HomeMy WebLinkAbout16- Change Order 1 - Knife River Belgrade - North Wallace Avenue Reconstruction ProjectDate of Issuance: October 25, 2016 Effective Date: October 25, 2016 Change Order No. 1 Project: North Wallace Avenue Owner: City of Bozeman Owner's Contract No.: N/A Reconstruction Contract: North Wallace Avenue Reconstruction Date of Contract: May 13, 2016 Contractor: Knife River - Belgrade Engineer's Project No.: 11415008.5 The Contract Documents are modified as follows upon execution of this Chanire Order: Description: Added Document — "Construction & Maintenance Agreement for a Public Sidewalk Crossing in Bozeman, MT — (DOT# 060 049X; Added 13 Calendar Days to the Contract Time Attachments (list documents supporting change): "Construction & Maintenance Agreement for a Public Sidewalk Crossing in Bozeman, MT - (DOT# 060 049A " Cover Letter supporting Contractor requested days CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: E] Working ®Calendar days Substantial completion (days or date): $ Ready for final payment (days): 150 [Increase] [Decrease] from previously approved Increase from previously approved Change Orders Change Orders No. to No. No. to No. Contract Price prior to this Change Order: [Increase] [Decrease] of this Change Order Contract Price incorporating this Change Engineer ( Date: 10 Substantial completion (days): Ready for final payment (days): N/A Contract Times prior to this Change Order: Substantial completion (days or date): Ready for final payment (days): 150 Increase of this Change Order: Substantial completion (days or date): Ready for final payment (days): 13 Contract Times with all approved Change Orders: Substantial completion (days or date): Ready for final payment (date): November 10, 2016 ACC T� ACCE D. By: By: - /L -//JJ Owner (Authorized Signature) Contractor (Authorized Signature) Date: I I- 19 - 1,6 Date: /0 Approved by Funding Agency (if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 1982 Stadium Drive Suite; Bozeman, MT 59715.0697 406 404 1849 kljeng.com October 26, 2016 Bob Murray Project Engineer City of Bozeman 20 East Olive Bozeman, MT 59715 r��. OCT 21 201 Re: 11415008.5 - North Wallace Avenue Reconstruction Mr. Murray: KKLI Please find enclosed one original signed form of Contract Change Order No. 1 for the referenced project, along with the appropriate supporting documentation. The executed MRL Agreement for the sidewalk crossing construction and maintenance was just recently received by KLJ. I'll coordinate with Chris Kukulski to determine who at the City needs the original document. Knife River has requested 33 additional contract days; however, we recommend providing 13 additional contract days as described below. Please review and sign and date this original form. Once executed, please provide one (1) copy back to KLJ, and please provide one (1) copy to Knife River - Belgrade. • (1) Day - Weather day for June 15tH • (1) Day - Sime remove/ reinstall sanitary sewer at flatter grade between Fridley and Davis due to encountered depth of some existing services. • (1) Day - Weather day for July 11tH • (1) Day - Hit unmarked gas service at Davis causing shut down. • (1) Day - NWE finishing replacement of gas main dresser joints in Davis intersection. • (1) Day - Additional work to extend curb Et gutter on Peach. • (1) Day - NWE utility conflicts at Peach and Fridley delayed installation of inlets and subgrade excavation. • (1) Day - Weather day for September 23rd • (2) Days - Stop work on retention pond causing schedule conflicts between Knife River and Sime and lost production • (1) Day - Additional utility work for replacing sanitary sewer service to 707 N. Wallace. • (2) Days - Delay in order/delivery of hydrodynamic separator due to easement negotiations and unexpected temporary opening of Tamarack intersection. <<KLI If you should have any questions or concerns, please feel free to contact me at any time. Sincerely, KLJ Shane Strong, PE Project Manager Enclosure(s): Contract Change Order No. 1 (1 -Copy) Project #: 11415008.5 cc: Mr. Rick Hixson, City Engineer (via email) Mr. Brit Fontenot, Director of Economic Development (via email) Page 2 of 2