Loading...
HomeMy WebLinkAboutBurrup Lift Station Improvement(E) GENERATOR(D) PUMP #2(D) PUMP #1(D) PRIMER PUMP #1(D) PRIMER PUMP #2(E) METER BASE& SERVICEDISCONNECTWP(E) RECEPTACLE(E) AUTOMATICTRANSFERSWITCH(E) POWERPANEL(D) CONTACTORPANEL(E) GENERATORPP-19,21,23(N) PUMP #2(N) PUMP #12(E) METER BASE& SERVICEDISCONNECT(E) AUTOMATICTRANSFERSWITCH(E) POWERPANELWP(E) RECEPTACLE7109PP-25,27,29SHEET WORK NOTESELECTRICAL CONTRACTOR TO REMOVE EXISTING WIRING ANDRACEWAY.PUMP INCLUDES 50' OF SEALED CABLE BY PUMP MANUFACTURER.ELECTRICAL CONTRACTOR TO TRIM AND TERMINATE CABLE INJUNCTION BOX UPON EXITING THE WET WELL AND TRANSITION TO 3#10& 1#10 GND IN 3/4"C TO COMBINATION STARTER. PROVIDE STRAINRELIEF FOR SEALED CABLE WITHIN WET WELL.PROVIDE WIRING AS REQUIRED BY SENSOR MANUFACTURER BETWEENNEW PLC AND SENSOR. PROVIDE SEALED CONDUIT OR CABLE WITHINWET WELL AND INCLUDE STRAIN RELIEF.PROVIDE NEW CONTROL WIRING AS REQUIRED BETWEEN PLC AND NEWCOMBINATION STARTERS.MOUNT NEW PLC IN EXISTING CONTROL ENCLOSURE. MOUNT LEVELDISPLAYS IN DOOR OF EXISTING ENCLOSURE. RECONNECT EXISTINGINPUTS AND OUTPUTS FOR A FULLY FUNCTIONAL SYSTEM.REMOVE EXISTING CONTROL WIRING BETWEEN EXISTING PLC ANDEXISTING MOTOR CONTACTORS.NEW COMBINATION STARTER. PROVIDE AND INSTALL ALLEN BRADLEY#509-BOD-A2G WITH HOA SWITCH AND NEMA 1 ENCLOSURE.INTEGRATOR TO PROVIDE & INSTALL (3) NEW NK TECHNOLOGIES#AT1-420-24L-FT CURRENT TRANSDUCERS WITHIN EACH STARTERENCLOSURE AND TIE INTO PLC FOR REAL-TIME CURRENT READOUT ATDISPLAY.FLYGT CAS II TEMPERATURE AND FLUID SENSOR PROVIDED WITH PUMPPACKAGE. CONTROLS INTEGRATOR TO INSTALL AND WIRE BACK TOCONTROL PANEL. CONDUIT & PULL STRING BY EC.240V-208V BACK/BOOST TRANSFORMER. ACME #T-1-13075, 2 PER PUMP,IN ACCORDANCE WITH MANUFACTURER'S WIRING REQUIREMENTS.SQUARE D NQOD, 225A, 240V OPEN Δ 3Ø PANEL.GENERATOR HAS BEEN FIELD MODIFIED FROM 480V WYE TO 240VOPEN Δ. RE-LABEL PER SPECIFICATIONS.1234LINE CODES(E) EXISTING ITEM TO REMAIN(D) EXISTING ITEM TO BE REMOVED(N) NEW ITEM567DIVISION OF RESPONSIBILITYTHE ELECTRICAL CONTRACTOR SHALL BE CONTRACTED UNDER THEGENERAL CONTRACTOR FOR THIS PROJECT. THE CONTROLSINTEGRATOR (IAC) SHALL BE CONTRACTED DIRECTLY WITH THE CITYOF BOZEMAN.ALL POWER WIRING, RACEWAY, AND MATERIALS, INCLUDING THE NEWMOTOR STARTERS, IS THE RESPONSBILITY OF THE ELECTRICALCONTRACTOR.ALL CONTROL WIRING AND CONTROL COMPONENTS, INCLUDING THENEW PLC AND ALL NEW SENSORS, ARE THE RESPONSIBILITY OF THECONTROLS INTEGRATOR.ALL RACEWAY FOR CONTROL WIRING AND CONTROL COMPONENTS,ALONG WITH A PRE-INSTALLED NYLON PULL STRING, IS THERESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. EC