Loading...
HomeMy WebLinkAbout16- Amendment 1 to PSA - Advanced Engineering and Environmental Services (AE2S) - Water Facility Plan Update (WFPU)Amendment No. I to Professional Services Agreement AE2S, Inc. THIS AGREEMENT is made as of this 15th day of September, 2016, between THE CITY OF BOZEMAN, a Municipal Corporation, P.Q. Box 1230, Bozeman, MT 59715 (OWNER) and Advanced Engineering and Environmental Services. Inc.. with offices at 1050 East Main, Suite 2, Bozeman, MT 59517 (CONSULTANT). WHEREAS, the Parties have entered into a Professional Services Agreement dated August 24th, 2015 herein referred to as Original Agreement for professional consulting services; and WHEREAS, the Parties desire to further amend the provisions of the Original Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the Parties agree as follows: 1. TASK ORDER A is added to Article 4 —Basic Engineering Services. Task Order A, Wastewater Collection System Model Update, details specific scope and project related expenses necessary to improve connectivity between the City's InfoSewer model and existing GIS layers. Except as specifically amended herein, the Original Agreement shall remain in full force and effect, and the Parties shall be bound by all terms and conditions therein. IN WITNESS WHEREOF, the Parties hereto do make and execute this Agreement on the day and year first above written. CITY OF BOZEMAN, MONTANA BY: (GAY 49M K • • ATTEST:: BY: (City Attorney) CONSULTANT BY: (CONSULTANT) " W rl 77 NMI ATTEST: BY: 4��7 Amendment No. I to Professional Services Agreement for Water Facility Plan Update. TASK ORDER A Scope of Services The following scope of work describes additional services by AE2S and subconsultant, StreamlineAM, to be provided under the contract between the City of Bozeman and AE2S for completion of the Water Facility Plan Update (WFPU). Additional work has been detailed under current task numbers for the base agreement. TASK 0 Project Management Project Management tasks include: • Contract Amendment Coordination and Development. Assumptions/Clarifications: • Schedule of Task A is independent of the completion of the Water Facility Plan Update deliverables and will not delay completion of that work. • Deliverables: No additional deliverables TASK 1 Planning and Service Area Update No additional work required under this task. TASK 2 Water Use Characterization No additional work required under this task. TASK 3 Water Distribution System Model Update No additional work is required under this task. TASK 4 Existing Fire Flow Analysis No additional work is required under this task. TASK 5 Pressure Zone and Pressure Reduction Study No additional work required under this task. TASK 6 Capital Improvements Plan No additional work required under this task. TASK 7 Non -Potable Irrigation System Study No additional work required under this task. TASK 8 Water Facility Plan No additional work required under this task. TASK A Wastewater Collection System Model Update • Document the attribute and connectivity needs and relationships between InfoSewer and the existing GIS layers maintained by the City of Bozeman. • Propose path forwards for integration dependent on the review of the dependencies between the two systems. Amendment No. I to Professional Services Agreement for Water Facility Plan Update. • Build two FME scripts, one for audit of the GIS edited layers and one for producing output that can be imported into the InfoSewer modeling software. • Review and plan approach with City of Bozeman staff for results of the audit and GIS Model integration. • Present final drafts of FME scripts, white paper and FME documenter for City of Bozeman Review. Final draft may include GIS datasets, scripts, white papers, and audit lists. • After responding to any comments, the final deliverables, including a summary document of the methodology and changes to the datasets will be delivered on- site, including connecting the data to the enterprise, and providing on-site assistance and mentoring to transition the scripting successfully to City of Bozeman Staff. Deliverables: • Summary technical memorandum describing methodology and changes to the datasets Compensation ENGINEER will perform Task Order A at direct labor costs consistent with those included in the Original Agreement. Additionally, reimbursable expenses associated with travel and deliverables will be billed consistent with the Original Agreement as well. The total for Task Order A is $23,318. Compensation by Task is shown below. Phase Task Total Hours I Total Fee AM StreamlineAM Hours labor I Rel b. [Subconsultanq Hours I labor I Reimb. Professional Fees and Reimbursable Expenses 0 1project Management 23 $ 3,431 6 $ 1,200 1 $ 1 $ 106 17 $ 2,125 $ A lWasteviater Collection System Model Update 124 $ 19,887 0 $ $ $ 947 1241$16,440 $ 2,500 Total Professional Fees & Reimbursable Expenses 1471 23,318 61 1,2001 01 1,053 1411 18,5651 $ 2,500 Consultant's Initial Client's Initial (k— Amendment No. 1 to Professional Services Agreement for Water Facility Plan Update.