Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Anna Rosenberry, Administrative Services Director
SUBJECT: Adopt the Tree Maintenance Fund Capital Improvement Plan (CIP)
for Fiscal Years 2018-2022.
AGENDA ITEM TYPE: Consent
MEETING DATE: November 21, 2016
RECOMMENDATION: Adopt the Tree Maintenance Fund Capital Improvement Plan
(CIP) for Fiscal Years 2018-2022.
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. Similar to recent years
past, we are bringing various parts of the plan forward as items on the Consent agenda. We will
be prepared to address questions, if they arise, at the public meeting.
The Forestry Department, City Manager, and other city staff met in October to develop the
attached Capital Plan for the equipment and capital needs of the Tree Maintenance Fund.
Item of Note:
• FOR13 – Aerial Bucket Truck Replacement, this is a new item on the schedule this
year. For funding reasons, we have placed the item in the “unscheduled” column. It is
likely that enough funding will be available in FY24 for the replacement, if cash is
accumulated.
70
• Revenues for the Fund: This fund benefits from increases in the Tree Maintenance
Assessment, which is 100% dedicated to funding the Forestry operation. This CIP
contains more, on average, in capital costs than we have seen in the past. Without a
significant increase in annexed property, we will need to increase the Tree Maintenance
Assessment 1.5% each year for the next 5 years to fund this capital plan, and then
pending replacement of the Aerial Bucket Truck.
UNRESOLVED ISSUES: None.
ALTERNATIVES: As suggested by the City Commission. If the Commission does not
wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY18.
Report compiled on: October 31, 2016
Attached: Tree Maintenance Fund CIP
71
Tree Maintenance Fund Capital Improvement PlanFinancial Summary Current YearFY17 FY18 FY19 FY20 FY21 FY22UNSCHEDULEDProjected Beginning Reserve Balance Dedicated to CIP 159,000$ 50,663$ 29,568$ (30,101)$ (3,161)$ 61,578$ ‐$ Plus: Tree Mtc Revenues Dedicated to CIP 26,663$ 35,906$ 45,331$ 54,941$ 64,739$ 74,727$ ‐$ Less: Scheduled CIP Project Costs (135,000)$ (57,000)$ (105,000)$ (28,000)$ ‐$ (210,000)$ Projected Year‐End Cash Dedicated to CIP 50,663$ 29,568$ (30,101)$ (3,161)$ 61,578$ 136,305$ (210,000)$ Assumptions Made for Revenue Estimates: Current YearFY17 FY18 FY19 FY20 FY21 FY22Estimated Annual Tree Mtc Revenues 592,500$ 592,500$ 598,425$ 604,409$ 610,453$ 616,558$ Estimated Annual Increase ‐ Attributed to Annexations 1% 1% 1% 1% 1%Total Estimated Revenues 592,500$ 598,425$ 604,409$ 610,453$ 616,558$ 622,723$ Current Revenues Dedicated to CIP % 3.2% 4.5% 6.0% 7.5% 9.0% 10.5% Plus: Increase Dedicated to CIP 1.3% 1.5% 1.5% 1.5% 1.5% 1.5% Total % Dedicated to CIP 4.5% 6.0% 7.5% 9.0% 10.5% 12.0%Total Estimated Revenues Dedicated to CIP 26,663$ 35,906$ 45,331$ 54,941$ 64,739$ 74,727$ ProjectedProjectedCURRENT250,000200,000150,000100,00050,0000Tree Maintenance Projects & Equipment72
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEUnscheduledFY21FY18FY19FY20FY22Tree Maintenance DistrictFOR07FORESTRYFORESTRY VEHICLE REPLACEMENTS$28,000FOR10FORESTRYSTUMP GRINDER$24,000FOR11FORESTRYLOG LOADER & TRUCK$105,000FOR12FORESTRYVEHICLE FOR FORESTRY SUPERINTENDENT$33,000FOR13FORESTRYAERIAL LIFT / BUCKLET TRUCK$210,000$57,000$105,000$28,000$210,000Summary for Tree Maintenance District (5 items)Totals by year:$57,000$210,000FY21FY22FY18UnscheduledFY20$28,000$105,000FY1973
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR07
DEPARTMENT
FORESTRY
PROJECT NAME
Forestry Vehicle Replacements
FY18 FY19 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace a 1999 Ford 1/2 ton pickup truck. #2728 has 95,000 miles and the clutch needs replacement.
