Loading...
HomeMy WebLinkAbout3_SP1_2016.10.04 BLACK OLIVE – SP1 (SITE PLAN CHECKLIST) DATE: October 04, 2016 - See SP1 submittal for documents listed below. GENERAL INFORMATION: 1. BLACK OLIVE 2. Black & Olive, LLC. 20 North Tracey Avenue, Bozeman, MT 59715 3. Name and mailing address of engineer, architect, landscape architect, planner, etc. a. Architect: Johnson Nathan Strohe i. 1600 Wynkoop St., Suite 100, Denver, CO 80202 b. Landscape Architect: Design 5 i. 37 E. Main Street, Suite 10, Bozeman, MT 59715. c. Civil Engineer: Stahly Engineering & Associates i. 851 Bridger Drive, Suite 1, Bozeman, MT 59715 4. 202 South Black Avenue, Bozeman, MT 59715 5. See A00.90 and A01.00 6. See construction route map provided by L.Keeley Construction. SITE PLAN GENERAL: 7. See Civil Plans showing boundary line with dimensions. 8. Provided. 9. Provided. 10. Provided. 11. See Civil Plans and Project Matrix on Architectural FLOOR PLANS. 12. See Project matrix on Architectural FLOOR PLANS. 13. Location, percentage of parcel(s) and total site, and square footage of the following: a. See Project Matrix. b. See Project Matrix. c. See Project Matrix. d. See Project Matrix for open space requirement and breakdown of calculation provided for 55 units. e. Parkland to be provided by cash in-lieu per 38.27.020.A.1. See Project Matrix from parkland requirement calculation for cash in-lieu. f. See A00.90. 14. See Project Matrix. SITE PLAN DETAILS: 15. See Civil Plans. 16. See Civil Plans. 17. See Civil Plans. 18. See Civil Plans. 19. See Civil Plans. 20. See Civil Plans and Architectural Site Plan. Ingress and Egress points onto site for pedestrians are from sidewalks along E. Olive St. and S. Black St. Main entrance into residential building is at the north side of the site by Stair 1 and Elevator Vestibule lobby. Main pedestrian entry points for retail are along same sidewalks and onto Northwest corner of the site. 21. See Civil Plans and Architectural Site Plan. Traffic flow on site is through the north off of E. Olive St into the parking garage. There are 3 car share garages at the west side of the site on from S. Black Ave. 22. See Civil Plans and Architectural Site Plan. Traffic flow off site is through the north off of E. Olive St into the parking garage. There are 3 car share garages at the west side of the site off onto S. Black Ave. 23. See Civil Plans and A01.00, A01.01 for parking stall layouts and parking calculation on Project Matrix. 24. See Civil plans for proposed utility locations. Additional water and sewer design information is provided in the Engineering Report. 25. There are no water courses, wetlands or floodplains on the property. 26. A grading plan is provided in the Civil plans. Additional storm water design information is provided in the Engineering Report. 27. There are no downstream drainage ways that are part of the storm drainage system. 28. There are no rock outcroppings or slopes greater than 15% on the site. 29. The site plan provided with the Civil plans show all sidewalks, driveways and loading areas. Building garage doors have been held back 5’ from sidewalks to reduce pedestrian conflicts. 30. See Civil Plans, A00.40-.44, A01.00, A01.01. 31. See Civil Plans for retaining walls, Architectural Floor Plans/Elevations and Landscape Plans for aesthetic walls/fences. 32. See Construction Route Map for exterior refuse collection during construction. Permanent refuse collection will be located at the trash pad at the north side of the building along E. Olive St. at the east end of the building. It will be screen with wood screening similar to the building wood material. Each floor of the building has a trash chute down into the trash termination room at the 1st floor. The trash containers will be put out onto the trash pad for collection. 33. Site details are provided with the Civil plans. 34. The proposed on-site parking is provided on the ground floor of the building and snow plowing will not be required. Therefore, no snow storage is required or proposed. 35. See Civil Plans and A01.00 for Site Vision Triangles. 36. The site has been previously developed no significant natural areas exist. The Civil plans show existing trees to remain, and to be removed. One boulevard street tree will need to be removed, and one street tree will be added. 37. N/A 38. See A00.90. PARKLAND AND AFFORDABLE HOUSING: 39. Parkland to be provided by cash in-lieu per 38.27.020.A.1. See Project Matrix for Parkland requirement calculation for cash in-lieu. 40. N/A. This project will not be providing Affordable Housing. LIGHTING DETAILS: 41. See Electrical Lighting/Photometric Plan. 42. See Electrical Lighting/Photometric Plan. 43. See Electrical Lighting/Photometric Plan and Lighting Details. BUILDING DESIGN AND SIGNAGE: 44. See A03.01, A03.02 and Material Board. 45. See A03.01, A03.02 for screening information. 46. See A03.01, A03.02 for signage elevations and maximum area calculation per Table 38.28.060, B-3 Zoning District. LANDSCAPE PLAN: 47. See L01.01. Black Olive. 202 South Black Avenue, Bozeman, MT 59715 48. See L01.01. 49. See L01.01. 50. See L01.01. 51. N/A 52. See L01.01. 53. See L01.01. 54. N/A 55. See Civil Site Plan, Architectural Site Plan and L01.01, for street vision triangles. 56. See L01.01. 57. See L01.01. 58. N/A 59. See L01.01. 60. N/A 61. N/A 62. See L01.01. 63. See L01.01. 64. See L02.01. 65. See L01.01. 66. See L01.01. STREET AND TRAFFIC: 67. The proposed on-site parking is provided on the ground floor of the building and snow plowing will not be required. Therefore, no snow storage is required or proposed OTHER PERMITS: 68. A draft of the stormwater management permit is provided. An executed permit will be provided prior to construction.