SHALLCOORDINATE DIRECTLY WITH THE CONTROLS INTEGRATOR TODETERMINE SCOPE OF WORK.1.2.3.4.891011(E)POWERPANEL(D)CONTACTORPANEL(E)CONTROLPANELTO NORTHWESTERNENERGY OVERHEADPOWER POLE(D)PUMP#15HP240V,3PH(D)PRIMERPUMP#11/2HP120V,1PH(D)PUMP#25HP240V,3PH(D)PRIMERPUMP#21/2HP120V,1PH(N)PUMP#15HP208V,3PH(N)PUMP#25HP208V,3PH(D)FLOATSWITCH(N)SUBMERS-IBLELEVELSENSOR#113265(E) AUTOMATICTRANSFER SWITCH(E) 30KW DIESELGENERATOR473#10 & 1#10 GND - 3/4"C(N)SUBMERS-IBLELEVELSENSOR#281093#10 & 1#10GND - 3/4"C11ELECTRICAL SPECIFICATIONSGENERAL:1.THE ENTIRE INSTALLATION SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE (2014).2.THE ELECTRICAL CONTRACDTOR SHALL BE RESPONSIBLE FOR OBTAINING AN ELECTRICALPERMIT AND SCHEDULING REQUIRED INSPECTIONS.3.PROVIDE SHOP DRAWINGS FOR CONTROL PANEL, ALARM MONITOR PANEL, AND ASSOCIATEDELECTRICAL COMPONENTS. SHOP DRAWINGS SHALL INCLUDE A DETAILED MATERIALS LIST,PRODUCT DATA CUT SHEETS, PRODUCT INSTALLATION MANUALS, AND DETAILED WIRINGDIAGRAMS SPECIFIC TO THIS PROJECT.4.PROVIDE OPERATION AND MAINTENANCE MANUALS IN PDF FORMAT AND (5) HARD COPIES INTHREE RING BINDERS. MANUAL SHALL INCLUDE DETAILED PROGRAMMING AND OPERATINGINSTRUCTIONS, REPAIR AND TROUBLESHOOTING MANUAL AND RECOMMENDEDMAINTENANCE PROCEDURES.5.ALL WIRING SHALL BE COPPER. CONCEAL ALL LINE VOLTAGE WIRING IN RIGID STEELCONDUIT.DESCRIPTION OF WORK:1.REPLACE THE EXISTING PROGRAMMABLE LOGIC CONTROLLER (PLC) TO CITY OFBOZEMAN STANDARDS (MICROLOGIX 1400).2.INSTALL REDUNDANT ULTRASONIC LEVEL TRANSMITTERS AND DISPLAYS, CONNECTED TONEW PLC, WITH DISPLAYS MOUNTED TO FACE OF EXISTING NEMA 1 CONTROL ENCLOSURE.3.PROVIDE NEW POWER CIRCUITS FROM EXISTING PANELS TO NEW SUBMERSIBLE PUMPS.4.RE-INTEGRATE AND PROGRAM CONTROL SYSTEM WITH NEW COMPONENTS.5.PROVIDE OPERATION & MAINTENANCE (O&M) MANUALS TO CITY OF BOZEMAN.QUALIFICATIONS:1.THE SELECTED ELECTRICAL CONTRACTOR SHALL SUBCONTRACT A SYSTEMS INTEGRATOR[INDUSTRIAL AUTOMATION CONTROL (IAC) OR EQUAL AS APPROVED] WHO HAS AT LEAST FIVEYEARS EXPERIENCE IN FURNISHING AND PROGRAMMING SIMILAR MICROCOMPUTER BASEDCONTROL SYSTEMS.PROGAMMABLE LOGIC CONTROLLER:1.ALLEN BRADLEY MICROLOGIX 1400 -1766-L32AWAA OR EQUAL AS APPROVED.SUBMERSIBLE LEVEL SENSORS:1.REDUNDANT KPSI MODEL 750 OR EQUAL AS APPROVED.LEVEL DISPLAY:1.REDLION PAXD0000 OR EQUAL AS APPROVED.TRAINING:1.PROVIDE 2 HOURS OF ONSITE OWNER TRAINING FOR NEW SYSTEM COMPONENTS.IDENTIFICATION:1.ALL COMPONENTS ASSOCIATED WITH THE 240V OPEN Δ 3Ø POWER DISTRIBUTION SHALL BELABELED IN ACCORDANCE WITH NEC ARTICLES 110.15, 230.56, AND 408.3.DRAWN BY |REVISIONS©| ALL RIGHTS RESERVED®BURRUP LIFT STATION CITY OF BOZEMAN BOZEMAN, MONTANARECORDDOCUMENTS2.19.201620162E1ELECTRICAL DEMO PLAN 1/4"=1'-0"3E1ELECTRICAL NEW WORK PLAN 1/4"=1'-0"1E1ONE-LINE DIAGRAM NOT TO SCALEL:\COB\BLSI\BIMCAD\Elec\COSIE1.dwgE1ELECTRICALPLANS &SPECIFICATIONSMOORE1. ADDENDUM #1 5.11.2016PROFESSIONAL ENGI N EER MONTANAANDREW S.MOORENo. 