gap repair is
anticipated every 3 years with routine caulking in between.
ALTERNATIVES CONSIDERED
Moving to an every other year gap maintenance or reducing the frequency of structural gap filling (not advised).
ADVANTAGES OF APPROVAL
Will extend the life of the parking garage deck surfaces.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Parking Fund
New
Replacement
Equipment
Project
FY20
$5,000
FY21
$5,000
FY22
$20,000
66
CIP Project Fund
Parking Fund
PROJECT NUMBER
P015
DEPARTMENT
PARKING
PROJECT NAME
Parking Garage Roof Project
FY18 FY19 Unscheduled
$400,000
DESCRIPTION OF PROJECT
Construction in the downtown core has increased demand for parking space in the Garage. The demand for additional space is
anticipated with construction projects both planned and underway. The top floor of the garage has limited use during the winter
months as snow removal is difficult due to limited clearances. Installing a roof on the top floor would allow for maximum
utilization of the garage year around.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Increased utilization of the Parking Garage in all weather conditions.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Parking Fund and TIF Contributions
New
Replacement
Equipment
Project
FY20 FY21 FY22
67
CIP Project Fund
Parking Fund
PROJECT NUMBER
P016
DEPARTMENT
PARKING
PROJECT NAME
Purchase of property for future parking facilities in the Downtown Parking District.
FY18 FY19 Unscheduled
$1,500,000
DESCRIPTION OF PROJECT
The Downtown Strategic Parking Management Plan was adopted by the Parking omission and City Commission in July 2016. The
plan outlines 26 strategies to address current and future parking issue in the Downtown. Over the next year, the Parking
Commission will be working with city staff, downtown stakeholders and the community at large on next steps based on the
adopted plan. The acquisition and construction of future parking assets (surface and structured) is a fundamental component.
Costs and locations of those needed assets are not know, but our current Black (Carnegie) Parking lot was appraised at $1.5 M in
2011.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Adequate parking resources are critical for the economic health and vibrancy of the Downtown Bozeman.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Additional lot maintenance each year/season.
FUNDING SOURCES
Parking Fund, Bonds, TIF, Loans, SID
New
Replacement
Equipment
Project
FY20 FY21 FY22
68
CIP Project Fund
Parking Fund
PROJECT NUMBER
P017
DEPARTMENT
PARKING
PROJECT NAME
Rouse Parking Lot Re-design and Improvements
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Rouse Lot Improvements – Layout, set-backs, landscaping, signage, lighting, sidewalks, and stormwater treatment facilities. These
improvements are separate from any creek restoration project and will only involve the surface lot.
ALTERNATIVES CONSIDERED
Maintain current configuration.
ADVANTAGES OF APPROVAL
Better functioning and safer parking lot layout. Increased revenue and parking asset coordination through the implementation of pay kiosks.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
New asphalt will require less maintenance, but plantings and landscaping will require additional maintenance.
FUNDING SOURCES
Parking Fund, TIF contribution for lot improvements.
New
Replacement
Equipment
Project
FY20
$280,000
FY21 FY22
69
CIP Project Fund
Parking Fund
PROJECT NUMBER
P020
DEPARTMENT
PARKING
PROJECT NAME
Parking Vehicle Leases
FY18
$10,000
FY19
$10,000
Unscheduled
DESCRIPTION OF PROJECT
In the fall of 2016, the Parking Division transitioned from utilizing old Police vehicles to leased Prius hybrids. Initial indications are
that these vehicles will work exceptionally well for parking enforcement duties and will reduce the fuel consumption and
maintenance costs when compared to the retired patrol vehicles.
ALTERNATIVES CONSIDERED
Continue to use retired patrol vehicles, lease hybrid vehicles at $280/mp. 12,000 mile annual usage. Purchase new cars.
