HomeMy WebLinkAboutL0201_Black&Olive_Irrigation-L0201EAST OLIVE STREET(58'-6" -60'-0" R.O.W.)SOUTH BLACK AVENUE(57'-6" R.O.W.)CBFCPWPROPERTY LINECAR SHAREGARAGE ACCESSPROPERTY LINEPROPERTY LINEPROPERTY LINEIRRIGATION SCHEDULEIRRIGATION TYPEANNUALETRATETOTALAREA/QTYTOTALANNUALH2048,390 galTOTAL ANNUAL H20 REQUIRED TOTALACRE FEET PER YEAR0.15 acre feet19,783 gal1,095sqftH.E.SPRAYIRRIG.(SOD)20,596 gal1,140sqftH.E. BLVDSPRAYIRRIG.(SOD)113gal / week2,025 gal5TREESH.E. TREEBUBBLER31PLANTSH.E. SHRUBDRIP IRRIG.50PLANTSH.E. PERNDRIP IRRIG.29 in / sqft29 in / sqft232.5gal / week4,185 gal100 gal /week1,800 gal SYM DESCRIPTION IRRIGATION LEGENDIRRIGATION POINT OF CONNECTIONNOTE: IRRIGATION LAYOUT TO BEDETERMINED IN FIELD BY IRRIGATIONCONTRACTORIRRIGATION SLEEVE, 4" MIN. SCH. 40 PVCWCBFCPBACKFLOW PREVENTERIRRIGATION CONTROLLERWEATHER STATIONIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE OF TREE WITH THREE (3) EVENLY SPACED .25 GPM BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATIONADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERSEVENLY DISTRIBUTED AROUND BASE, WITH TWO (2) EVENLY SPACED .25 GPM EMITTERS.6.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIPTUBING W/ EMITTERS ADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.7.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATIONAS INDICATED PER PLAN.8.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE9.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.10.BACKFLOW PREVENTOR AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECH ROOM ORAPPROVED EXTERNAL GRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPECONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES, WITHARCHITECTURE. AND WITH ALL OTHER TRADES.11.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICALENGINEERING AND ELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.12.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADECHANGES ARE PRESENT.13.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.14.CONTRACTORS RESPONSIBILITY TO CONFIRM WATER SOURCE, VERIFY WATER PRESSURE,AND GPM AVAILABLE. LANDSCAPE ARCHITECT TO BE NOTIFIED OF ANY DISCREPANCIESBETWEEN STATED WATER PRESSURE AND GPM AND ACTUAL.15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLANON SITE AT ALL TIMES.16.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATIONRATE OF 1.5"/sqft.105020N1L02.011"=10'-0"Irrigation Plan - Ground FloorSHEET TITLEISSUES/REVISIONSSTAMPSHEET NUMBERZ:\Clients\Black and Olive\Autocad\01_Sheets
BLACK & OLIVE, LLC
BLACK OLIVE
202 SOUTH BLACK AVENUE,
BOZEMAN, MONTANA 59715NOT FORCONSTRUCTION#DateDescription10/04/2016SITE PLAN#DateDescriptionL02.01IRRIGATIONPLAN -GROUND FLOOR