38404PELICENSED INDEX OF DRAWINGS P R O J E C T D R A W I N G S ENGINEERING TEAM Advanced Engineering and Environmental Services, Inc. 300 15th St S Ste 7 Great Falls, MT 59405 (t) 406-268-0626 (f) 406-268-0628 www.ae2s.comFile: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Cover Sheet.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 1:40:21 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: AE2S 34x22PREPARED FOR: CITY OF BOZEMAN P R O J E C T D R A W I N G S I & C TEAM ROSS HANSON: 406-268-0626 JASON SALBER: 701-364-9111 BOZEMAN BURRUP LIFT STATION SCADA SYSTEM City Project No.: AE2S Project No.: JULY 2016 P05097-2016-000 000-00 00 01 99 DMC PGM JAS DWG DESCRIPTION G1 COVER SHEET E1 CONTROL PANEL LAYOUT - CP100 E2 CONTROL PANEL CP100 TERMINAL LAYOUT E3 CP100 120VAC DISTRIBUTION SCHEMATIC E4 BURRUP LIFT STATION IO LAYOUT E5 BURRUP LIFT STATION IO LAYOUT E6 MINICAS WIRING DETAIL E7 CONTROL PANEL LAYOUT - CP101 E8 CONTROL PANEL CP101 TERMINAL LAYOUT E9 CP101 120VAC MOTOR CONTROL SCHEMATICS E10 CP101 240VAC MOTOR STARTER SCHEMATICS RECORD DRAWINGS 9/19/16 30507090110130140 +--JUMP: 15VOPEN: 12-15V +--JUMP: 15VOPEN: 12-15VSOLAFile: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Control Panel.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:54:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: PLAN1SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCONTROL PANEL LAYOUT - CP100E1 1 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 LEVEL 1 LT1 LEVEL 2 LT2 RESET PB1 DATARADIO INTEGRA-TR MICROLOGIX 1400 PLC12VDC POWER SUPPLY 120VAC POWER DISTRIBUTION TERMINALS I/O TERMINALS 24VDC POWER SUPPLY TS1 MINICAS 2x2 2x2 2x2 2x2 2x2 2x2 2x2 1 E1 CONTROL PANEL LAYOUT - CP100 04"2"1' PANEL FRONT VIEW PANEL INTERIOR VIEW32''29''12''22''19''36''30'' SW1 SURGE SUPRESSOR UNINTERRUPTIBLE POWER SUPPLY RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Control Panel.