ADVANTAGES OF APPROVAL
Low cost vehicles that are suitable for the Parking Enforcement function; re-use of police vehicles once they are no longer suitable for first-
responder use.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Anticipating maintenance requirements for used police vehicles is difficult at best as their age and condition were the primary reasons they were
replaced in the PD. Maintenance and operations for leased vehicles would be limited to oil changes and fuel costs and would be significantly
lower than the current fleet.
FUNDING SOURCES
Parking Fund
New
Replacement
Equipment
Project
FY20
$10,000
FY21
$10,000
FY22
$10,000
70
CIP Project Fund
Parking Fund
PROJECT NUMBER
P021
DEPARTMENT
PARKING
PROJECT NAME
Portable Radio Replacement
FY18 FY19
$20,000
Unscheduled
DESCRIPTION OF PROJECT
This replacement project is dependent on the technology determination for the City’s police and fire departments. We
recommend using the same platform (digital trunked) as police and fire, and the cost of the units will be similar to those specified
for that system.
ALTERNATIVES CONSIDERED
Continue the use of the current portables to the point of failure. Purchase less expensive models.
ADVANTAGES OF APPROVAL
These portable radios are the primary means of emergency communications with 9-1-1 and police units. Providing the Parking Enforcement
Officers with reliable push-to-talk communications improves safety and efficiency of staff by ensuring they are in immediate contact should they
need help themselves or need to report an emergency during their patrols.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine maintenance and battery replacements.
FUNDING SOURCES
Parking Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
71
CIP Project Fund
Parking Fund
PROJECT NUMBER
P022
DEPARTMENT
PARKING
PROJECT NAME
Parking Garage and Citation Equipment
FY18
$250,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
The parking garage equipment (barrier gates, card readers, ticket machines and pay stations) were purchased and installed in
2008. As the parking garage is not staffed, this equipment must be highly reliable and operate with limited staff intervention. Too
often breakdowns strand parking customers in the garage until the gates are forced open, driven through, or are opened manually
by staff. These malfunctions anger customers and diminish trust in the facility and of local government operations in general.
Additionally, hotels using the garage for parking are requesting equipment to provide validation tickets for their customers. Our
current system does not allow this capability in an affordable package. New technology and user interfaces will improve reliability
and customer experience and allow for increased revenue through more reliable equipment operation and enforcement. The
Parking Commission reordered the priorities previously listed in the CIP to accommodate tax increment funding and fund the
replacement of the garage equipment and citation software (thought to be a software as service purchase).
ALTERNATIVES CONSIDERED
Continue to use the current equipment and interfaces.
ADVANTAGES OF APPROVAL
Parking customers will experience improved payment options and reliability in the operation of the garage. Garage revenue will increase as the
gates will operate more regularly. Staff will spend less time repairing equipment and responding to calls for malfunctioning gates and payment
machines. Public trust in the garage and parking operations will most likely improve while equipment damage and vandalism will likely decrease.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Standard maintenance agreements
FUNDING SOURCES
Parking Fund, TIF
New
Replacement
Equipment
Project
FY20 FY21 FY22
72
CIP Project Fund
Parking Fund
PROJECT NUMBER
P023
DEPARTMENT
PARKING
PROJECT NAME
Parking Garage Security Cameras
FY18
$25,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Presently Bridger Park has two video cameras coving the exit gates on Mendenhall and Black Streets. The cameras, while high
quality, do not provide adequate security of the garage. It has been the plan to install additional cameras in key locations, but we
have been limited by the speed of our internet connection. The installation of fiber in the garage has provided the needed
bandwidth to install additional cameras to provide security on all levels and the stairwells.
ALTERNATIVES CONSIDERED
Continue to monitor only the exit gates.
ADVANTAGES OF APPROVAL
Increased security. We anticipate the installation of additional cameras will provide an important deterrence and will help the police to identify
vehicles and those who choose to commit acts of vandalism and other criminal behavior. We may also receive additional reimbursements form
the courts for damaged equipment if the parties responsible can be identified.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Maintenance for vandalized cameras and equipment.
FUNDING SOURCES
Parking Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
73