HomeMy WebLinkAbout11-10-16 Bozeman Parking Commission Exhibit 2 - CIP 18-22 CIP FINAL
Page 1
Parking Commission Mémorandum
REPORT TO: Bozeman Parking Commission
FROM: Chuck Winn, Assistant City Manager
SUBJECT: Parking Commission Review of Proposed FY18-22 Capital Improvements
Plan.
MEETING DATE: November 10, 2016
AGENDA ITEM TYPE: Action
RECOMMENDATION: Review the draft FY18-22 Capital Improvement Plan and recommend
approval to the Bozeman City Commission.
PROPOSED MOTION: Having reviewed the proposed FY18-20 Draft Capital Improvement Plan, I hereby move to recommend approval to the Bozeman City Commission.
BACKGROUND: In December of each year, the Bozeman City Commission considers draft Capital
Improvement Plans (CIP’s) for each of the City’s major funds. The CIP’s are five-year plans that identify any planned expenditure of $10,000 or greater, that results in the acquisition of an asset with a useful
life of 1 year or more. CIP’s are critical planning documents and help to properly preserve, maintain,
and improve a community’s stock of buildings, streets, parks, water and sewer lines, and equipment.
Planning for these capital improvements is a matter of prudent financial management, as well as sound
development practice.
The CIP is prepared, reviewed and adopted annually because we know circumstances and priorities
change in our rapidly growing community.
Parking Fund: One of the major objectives of the Parking Commission and a primary focus of the previously adopted CIP’s has been to reconfigure and improve the four surface lots downtown. Planned
improvements to the lots include enhanced traffic flow, landscaping, stormwater treatment, and facility
improvements to provide future pay-on-foot kiosks. Sanderson/Stewart Engineers was hired and
completed their plan December 2015. The North Willson lot improvement was scheduled in the CIP for
FY16 but did occur due to the 5 West project. The Armory lot was scheduled for FY17 but did not occur due to the planned construction of The Etha. It is important to note that while the planned improvements
will enhance the visual appeal and provide additional landscaping and stormwater treatment, they will
result in fewer parking spaces.
Downtown Tax Increment Financing District (TIF): In FY2015 and FY2016 the TIF approved $250,000 for downtown parking lot reconstruction; none of those funds were spent as the proposed parking lot
Page 2
improvements were deferred both years. The FY2017 TIF Budget includes $250,000 to be invested in any high-priority downtown parking improvements as determined by the Bozeman Parking Commission
and the recently adopted Downtown Comprehensive Parking Management Plan.
Recommended Change in Priorities
Garage Equipment: The equipment in the Garage was installed during construction in 2008. It is
automated and uses gates and paper tickets to enter and requires credit card payments and gates to exit.
The first two hours are free, but the system requires the ticket issued when entering to open the gate to
exit. Most garages and parking lots using gates are staffed with attendants to collect payments and be on
site if issues arise (i.e. Gallatin Field – automated lanes with attendant booths). While the gate system works most of the time it does malfunction and is subject to operator errors requiring afterhours response
from the parking staff. Of particular concern is the increase in vandalism and theft of services as people
drive through the gates and manual lift them to avoid paying fees. Additionally, malfunctions or operator
error with credit cards cause backups and frustrations as people try and exit after an event downtown or
at other busy times. Public trust that the garage will operate properly is critical as we work to maximize its use.
Lease holders are issued an RFI card that will allow access and exit without using the ticket machines.
Three downtown hotels lease space in the garage to meet their required parking minimums per the
development code, these hotels are also issued RFI cards that are subject to loss and theft. The equipment to allow hotels to validate guest parking is prohibitively expensive and requires secure connections to
the City’s IT infrastructure. To overcome this financial and technological hurdle, parking staff has been
manually printing tickets for two of the hotels until this issue is resolved. This is not a long term solution.
Technology in the parking industry has improved rapidly over the last several years. Pay-on-foot, pay-by-plate/space, pay-and-display technology, and improved gate system have improved the user
experience, allowed for better and more efficient enforcement, and more accurate tracking of utilization
of the parking resource. We believe we should migrate to one of these new technologies to improve
service and streamline our garage operations, and for the surface lots should we decide to charge for
parking there.
Enforcement Equipment: The City purchased a citation management program from Duncan two years
ago. The system is comprised of handheld ticket writing machines, software that collects citation
information, allows for tracking, appeals and payments and, in theory, a collection service. The City
pays a per ticket fee for the service. Since its purchase and installation, the Duncan system has proven to be unreliable for both staff and the public. For the last two years we have worked with the vendor to address problems and have been only marginally successful. Vendor commitments and timeframes for
fixes and upgrades come and go with little or no communication from Duncan. The system is frustrating
to use for both the staff and general public and has resulted in lost revenue due to poor collection and
dismissal of citations.
It is my recommendation that we delay the parking lot reconfigurations and instead work to replace the
garage equipment and the Duncan citation system. Both will require a formal solicitation and will include
involvement of City Information Technology and Finance. Please note a new citation system may be pay
per transaction “purchase” and may not qualify as a capital outlay.
Page 3
Video Cameras: Our current camera system does not provide the level detail and coverage we need to
monitor and follow up the Police Department to prosecute criminal activity in the garage. We are
presently evaluating camera locations and types to more comprehensively capture activities at the
entry/exit gates and other public areas in the garage. It is our intent to use FY17 monies originally allocated for the Willson Lot reconfiguration to fund these needed upgrades. Once the proposals are
received, we will return to the Parking Commission with a report to seek your concurrence.
ALTERNATIVES: As suggested by the Parking Commission.
FISCAL EFFECTS: This plan assumes continued contributions from the TIF and will require their concurrence as we proceed. Initial discussions are favorable.
Attachments:
Draft CIP Schedule FY18-22
Report compiled on: November 3, 2016
Draft FY18-22 CIP for Parking Commission Consideration
Project
No. Project Name FY18 FY19 FY20 FY21 FY22 Unscheduled
GF199 Professional Building Remodel $35,779
P001 Willson Lot Redesign and Improvements $300,000
P004 Surface Parking Lot Hardware Systems $15,000 $15,000 $15,000 $15,000
P012 Armory Lot Redesign $250,000
P013 Black (Carnegie) Lot Redesign $410,000
P014 Parking Garage Crack Maintenance $5,000 $20,000 $5,000 $5,000 $20,000
P015 Parking Garage Roof Project $400,000
P016 Property Purchase – Future Facilities $1,500,000
P017 Rouse Lot Redesign $280,000
P020 Parking Vehicle Leases $10,000 $10,000 $10,000 $10,000 $10,000
P021 Portable Radio Replacement $20,000
P022 Parking Garage Equipment Replacement $150,000
P024 Replacement of Duncan Citation System
May not be a capital item