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:54:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: PLAN2SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCONTROL PANEL CP100 TERMINAL LAYOUTE2 2 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 X-PLC 5A 120 VAC#1 120 VAC#1 120 VAC#2 120 VAC SPARE N1 X-UPS N-UPS N-UPS X-PLC X-10 X-10 GND GND GND 120VAC POWER DISTRIBUTION X-10 5A O:0.0/0 P1_ COIL O:0.0/1 P2_ COIL O:0.0 /2 SPARE O:0.0 /3 SPARE O:0.0 /4 SPARE O:0.0 /5 SPARE O:0.0 /6 SPARE O:0.0 /7 SPARE O:0.0 /8 SPARE O:0.0 /9 SPARE IN0 PUMP1AUTO PUMP2FAULT INTRUALARM LOWTEMP HILEVEL I:1.1+LT2 I:1.1-LT2 SHIELD I:1.0+LT1 I:1.0-LT1 SHIELD I:1.2+P1_CURRENT I:2.0/1GEN_FLT I:2.0/3GEN_PWR I:2.0/5SPARE I:2.0/7SPARE I:1.0+LT1 I:1.0-LT1 SHIELD LOWLEVEL GENFAULT GENRUN UTILPWR I/O TERMINALS CR3 CR2 CR1 X-UPS X-UPS F-CR1 F-CR2 PUMP1SEALFAIL PUMP1TEMP PUMP2SEALFAIL PUMP2TEMP FAULTRESET I:1.2-P1_CURRENT I:1.3+P2_CURRENT I:1.3-P2_CURRENT I:1.2+P1_CURRENT I:1.2-P1_CURRENT I:0.0/15P2_SF GENPWR RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGSN1 N1 N1 X-UPS GND GND IN1 IN2 IN3 IN4 IN5 IN6 IN7 IN8 IN9 IN10IN11IN12IN13IN14IN15IN16IN17IN18 120VACGOOD PUMP1RUN PUMP1FAULT X-UPS SPARESPARE PUMP2RUN PUMP2AUTO INTRUBYPASS SPARE PUMP1AUTO PUMP2FAULT INTRUALARM LOWTEMP HILEVEL PUMP1SEALFAIL PUMP1TEMP PUMP2SEALFAIL PUMP2TEMPFAULTRESET 120VACGOOD PUMP1RUN PUMP1FAULTSPARESPARE PUMP2RUN PUMP2AUTO INTRUBYPASS SPARE X-UPS LOWLEVEL GENFAULT GENRUN UTILPWR GENPWR File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Various Schematics.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:53:49 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG3SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCP100 120VAC DISTRIBUTION SCHEMATICE3 3 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 120 VAC1 1 L G N BATTERY POWERED BACKUP 2 L G N 3 L G N 4 L G N 120 VAC IN N IN GND N N X-UPS X-PLC 120 VAC 1 20 POWER DISTRIBUTION PANEL 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 X-PLC L1 L +24VDC N -24VDC GND ALLEN-BRADLEY 24VDC 1606-XLP50E NEUT GND MICROLIGIX 1400 PLC N-UPS TO ANALOG INPUTS 1762-IF4 SEE SHEET E5 120 VAC2 N L +12VDC N -12VDC GND ALLEN-BRADLEY 12VDC 1606-XLP50B +-DATA RADIO INTEGRA-TR RADIO POWER DISTRIBUTION PANEL X-10 5 X-10 TO PLC INPUTS 1766-L32AWA SEE SHEET E4 X-10 CP100 TO MOTOR CONTROL CIRCUITS CP101 +- NO OPTEX DX-40 INTRUSION SENSOR C A1 A2 14 12 INTRUSION SENSOR COIL X-10 X-10 I:0.0/9 I:0.0/0 INTRUSION SENSOR ZS1 CONTINUED FROM RUNG 24 CONTINUE ON RUNG 38 CONTINUE ON RUNG 38 CONTINUED FROM RUNG 8 CONTINUED FROM RUNG 8 1 2LEVEL 1 DISPLAY 1 2LEVEL 2 DISPLAY DP5P0000 DP5P0000 L1 LINE L1 LOAD N LINE N LOAD SOLA SURGE SUPPRESSOR STV25K-10S GND SRG1 TO PLC INPUTS 1762-1A8 SEE SHEET E5 TO PLC OUTPUTS 1766-L32AWA SEE SHEET E4 MC1 MC2 UPS1 CYBERPOWER EC550G LOCATED ON PANEL DOOR CR3 CONTINUE ON RUNG 25 CONTINUE ON RUNG 25 CONTINUED FROM RUNG 24 