HomeMy WebLinkAbout16- Amendment 8 to PSA - HDR Engineering - Bozeman Wastewater Treatment Plant Phase 1 ImprovementsAMENDMENT NO. 08
TO
PROFESSIONAL SERVICES AGREEMENT
FOR
BOZEMAN WASTEWATER TREATMENT PLANT PHASE
IMPROVEMENTS
THIS IS AN AGREEMENT made as of 2016 between THE CITY OF
BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230
(OWNER) and HDR Engineering Inc., 8404 Indian Hills Drive, Omaha, NE 68114-4098,
(ENGINEER).
WHEREAS the parties previously entered into a Professional Services Agreement dated
April 9, 2007, herein referred to as the Original Agreement, and amended on December 1, 2008,
herein referred to as Amendment No. 1; amended on July 16, 2012, herein referred to as
Amendment No. 2; amended on February 25, 2013, herein referred to as Amendment No. 3;
amended on December 8, 2014, herein referred to as Amendment No. 4; amended on April 20,
2015 herein referred to as Amendment No. 5, amended on January 25, 2016 herein referred to as
Amendment No. 6, amended on April 11, 2016 herein referred to as Amendment No. 7, and
WHEREAS, the scope of the Original Agreement included preliminary design and design
engineering services, Amendment No. 1 included construction services, Amendment No. 2
included TMDL Technical Assistance; Amendment No. 3 included additional software
programming and additional construction observation, startup and observation services
associated with repair of Digester No. 3 and extension of the construction period for the Digester
No. 3 and Solids Handling Building (Phase 3) Project; Amendment No. 4 included additional
corrective action assistance and startup and observation services associated with repair of
Digester No. 3, design and procurement assistance with correction of leaking digester mixer
seals at Digester No. 1 and Digester No. 2 and additional follow-on technical assistance to the
City of Bozeman regarding the Montana DEQ's East Gallatin TMDL process; Amendment No. 5
to add additional follow on services for the TMDL Technical Services; Amendment No. 6 to add
additional construction contract services (Tasks 2000 — 2006); Amendment No. 7 to add
additional follow on services fro the TMDL Technical Services.
WHEREAS, the parties desire to amend provisions of the Original Agreement,
Amendment No. 1, Amendment No. 2, Amendment No. 3, Amendment No. 4, Amendment No.
5, Amendment No. 6 and Amendment No. 7, and additional professional engineering services
for Amendment No. 8 for Tasks 2007 and 2008.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS
CONTAINED HEREIN, the parties agree as follows:
1
The conditions and provisions set forth below, are hereby incorporated in and made part of this
Agreement.
ARTICLE 4 - Basic Engineering Services
Section 4.5.5. added to the Original Agreement as follows:
"4.5.5. Additional Construction Contract Services. In addition to the services provided
under Article 10 (Exhibit A) and Section 4.5.1 of the Original Agreement, the
ENGINEER shall provide the Additional Construction Contract Services during
construction under Exhibit J: Task 2007- Secondary Clarifier Weirs, Baffles and
Concrete Technical Assistance, Task 2008 — Water Reclamation Facility
Miscellaneous Assistance.
ARTICLE 6 - Compensation For Engineering Service
Article 6.2 of the Original Agreement and Amendments is replaced with the following:
"6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND
EXPENSES OF ENGINEER.
