HomeMy WebLinkAbout11-28-16 CC Mtg - C3. Storm Water CIP
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Storm Water Fund Capital Improvement Plan (CIP) for
Fiscal Years 2018-2022.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 28, 2016
RECOMMENDATION: Adopt the Storm Water Fund Capital Improvement Plan (CIP)
for Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing the various parts of the plan forward as items on the Consent agenda. We
will be prepared to address questions, if they arise, at the public meeting.
The Public Works, City Manager, and other city staff met in October and November to develop
the attached Capital Plan for the equipment and capital needs of the Storm Water Fund.
Items of Note:
• STRM43 – Stormwater Digital Universal Camera – The condition assessment of our
mains is critical in determining the priority of sewer main replacement. This Digital
Universal Camera - which is a semi-autonomous, high resolution digital CCCTV side
scanning camera designed for rapid and detailed condition assessment of our wastewater
system is critical to assessing the condition of the sewer main along with the Pipeline
20
Assessment program we now use. With a goal to inspect the entire collection system once
every 5 years, this DUC will allow us to increase the amount of pipe we TV in a day up
to 5-10 times more than the traditional stop and go method that we currently use.
• STRM48 – Annual Pedestrian Ramp Replacement Program has been added to the
Stormwater Fund CIP at $100,000 per year. Costs will be split 50/50 with the Street
Maintenance Fund. Cost share is appropriate because typically pedestrian ramp
improvements also require replacement of stormwater inlets and catch basins. Having
funds available for the stormwater related costs of ramp replacement will increase the
number of ramps that can be replaced each year.
• Fiscal year 2017 revenues represent the first fiscal year where our rate-model is fully
implement for all 12 months. The changes in revenues over the past 5 years have been
driven by our implementation of the full rate model. We are basing our FY18-22 revenue
estimates on annual customer growth of 3% per year. This is similar to our most recent
Wastewater rate model. Actual revenues should grow depending on the mix of
impervious areas/existing infrastructure use as property is annexed and developed.
670 - Storm Water Amount Change
2013 $ 238,735.00 -
$-
$200,000.00
$400,000.00
$600,000.00
$800,000.00
$1,000,000.00
$1,200,000.00
$1,400,000.00
2013 2014 2015 2016 2017 - First FY
of full rate
model
Storm Water Utility Revenue
21
2014 $ 268,531.00 12.5%
2015 $ 453,483.00 68.2%
2016 $ 1,041,944.65 129.8%
2017 - First FY of full rate model $ 1,305,880.00 25.3%
Average FY13- FY17 $ 661,714.73 47.3%
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: November 17, 2016
Attached: Storm Water CIP
22
Storm Water Utility Capital Improvement PlanFinancial Summary Current YearFY17 FY18 FY19 FY20 FY21 FY22UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 489,000$ 375,901$ 332,057$ 306,398$ 299,469$ 311,832$ Plus: Storm Water Utility Fees Dedicated to Capital 588,501$ 606,156$ 624,341$ 643,071$ 662,363$ 682,234$ Less: FY16 Carryover Capital (151,600)$ Less: Scheduled CIP Project Costs (550,000)$ (650,000)$ (650,000)$ (650,000)$ (650,000)$ (650,000)$ (125,000)$ Projected Year‐End Cash Dedicated to CIP 375,901$ 332,057$ 306,398$ 299,469$ 311,832$ 344,066$ (125,000)$ Assumptions Made for Revenue Estimates: Current YearFY17 FY18 FY19 FY20 FY21 FY22Estimated Annual Storm Water Utility Revenue 1,307,780$ 1,307,780$ 1,347,013$ 1,387,424$ 1,429,047$ 1,471,918$ Estimated Annual Increase ‐ Attributed to Growth 3% 3% 3% 3% 3% Estimated Annual Increase ‐ Rate Increase 0% 0% 0% 0% 0%Total Estimated Revenues 1,307,780$ 1,347,013$ 1,387,424$ 1,429,047$ 1,471,918$ 1,516,075$ Current Revenues Dedicated to CIP % 45.0% 45.0% 45.0% 45.0% 45.0% 45.0% Plus: Increase Dedicated to Capital 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total % Dedicated to CIP 45.0% 45.0% 45.0% 45.0% 45.0% 45.0%Total Estimated Revenues Dedicated to CIP 588,501$ 606,156$ 624,341$ 643,071$ 662,363$ 682,234$ ProjectedProjected700,000600,000500,000400,000300,000200,000100,0000FY17 FY18 FY19 FY20 FY21 FY22 UnscheduledStorm Water Projects 23