X-PLC RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS COM 0 IN 0 IN 1 IN 2 IN 3 COM 1 IN 4 IN 5 IN 6 IN 7 COM 2 IN 8 IN 9 IN 10 IN 11 COM 3 IN 12 IN 13 IN 14 IN 15 IN 16 IN 17 IN 18 IN 19 VAC L1 VAC L2/N GND VAC DC0 OUT 0 VAC DC1 OUT 1 VAC DC5 OUT 6 OUT 7VAC DC2 OUT 2 VAC DC3 OUT 3 VAC DC4 OUT 4 OUT 5 VAC DC6 OUT 8 OUT 9 OUT 10 OUT 11 X-PLC N-UPS M1 M2 PUMP 1 RUNCOMMANDX-UPS P1_AUXP1_FLTP2_AUXP2_FLTZS1TS1EMG_HI_LVLPUMP 1 MOTOR RUNNINGPUMP 1 MOTOR SAVERPUMP 1 HOA IN AUTOPUMP 2 MOTOR RUNNINGPUMP 2 MOTOR SAVERPUMP 2 HOA IN AUTOINTRUSION ALARMINTRUSION BYPASS SWITCHLOW TEMPERATURE ALARMEMERGENCY HIGHLEVEL SWITCHO:0.0/0 O:0.0/1 O:0.0/2 O:0.0/3 O:0.0/4 O:0.0/5 O:0.0/6 O:0.0/7 O:0.0/8 O:0.0/9 O:0.0/10 O:0.0/11 I:0.0/1I:0.0/0 I:0.0/2 I:0.0/3 I:0.0/4 I:0.0/5 I:0.0/6 I:0.0/7 I:0.0/8 I:0.0/9 I:0.0/10 I:0.0/11 I:0.0/12 I:0.0/13 I:0.0/14 I:0.0/15 I:0.0/16 I:0.0/17 I:0.0/18 I:0.0/19 MICROLOGIX 1400 PLC 1766-L32AWASS1SS2SW1 P1_COILP2_COILNOTE 1 NOTE 1 NOTE 2 PUMP 2 RUNCOMMAND120VAC GOODP1_SFP1_TEMPP2_SFP2_TEMPPUMP 1 SEAL FAILURE(MINICAS)PB1PUMP 1 TEMPERATURE(MINICAS)PUMP 2 SEAL FAILURE(MINICAS)PUMP 2 TEMPERATURE(MINICAS)FAULT RESET PUSHBUTTONCR3N-UPS X-10 N CR2F-CR2CR1F-CR1File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-IO Layout.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:48:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG4SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMBURRUP LIFT STATION IO LAYOUTE4 4 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 GENERAL NOTES 1.DEVICES LOCATED IN CP101. 2.DOOR MOUNTED - NO MOTION SENSOR. 1 E4 BURRUP LIFT STATION SCADA SYSTEM MICROLOGIX 1400 PLC WIRING DETAIL RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS 1762-IF4 ANALOG INPUT IN 0(+) IN 0(-) I/O TBS I:1.0- RACK 0 SLOT 1 I:1.0+ SHIELD - + LEVEL 1 TRANSMITTER LT1 IN 1(+) IN 1(-) I:1.1- I:1.1+ SHIELD - + LT2 IN 2(+) IN 2(-) I:1.2- I:1.2+ SHIELD - + PUMP 1 CURRENT TRANSMITTER P1_CURRENT IN 3(+) IN 3(-) I:1.3- I:1.3+ SHIELD - + PUMP 2 CURRENT TRANSMITTER P2_CURRENT LEVEL 2 TRANSMITTER LEVEL 1 LEVEL 2 PUMP 1 CURRENT PUMP 2 CURRENT COM COM 5 4 1 2 LEVEL 2 DISPLAY 5 4 1 2 LEVEL 1 DISPLAY DP5P0000 KPSI 750 DP5P0000 KPSI 750 AT1-420-24L-FT AT1-420-24L-FT X-UPS N-UPS +24VDC -24VDC 1762-IA8 DISCRETE INPUT IN 0 IN 1 I/O TBS I:2.0/0 RACK 0 SLOT 2 I:2.0/1 EMERGENCY LOW LEVEL SWITCH GENERATOR FAULT GENERATOR RUN ON UTILITY POWER AC COM AC COM IN 2I:2.0/2 IN 3I:2.0/3 IN 4I:2.0/4 IN 5I:2.0/5 IN 6I:2.0/6 IN 7I:2.0/7 X-UPS X-UPS EMG_LO_LVL GEN_FLT GEN_RUN UTL_PWR GEN_PWR ON GENERATOR POWER N-UPS N X-10 X-10 X-10 X-10 X-10 File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-IO Layout.