Construction and project documentation services performed as Basic Engineering Services under
Sections 4.4 through 4.7 (Tasks 700, 800 & 900 in Exhibit C, and Tasks 1100, 1200,
1300, 1400, 1500, 1600 & 1700 in Exhibit F, and Tasks 2000, 2001, 2002, 2003, 2004,
2005, 2006), including General Administration of Construction Contract, Resident
Project Representation, Project Documentation, Construction Testing, Bidding, Project
Startup & Commissioning, Application Software Programming and Project Closeout,
Programming and Digester Liner Repair Observation and Contract Closeout, Digester
Control Building Biosolids Loadout Truck Preliminary Design, Digester Control
Building DSL and TWAS Sludge Piping Modification Design, DAF Modifications
Preliminary Design, Biotrain No. 1 Modifications Preliminary Design, Hot Water Heat
Loop Evaluation and Preliminary Design, Secondary Clarifier Launder Covers Technical
Design Package Development, and Additional Digester No. 3 Corrective Action
Assistance, sub tasks 100-400 for Amendment 07 for the TMDL Assistance; Added
Task 2006, Secondary Clarifiers Weirs, Baffles and Concrete Technical Assistance
and Task 2008, Water Reclamation Facility Miscellaneous Assistance, services shall
be compensated in accordance with the following:
6.2.1 The OWNER shall pay for Bidding Phase, Construction Phase and Project
Documentation Services an amount not to exceed $5,113,783 ($129,957
{Subtasks 700, 800 and 900 Exhibit C}+ $4,767,571 {Subtasks 1100, 1200, 1300,
1400, 1500, 1600, 1700 Exhibit F}+ $20,000 {TMDL Assistance} + $175,000.00
{Subtasks 1600 and 1700 additional} + $81,411.00 {Subtasks 1800, 1900 Exhibit
H; $76,411 WRF and $5,000 TMDL}, + $6,000 {TMDL Additional Assistance}
+ $96,782 {Subtasks 2000 to 2006 Exhibit I}+ $91,000 {TMDL Subtasks 100-
2
4001 + $5,976.00 {Subtasks 2007 and 2008 Exhibit KD except as provided
under 6.2.1.2 and 6.2.4.
6.2.1.1 Costs Compensation. Compensation for these services shall be based on
the ENGINEER'S Direct Labor Cost times a factor of 3.15 for services rendered
which shall cover Direct Labor, Direct Labor Overhead, General &
Administrative Overhead and Profit, plus reimbursable expenses as provided in
6.2.2.
6.2.1.2 Notification. At any time during the construction that it becomes apparent
that the Bidding Phase, Construction Phase and Project Documentation Services
rendered under this Agreement will exceed the negotiated compensation for these
services, and prior to performing services in excess of the contract ceiling, the
ENGINEER shall give OWNER written notice thereof. Promptly thereafter
OWNER and ENGINEER shall review the scope and progress of the project
work. ENGINEER shall obtain written authorization from OWNER, prior to any
additional costs being incurred under paragraph 6.2.1.3. If it is determined that
due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled
to additional compensation, OWNER and ENGINEER may negotiate terms as
provided under 6.2.1.1. The amount and terms of any additional compensation
under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16.
6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under
5.2.1, when the total cost of the original scope Construction Phase and Project
Documentation Services exceeds the negotiated compensation for these services,
the OWNER shall pay only for the direct costs incurred in excess of the estimated
compensation. These costs consist of an amount equal to the ENGINEER'S
Direct Labor Cost times a factor of 2.80 for services rendered which shall
include Direct Labor, the federally audited payroll Direct Labor Overhead, and
General & Administrative Overhead costs, but shall not include any allowance for
profit.
6.2.2. Failed Test Expenses. The ENGINEER shall maintain and provide to the
OWNER, a record of the costs associated with failing quality control tests
performed for the OWNER during the course of the construction of the project
and recommend an amount the OWNER deduct from the contractor(s) payments.
6.2.3 The OWNER shall pay an amount for Additional Services rendered by the
ENGINEER and approved in writing by the OWNER on the basis of the
ENGINEER'S Direct Labor Costs times a factor of 3.15, or an amount otherwise
negotiated at the time such services are requested and approved by the OWNER.
Additional Services also include those services defined in SubTask 1000 of
Exhibit C, in an amount not to exceed 100,000."
6.2.4. Not used.
3
Except as specifically amended herein, the Original Agreement and Amendments 1-7
shall remain in full force and effect and the parties shall be bound by all terms and
conditions therein.
In witness whereof, the Parties hereto do make and execute this Agreement.
CITY OF BOZEMAN, MONTANA
BY: CLUB A.
(City Manager)
DATE: q -Z 6-16
ATTEST:
p�.130 .
BY:
(City Clerly`° •'�
1
HDR ENGINEERING, INC.