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22Storm Water FundSTRM04STORMWATERANNUAL STORMWATER PIPE REHABILITATION AND DRAINAGE PROJECT DESIGN$25,000$25,000$25,000$25,000$25,000STRM10STORMWATERANNUAL STORMWATER SYSTEM ENHANCEMENT PROJECT DESIGN$25,000$25,000$25,000$25,000$25,000STRM13STORMWATERANNUAL PIPE REHABILITATIONS AND DRAINAGE PROJECTS$325,000$105,000$175,000$175,000$325,000STRM20STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ S BLACK AND E CLEVELAND$100,000STRM21STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ S BOZEMAN AND E CLEVELAND $75,000STRM26STORMWATERSTORMWATER TV VAN REFURBISHMENT$125,000STRM31STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ N 9TH AND W VILLARD$100,000STRM32STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ LANGHOR AND WESTRIDGE$75,000STRM33STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ N 11TH AND W KOCH$75,000STRM34STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ N ROUSE AND E PEACH$75,000STRM36STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ 11TH AND DICKERSON $50,000STRM37STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ WEST RIDGE$75,000STRM38STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ PEACH AND 4TH$100,000STRM39STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND BOZEMAN$75,000STRM40STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND BLACK$75,000STRM41STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND ROUSE$75,000STRM42STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MASON AND TRACY$25,00024
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22STRM43STORMWATERSTORMWATER DIGITAL UNIVERSAL CAMERA ‐ DUC$70,000STRM44STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND WILLSON$75,000STRM45STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND 3RD$75,000STRM46STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND GRAND$75,000STRM47STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ MAIN AND TRACY$75,000STRM48STORMWATERANNUAL PEDESTRIAN RAMP REPLACEMENT PROGRAM$100,000$100,000$100,000$100,000$100,000STRM49STORMWATERSTORMWATER SYSTEM ENHANCEMENT PROGRAM ‐ 11TH AND ALDERSON$50,000$650,000$650,000$650,000$650,000$650,000$125,000Summary for Storm Water Fund (24 items)Totals by year:$650,000 $650,000$650,000$125,000FY21FY22FY18UnscheduledFY20$650,000$650,000FY1925
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM04
DEPARTMENT
STORMWATER
PROJECT NAME
Annual Stormwater Pipe Rehabilitation and Drainage Project Design
FY18
$25,000
FY19
$25,000
Unscheduled
DESCRIPTION OF PROJECT
The hiring of a qualified firm to complete engineering design for scheduled pipe rehabilitation and drainage projects.
Describe the criticality (i.e., importance) of this project to the operation: Allows staff to complete projects on time by having the
discretion to assign design work to external consultants when internal engineering services are not available.
How is this project leveraged with other stakeholders/projects/funds: Design work is combined with other Public Work projects
when possible, such as road reconstructions and utility replacements.
ALTERNATIVES CONSIDERED
Internal engineering staff complete design work when available.
ADVANTAGES OF APPROVAL
Professional design and timely completion of scheduled pipe and drainage projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$25,000
FY21
$25,000
FY22
$25,000
26
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM10
DEPARTMENT
STORMWATER
PROJECT NAME
Annual Stormwater System Enhancement Project Design
FY18
$25,000
FY19
$25,000
Unscheduled
DESCRIPTION OF PROJECT
The hiring of a qualified firm to complete engineering design for scheduled system enhancement projects.
Describe the criticality (i.e., importance) of this project to the operation: Allows staff to complete projects on time by having the
discretion to assign design work to external consultants when internal engineering services are not available.
How is this project leveraged with other stakeholders/projects/funds: Design work is combined with other Public Work projects
when possible, such as road reconstructions and utility replacements.
