Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Southbridge Subdivision Ph V - Realignment of S 23rd & Water Sewer Improvements
SHEET INDEXSOUTHBRIDGE SUBDIVISION PHASE VREALIGNMENT OF SOUTH 23RD AVENUEANDSEWER & WATER MAIN IMPROVEMENTSSOUTHBRIDGE SUBDIVISION ROADWAY, SEWER & WATER IMPROVEMENTSPREPARED BY:MADISON ENGINEERING895 TECHNOLOGY BOULEVARD, SUITE 203BOZEMAN, MT 59718(406) 586-0262 (406) 586-5740 FAXPROJECTLOCATIONVICINITY MAPNTSPROJECT LOCATED INBOZEMAN, MONTANASEPTEMBER 2015LEGAL DESCRIPTIONOWNER:SOUTHBRIDGEDEVELOPMENT LLC20 NORTH TRACY AVE.BOZEMAN, MT 59715COVER SHEETAS-BUILT BLOCK 11BLOCK 12SOUTH 19TH AVENUEBLACKWOOD ROADALLEY #1ENTERPRISE BOULEVARDEDWARD DRIVEBLAKE DRIVEJACOBS STREETLANCE DRIVES 22TH AVENUES 21ST AVENUES 23TH AVENUE S 20TH AVENUEBENCHMARKHYD. #2345HYD.BENCHMARKxxxKIRK DRIVECHIPSET STLEGENDOVERALL SITE PLANSCALE: NTSGENERALC0.1GENERAL NOTES AND LEGEND BENCHMARK INFORMATIONSHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MTAS-BUILTDATUM CHIPSET ST LANCE DRIVE BLACKWOOD RD KIRK DR.ROADWAYROADWAY REALIGNMENTC2.01" =0SCALE50'1002550SOUTH 23RD AVE. PLANSOUTH 23RD AVE. PROFILESHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MT DATUMAS-BUILT S. 23RD AVE ROADWAY ROADWAY REALIGNMENTC2.11" =0SCALE20'401020CHIPSET ST PLANCHIPSET ST PROFILESHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MT DATUMAS-BUILT BREE LANESOUTH 23RD AVEBLACKWOOD ROAD LANCE DRIVE SEWER MAINSANITRAY SEWER MAIN REALIGNMENTC3.01" =0SCALE50'1002550SEWER MAIN PLAN - SOUTH 23RD AVE.SEWER MAIN PROFILE - SOUTH 23RD AVE.SHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MTAS-BUILTDATUM CHIPSET STSOUTH 23RD AVEBLACKWOOD ROAD KIRK DRIVE LANCE DRIVE WATER MAINWATER MAIN REALIGNMENTC4.01" =0SCALE50'1002550WATER MAIN PLAN - SOUTH 23RD AVE.WATER MAIN PROFILE - SOUTH 23RD AVE.SHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MTAS-BUILTDATUM DETAIL3C5.0VALLEY GUTTER DETAILDETAIL1C5.0INTEGRAL CONCRETE CURB & GUTTERDETAIL2C5.0PEDESTRIAN RAMPTYPICAL ROADWAY SECTIONDETAIL4C5.0CONCRETE SIDEWALKC5.0DETAILSSOUTH 23RD AVENUE ROADWAY DETAILSSHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MTAS-BUILT DETAIL1C5.1TYPICAL UTLITY TRENCH DETAILDETAIL5C5.1FIRE HYDRANTDETAIL4C5.0WATER SERVICE LINEDETAIL3C5.1SANITARY SEWER MANHOLEDETAIL2C5.1SANITARY SEWER SERVICE LINEC5.1DETAILSSEWER & WATER DETAILSSHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXSOUTHBRIDGE SOUTHBRIDGE BOZEMAN, MTAS-BUILT