BY:4
(Amanda Mce u4iS, P.E. Area Manager)
DATE: 8
EXHIBIT J
CITY OF BOZEMAN, MONTANA
WASTEWATER RECLAMATION FACILITY (WRF)
PHASE 1 EXPANSION
ADDITIONAL SCOPE OF SERVICES
Tasks
2007 Secondary Clarifier Weirs, Baffles, and Concrete
Repair Technical Assistance 1
1 2008 Water Reclamation Facility Miscellaneous Assistance
Task 2007 — Secondary Clarifier Weirs, Baffles, and Concrete
Repair Technical Assistance
Objective:
Provide a technical specification and drawings for the replacement of weirs and baffles and
coating concrete associated with the launders for Secondary Clarifiers for City incorporation into
a bid package. This work will be completed in conjunction with Task 2005.
Sub Task 2007.1 - Technical Specification Development
HDR/MMI will modify the Phase 1 project specification in a 5 -digit CSI specifications format.
The specification will include materials specifications (similar in format to the WRF Phase 1
project for Secondary Clarifiers No. 5 and 6) for procurement and installation of new weirs and
baffles and coating of the concrete associated with the launders on Secondary Clarifiers No. 1, 2,
and 3. The specification will be provided to the City for City incorporation into a bid package
for procurement and installation. Quality assurance and quality control review of the deliverables
will be completed.
Sub Task 2007.2 - Plan Development and Construction Phase Assistance
HDR/MMI will develop incorporate AutoCADD plan view drawings for the weir and baffles
replacement. It is assumed the following drawings will be required for the cover installation bid
package:
• Cover Sheet
• General Abbreviations and Symbols
Exhibit I - Scope of Services 1 of 2 8/24/2016
• Secondary Clarifiers 1, 2 & 3 Installation Plan Views and Sections
• Photo sketches
This task also includes 8 manhours total, associated with shop drawing technical review and
construction installation review.
Deliverables:
• Specification (in .pdf format).
• Plan views (AutoCADD format).
City Involvement:
• Review of preliminary specification provided.
• Timely review of submittals and coordination of City review comments.
Task 2008 — Water Reclamation Facility m Construction
Support
Objective:
Provide assistance in support of the Water Reclamation Facility regarding ductile iron pipe
fittings installed during the Phase 1 and Digester No. 3 projects.
Subtask 2008.1- Construction Support
HDR/MMI will provide assistance to the City as requested limited to the budget authorized in
this amendment for this task.
ENI) OF SCOPE OF SERVICES
Exhibit I - Scope of Services 2 of 2 8/24/2016
Exhibit K
City of Bozeman Water Reclamation Facility
Phase 7 Expansion Amendment No. 8
Engineering Fee Estimate
Task Cost Summary
Task
Task Description
Direct Labor
txpenses esy
Task
Task Total
Digester Control Building Biosolids Loadout Truck Bay and Building Extension
2000
Assistance
$
$
$
2001
Digester Control Building DSL and TWAS Sludge Piping Modification Assistance
$
$
$
2002
DAF Modifications Preliminary Design Memorandum
$
$
$
2003
Biotrain No. 1 Modifications Preliminary Design
$
$
$ -
2004
Hot Water Heat Loop Evaluation and Preliminary Design
