Loading...
HomeMy WebLinkAbout11-14-16 CC Mtg - C6. Resolution 4747, Knife River CO1 for North Wallace Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Resolution 4747 authorizing Change Order No. 1 to the North Wallace Avenue Reconstruction Project. MEETING DATE: November 14, 2016 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 4747 authorizing Change Order No. 1 to the North Wallace Avenue Reconstruction Project. BACKGROUND: Attached is a copy of resolution 4747 and change order number 1 for the above referenced project. During the course of the project, a number of items have come up which have delayed the contractor. They are not requesting any change in contract price for these items, only an extension in contract time. The contractor requested an additional 33 days, but agreed to and additional 13 after negotiations with the engineer on the project. A description of the reason for each of the additional days is included in the cover letter attached to the change order. The final recommended change in time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: None Attachments: Resolution No 4747, Change Order No 1 Report compiled on: 11/2/16 93 1 of 2 COMMISSION RESOLUTION NO. 4747 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH KNIFE RIVER BELGRADE, BELGRADE, MONTANA. WHEREAS, the City Commission did, on the 11th day of April 2016, authorize award of the bid for the City of Bozeman North Wallace Avenue Reconstruction project, to Knife River Belgrade, Belgrade, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Knife River Belgrade, as contained in Change Order No. 1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 94 Resolution No. 4747, Change Order 1 for North Wallace Avenue Reconstruction 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 14th day of November, 2016. __________________________________________ CARSON TAYLOR Mayor ATTEST: ________________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 95 96 97 98