ALTERNATIVES CONSIDERED
Internal engineering staff complete design work.
ADVANTAGES OF APPROVAL
Professional design and timely completion of scheduled system enhancement projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$25,000
FY21
$25,000
FY22
$25,000
27
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM13
DEPARTMENT
STORMWATER
PROJECT NAME
Annual Pipe Rehabilitations and Drainage Projects
FY18
$105,000
FY19
$175,000
Unscheduled
DESCRIPTION OF PROJECT
The hiring of a contractor to complete infrastructure repairs and improvement projects, increasing the stormwater system's
structural integrity and conveyance capacity.
Describe the criticality (i.e., importance) of this project to the operation: Allows staff to focus on the operation and maintenance
of the stormwater system.
How is capacity affected by this project: The capacity of the stormwater system will be increased through the upsizing of pipes.
What safety or risk measures are mitigated with this project: Decreased likelihood of road failure, flooding, environmental
degradation, and a drop in level-of-service to rate payers.
How is this project leveraged with other stakeholders/projects/funds: Funds may be saved and accumulated over a multi-year
period or joined with other water/sewer pipe rehabilitation projects. A determination on how to allocate funds will occur
annually during the CIP process.
ALTERNATIVES CONSIDERED
City staff complete pipe rehabilitation and drainage projects, reducing the resources applied towards system maintenance.
ADVANTAGES OF APPROVAL
Proactive approach to the repair and replacement of stormwater infrastructure that has or is likely to fail, increasing system efficiency and
customer service.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
N/A
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$175,000
FY21
$325,000
FY22
$325,000
28
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM20
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - S Black And E Cleveland
FY18 FY19
$100,000
Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
29
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM21
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - S Bozeman And E Cleveland
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$75,000
FY21 FY22
30
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM26
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater TV Van Refurbishment
FY18 FY19 Unscheduled
$125,000
DESCRIPTION OF PROJECT
Refurbishment of existing Stormwater TV van routinely completed every 5 years to replace worn parts and remain consistent
with new technology.
Describe the criticality (i.e., importance) of this project to the operation: This equipment is critical in assessing structural failures
in the City's underground stormwater system.
Which infrastructure assets are maintained by this equipment: Stormwater InfrastructureHow is efficiency improved with this
equipment: Allows the City to identify troubled areas and allocate resources to fix.
What is the impact (i.e., scope-of-use) for this equipment: Significantly improves operation efficiency, budget allocation, and
project planning.
What are the implications of deferring the purchase of this equipment: Existing equipment breaks down and is not functional.
ALTERNATIVES CONSIDERED
Purchase a new TV Van at an estimated cost of $250,000.
ADVANTAGES OF APPROVAL
Provides for the timely replacement of critical maintenance equipment.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Decrease in maintenance costs
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
31
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM31
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - N 9th And W Villard
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$100,000
FY21 FY22
32
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM32
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Langhor And Westridge
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$75,000
FY21 FY22
33
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM33
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - N 11th And W Koch
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
$75,000
34
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM34
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - N Rouse And E Peach
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20
$75,000
FY21 FY22
35
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM36
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - 11th and Dickerson
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
$50,000
36
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM37
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - West ridge
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21
$75,000
FY22
37
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM38
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Peach and 4th
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21
$100,000
FY22
38
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM39
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Bozeman
FY18 FY19
$75,000
Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
39
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM40
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Black
FY18 FY19
$75,000
Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
40
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM41
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Rouse
FY18 FY19
$75,000
Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
41
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM42
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Mason and Tracy
FY18
$25,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
42
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM43
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater Digital Universal Camera - DUC
FY18
$70,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Stormwater Digital Universal Camera
Describe the criticality (i.e., importance) of this project to the operation: This camera is critical to accessing the condition of the
sewer main along with the Pipeline Assessment program we use. Our goal is to inspect the entire collection system once every 5
years.
Which infrastructure assets are maintained by this equipment: The Digital Universal Camera (DUC) is a semi-autonomous, high
resolution digital CCTV side scanning camera designed for rapid and detailed condition assessment of our wastewater system.