ALTERNATIVES CONSIDERED
Continue to use and repair existing vehicle. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this pickup will provide the Forestry division with more reliable truck, improve safety, lower exhaust emissions, tow trailers with its
tow package, and work as needed.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Operating costs (maintenance and fuel/oil) of a newer vehicle are expected to be lower.
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY20
$28,000
FY21 FY22
74
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR10
DEPARTMENT
FORESTRY
PROJECT NAME
STUMP GRINDER
FY18
$24,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
This is a request to replace a 1996 Vermeer stump grinder. This would be a scheduled replacement of an department forestry
equipment that is nearing 20 years of age. Forestry needs a larger, and more modern stump grinder. Additional info: #2671 –
1996 Vermeer 630B Stump Grinder
350 Hours Replace All Wiring Replace Cutter Belts
ALTERNATIVES CONSIDERED
Continue to use existing equipment. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this equipment will provide the Forestry division with an larger and more reliable piece of equipment. Also it will improve
productivity and will be safer for the operator. Trade in on new purchase or put in public auction.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance and upkeep.
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
75
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR11
DEPARTMENT
FORESTRY
PROJECT NAME
LOG LOADER & TRUCK
FY18 FY19
$105,000
Unscheduled
DESCRIPTION OF PROJECT
This a request to replace a 2001 Ford F650. Forestry is moving up an unscheduled request to FY19. This piece of Forestry
equipment is both unsafe and impractical. Additional info: #3125 – 2001 Ford F650, National Crane N50, Palift Hydraulic Dump,
10,000 miles/1100 hours. Hydroboost Brake System Repairs, Leaky Rear Seals, transmission slip, GVWR 26000 Max – 24500 lbs.
empty. Not True Forestry style Equipment.
ALTERNATIVES CONSIDERED
Continue to use existing vehicle. As directed by Commission.
ADVANTAGES OF APPROVAL
Replacing this Forestry equipment will provide better production and improved safety to the operator. This truck and crane was pieced
together and is over its safe gvwr nearly empty. Replace for a true urban Forestry log and brush loader. Trade in or public auction the whole
thing. No other City department can use it or any part of it.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
76
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR12
DEPARTMENT
FORESTRY
PROJECT NAME
Vehicle for Forestry Superintendent
FY18
$33,000
FY19 Unscheduled
DESCRIPTION OF PROJECT
½ Ton pickup or suv for the Forestry superintendent. New position added in FY17 in support of the Urban Forestry
Management Plan.
ALTERNATIVES CONSIDERED
Lease or purchase Toyota Prius hybrid
ADVANTAGES OF APPROVAL
As described in the Urban Forestry Plan.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Normal maintenance and upkeep.
FUNDING SOURCES
100% Tree Maintenance District
New
Replacement
Equipment
Project
FY20 FY21 FY22
77
CIP Project Fund
Tree Maintenance District
PROJECT NUMBER
FOR13
DEPARTMENT
FORESTRY
PROJECT NAME
Aerial Lift / Bucket Truck
FY18 FY19 Unscheduled
$210,000
DESCRIPTION OF PROJECT
Replace 2001 #3069 C7500 HI-Ranger bucket truck. This Forestry equipment is nearing its 20 year anniversary. 11,000
miles/4,000 hours. This truck has been the main workhorse for the division and is showing its wear. Replacement would give us a
modern truck with a higher working height and new safety items.
ALTERNATIVES CONSIDERED
Continue to use existing vehicle. As directed by the commission.
ADVANTAGES OF APPROVAL
Replacement of this equipment provides the division with a more reliable bucket truck. Improves operator safety, lowers exhaust emissions, and
gives us the overall working height we need for the City's largest trees. Sell by public auction the existing bucket truck.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
100% Tree Maintenance District Fund
New
Replacement
Equipment
Project
FY20 FY21 FY22
78