$
$
$
2005
Secondary Clarifier Launder Covers Technical Assistance
$
$
$
2006
Digester No. 3 Corrective Action Assistance
$
$
$
2007
Secondary Clarifier Weirs, Baffles and Concrete Technical Assistance
$
4,662.00
$
410.00
$ 5,072.00
2008
Water Reclamation Facility Miscellaneous Assistance
$
856.80
$
48.00
$ 904.80
Total Labor and Expenses Cost by Task
$
5,518.80
$
458.00
$ 5,976.80
Expense
Summary
Expenses
Miscellaneous
$
100.00
Travel Expenses
$
20.00
Mapping/Photos/Surveys
$
-
Printing and Photocopying
$
50.00
Technology
$
288.00
Total Expenses
$
458.00
TOTAL ESTIMATED ENGINEERING SERVICES FEE
$
5,976.80
MMI—Task 2007.2008.xlsx Page 1 of 1 8/24/2016
Secondary Clarifier Weirs, Baffles and
2007 Concrete Technical Assistance
HDR Staff
Dan Harmon
John Koch
Craig Caprara
Nathan Kutil
Rickey Schultz
Coralynn Jones
Tom Hanou
Bob Bower
Donn Hogan
Ted Kontonickas
Mario Benisch
Don Best
Adam Serock
Ken McGowan
Heather Fancher
Katie Ward
Chris Kelly
HDR Totals
Morrison Maierle Staff
Nancy Cormier
James Nickelson
Mike Kaczmarek
Nate Menuez
Steve Malmberg
Travis Meyer
Bill Farrell
Steve Rude
Mike Brandt/Tom Coburn
Roger Sommerville
Steve Malmberg
Sue Dugan/Paula Madden
Morrison Maierle Totals
TOTAL HOURS
Secondary Clarifier Weirs, Baffles and
2007 Concrete Technical Assistance
Subtasks
2007.1 2007.2
Total
Hours
100.00
Rate
$
Total
0
0
0
$
68.00
$
-
0
0
0
$
66.00
$
-
0
0
0
$
66.00
$
-
0
0
0
$
38.00
$
-
0
0
0
$
33.00
$
-
0
0
0
$
33.00
$
-
0
0
0
$
39.00
$
-
0
0
0
$
65.00
$
-
0
0
0
$
62.00
$
-
0
0
0
$
68.00
$
-
0
0
0
$
54.00
$
-
0
0
0
$
64.00
$
-
0
0
0
$
38.00
$
-
01
0
0
$
61.00
$
-
0
0
0
$
30.00
$
-
0
0
0
$
29.00
$
-
0
0
0
$
31.00
$
-
.. '
_
0
0
0
$
49.00
$
-
4
2
6
$
58.00
$
348.00
0
0
0
$
41.00
$
-
0
0
0
$
46.00
$
-
81
24
32
$
34.00
$
1,088.00
0
0
0
$
58.00
$
-
0
0
0
$
32.00
$
-
0
0
0
$
36.00
$
-
0
0
0
$
41.00
$
-
0
0
0
$
38.00
$
-
0
0
0
$
35.00
$
-
2
0
2
$
22.00
$
44.00
r.
Total Labor $ 1,480.00
OH/Profit Multiplier x3.15
Total Direct Labor $ 4,662.00
Direct Expenses:
Miscellaneous
$
100.00
Travel Expenses
$
20.00
Mapping/Photos/Surveys
$
-
Printing and Photocopying
$
50.00
Technology
$
240.00
Total Direct Expenses
$
410.00
TASK TOTAL
5,072.00
Water Reclamation Facility Miscellaneous
2008 Assistance
HDR Staff
Dan Harmon
John Koch
Craig Caprara
Nathan Kutil
Rickey Schultz
Coralynn Jones
Tom Hanou
Bob Bower
Donn Hogan
Ted Kontonickas
Mario Benisch
Don Best
Adam Serock
Ken McGowan
Heather Fancher
Katie Ward
Chris Kelly
HDR Totals
Morrison Maierle Staff
Nancy Cormier
James Nickelson
Mike Kaczmarek
Nate Menuez
Steve Malmberg
Travis Meyer
Bill Farrell
Steve Rude
Mike Brandt/Tom Coburn
Roger Sommerville
Steve Malmberg
Sue Dugan/Paula Madden
Morrison Maierle Totals
TOTAL HOURS
Miscellaneous
Travel Expenses
$ -
Mapping/Photos/Surveys
$
Printing and Photocopying
$ -
Technology
$ 48.00
Total Direct Expenses
$ 48.00
-�
.VNIRNa
Total Labor $ 272.00
OH/Profit Multiplier x3.15
Total Direct Labor $ 856.80
Direct Expenses:
Miscellaneous
Travel Expenses
$ -
Mapping/Photos/Surveys
$
Printing and Photocopying
$ -
Technology
$ 48.00
Total Direct Expenses
$ 48.00
TASK TOTAL
904.80