How is efficiency improved with this equipment: This camera allows us to TV the main non-stop will allows us to increase the
amount of pipe we TV in a day up to 5 to 10 times more than the traditional stop and go method that we now use.
What are the implications of deferring the purchase of this equipment: As we gain more miles of main every year we will have to
adjust our goal of every main being televised once every five years to six or seven with the current stop and go technology we use.
How is this project leveraged with other stakeholders/projects/funds: The condition assessment of our mains is critical in
determining the priority of sewer main replacement.
ALTERNATIVES CONSIDERED
Continue to use the stop and go method (SAG) and take longer to TV the mains. We have a goal to TV the entire system every 5 years, this is
getting harder to do with the increasing growth of our collection system.
ADVANTAGES OF APPROVAL
This camera allows us to TV the main non-stop will allows us to increase the amount of pipe we TV in a day up to 5 to 10 times more than the
traditional stop and go method that we now use.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Placing electronic equipment in raw sewage is hard to predict costs I believe there will be little or no more costs than our present camera.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
43
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM44
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Willson
FY18
$75,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
44
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM45
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and 3rd
FY18
$75,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
45
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM46
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Grand
FY18
$75,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
46
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM47
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - Main and Tracy
FY18
$75,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Semi-annual maintenance completed by crews using existing equipment. The workflow includes the vacuuming and disposal of settled debris,
pollutants, and trash, which takes approx. 1-hour to complete per unit.
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
47
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM48
DEPARTMENT
STORMWATER
PROJECT NAME
Annual Pedestrian Ramp Replacement Program
FY18
$100,000
FY19
$100,000
Unscheduled
DESCRIPTION OF PROJECT
This annual program provides funding to continue upgrading pedestrian ramps to ADA compliance
How is connectivity affected by this project: A curb/pedestrian ramp provides an accessible route that people with disabilities can
use to safely transition from a roadway to a curbed sidewalk and vice versa.
What safety or risk measures are mitigated with this project: Without access to properly developed ramps onto sidewalks, people
with disabilities are forced to risk their personal safety by traveling in the street.
What regulations or standards are attained with this project: Upgrading CoB pedestrian ramps will allow the City to be in
compliance with Title II of the ADA and Section 504 of the Rehabilitation Act of 1973 (Section 504).
How is this project leveraged with other stakeholders/projects/funds: The cost of this project will be 1/2 street maintenance fund
and 1/2 stormwater fund. Cost split is appropriate because typically pedestrian ramp improvements also require replacement of
stormwater inlets and catch basins.
ALTERNATIVES CONSIDERED
Continue with existing infrastructure, and not meet current ADA regulatory standards
ADVANTAGES OF APPROVAL
Upgrading the curb ramps will increase safety for community members and visitors with disabilities.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
No additional operating costs.
FUNDING SOURCES
50% Street Maintenance Fund & 50% Stormwater Fund
New
Replacement
Equipment
Project
FY20
$100,000
FY21
$100,000
FY22
$100,000
48
CIP Project Fund
Storm Water Fund
PROJECT NUMBER
STRM49
DEPARTMENT
STORMWATER
PROJECT NAME
Stormwater System Enhancement Program - 11th and Alderson
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
Installation of an in-line stormwater sediment, trash, and oil separation unit
Describe the criticality (i.e., importance) of this project to the operation: Treatment unit is an industry standard practice and the
best suited treatment option given the drainage area's size, land use, and pollutants of concern.
What safety or risk measures are mitigated with this project: Decreased pollutant loading into Bozeman Creek, reducing liabilities
associated with environmental non-compliance, community health, and aquatic ecosystem degradation.
What regulations or standards are attained with this project: Measurable step toward the City's goal of delisting Bozeman Creek
from the Montana DEQ's list of impaired waterbodies. Also, the project will be credited under the City's MS4 Discharge Permit,
which requires the implementation of practices, programs, and technologies that reduce local waterway degradation caused by
stormwater.
ALTERNATIVES CONSIDERED
Continued discharge of untreated stormwater into Bozeman Creek.
ADVANTAGES OF APPROVAL
Provides stormwater treatment and permit compliance
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Provides stormwater treatment and permit compliance
FUNDING SOURCES
Stormwater Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
$50,000
49