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:48:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG5SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMBURRUP LIFT STATION IO LAYOUTE5 5 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-One-line Diagrams.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:51:14 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG6SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMMINICAS WIRING DETAILE6 6 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 X-UPS N-UPS 6 10 1 4 3 MC1 I:0/13 11 8 9 I:0/14 PUMP 1 TEMPERATURE PUMP 1 SEAL FAILURE CR1 TEMP INTRLK TEMP ALARM LEAKAGE ALARM LEAKAGE INTRLK SEE SHEET E4 FLYGT MINICAS 120 PUMP 1 (SUPPLIED BY OTHERS) 6 10 1 4 3 MC2 I:0/15 11 8 9 I:0/16 PUMP 2 TEMPERATURE PUMP 2 SEAL FAILURE CR2 TEMP INTRLK TEMP ALARM LEAKAGE ALARM LEAKAGE INTRLK SEE SHEET E9 FOR CONTACT CONNECTION FLYGT MINICAS 120 PUMP 2 (SUPPLIED BY OTHERS) SEE SHEET E9 FOR CONTACT CONNECTION X-UPS N-UPS SEE SHEET E4 N-UPSX-UPS RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS7 5 BROWN T1 BLUE T2 7 5 BROWN T1 BLUE T2 File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Control Panel.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:54:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: PLAN7SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCONTROL PANEL LAYOUT - CP101E7 7 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 PUMP 2 PUMP 1 MOTOR SAVER 1 E7 CONTROL PANEL LAYOUT - CP101 04"2"1' PANEL FRONT VIEW PANEL INTERIOR VIEW26''22.5''30''24'' PUMP 1 PUMP 2 MOTOR SAVER PUMP 1 FUSE BLOCK PUMP 1 MOTOR STARTER PUMP 2 FUSE BLOCK PUMP 2 MOTOR STARTER PUMP 1 MOTOR TERMINALS PUMP 2 MOTOR TERMINALS PUMP CONTROL TERMINALS RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Control Panel.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:54:00 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: PLAN8SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCONTROL PANEL CP101 TERMINAL LAYOUTE8 8 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 X-UPSCP100 PUMP CONTROL TERMINALS T1 X-UPS CP100 X-10 CP100 X-10CP100 X-10 CP100 X-10 CP100 NCP100 N CP100 O:0.0 /0P1_COIL I:0.0/5P1_ AUTOI:0.0/3 P1_AUX I:0.0 /4P1_ FLT O:0.0/1 P2_COILI:0.0 /8P2_AUTO I:0.0/6P2_ AUXI:0.0/7 P2_FLT CR1 COMCP100 T2 T3 T1 T2 T3 PUMP 1 MOTOR TERMINALS PUMP 2 CR1AUX CP100 CR2 COMCP100 CR2AUXCP100 I:1.2 + I:1.2- I:1.3+ I:1.3 - RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Various Schematics.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:53:49 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG9SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCP101 120VAC MOTOR CONTROL SCHEMATICSE9 9 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 CP100 X-UPS OFF HANDAUTO I:0.0/5 P1_AUTO I:0.0/6 P1_AUTO I:0.0/6 P1_AUTO I:0.0/3 P1_AUX I:0.0/4 P1_AUX I:0.0/4 P1_AUX3M1 AUX2 I:0.0/4 P1_FLT I:0.0/5 P1_FLT I:0.0/5 P1_FLT SYCOM MODEL 601 MOTOR SAVER O:0.0/0 P1_COIL P1_COIL O:0.0/0 O:0.0/0 P1_COIL CP100 M1 R/C OL CP100 N N CP100 I:0.0/8 P2_AUTO I:0.0/9 P2_AUTO I:0.0/9 P2_AUTO I:0.0/6 P2_AUX I:0.0/7 P2_AUX I:0.0/7 P2_AUX3M2 AUX2 I:0.0/7 P2_FLT I:0.0/8 P2_FLT I:0.0/8 P2_FLT SYCOM MODEL 601 MOTOR SAVER O:0.0/1 P2_COIL P2_COIL O:0.0/1 O:0.0/1 P2_COIL CP100 M2 R/C OLPUMP 2PUMP 1 PUMP 1 PUMP 2 CR1 CP100 X-10 X-10 CP100 X-UPS X-10 CONTINUE ON RUNG 25 OFF HANDAUTO CONTINUED FROM RUNG 16 CONTINUED FROM RUNG 16 CONTINUE ON RUNG 25 X-UPS CP100 CR1 COM CP100 CR1 COM CR1 AUX CR1 AUX CP100 CR1 CP100 CR2 COM CP100 CR2 COM CR2 AUX CR2 AUX CP100 NOC NOC RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS File: \\AE2S.com\ProjectFiles\Bozeman\05097-2016-000\CAD Dwgs\06-Electrical\Autocad\Plan Sheets\E-Various Schematics.dwgLast Saved: By: Peter Manfredini Date: Monday, September 19, 2016 12:53:49 PMPlotted: By: Peter Manfredini Date: Monday, September 19, 2016Layout: DIAG10SYMDATEDESCRIPTIONAPPRSHEET PROJECT NUMBER CHECKED / APPROVED DATE DRAWING TYPE PREPARED BY of / PROJECT NO. CLIENT DRAWING DMC 000-00P05097-2016-000 JULY 2016 JAS PGM CONSTRBOZEMAN, MONTANACITY OF BOZEMANBOZEMAN BURRUP LIFT STATION SCADA SYSTEMCP101 240VAC MOTOR STARTER SCHEMATICSE10 10 Advanced Engineering and Environmental Services, Inc. l 300 15th St S Ste 7 Great Falls, MT 59405 l (t) 406-268-0626 (f) 406-268-0628 l www.ae2s.com 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 240VAC DISTRIBUTION PANEL L1 L1 L2 L2 L3 L3 30A FUSE BLOCK P/N LR25030-3 L1 L2 L3 NO C MOTOR STARTER 509-BOD L1 T1 L2 T2 L3 T3 2 3AUX 5 PUMP 1 M1 T2 T1 T3 I:0.0/3 P1_AUX X-UPS CP100 I:0.0/4 P1_FLT 30A FUSE BLOCK P/N LR20530-3 L1 L2 L3 NO C MOTOR STARTER 509-BOD L1 T1 L2 T2 L3 T3 2 3AUX 5 PUMP 2 M2 T2 T1 T3 I:0.0/6 P1_AUX X-UPS CP100 I:0.0/7 P1_FLT SYMCOM MODEL 601 MOTOR SAVER SYMCOM MODEL 601 MOTOR SAVER SEE SHEET E9 SEE SHEET E9 +- I:1.3- I:1.3+ CP100 +- I:1.2- I:1.2+ CP100 CURRENT TRANSDUCER P/N: AT1-420-24L-FT CURRENT TRANSDUCER P/N: AT1-420-24L-FT 30A DISCONNECT P/N N3303-05 30A DISCONNECT P/N N3303-05 SEE SHEET E5 SEE SHEET E5 EXTERNALLY MOUNTED EXTERNALLY MOUNTED RECORD DRAWINGS 9/19/16 9/19/16RECORD DRAWINGS