HomeMy WebLinkAbout16- Joint Funding Agreement - U.S. Geological Survey - Water Resource InvestigationsForm 9-1366 U.S. Department of the Interior Agreement#: 17WNMT151400005
(April 2015) U.S. Geological Survey Customer#: 6000001514
Joint Funding Agreement Project #: RSOOFN6
FOR TIN #: 81-6001238
Water Resource Investigations USGS DUNS #: 949286017
Fixed Cost Agreement YES[ X ] NO[ ]
THIS AGREEMENT is entered into as of the 1st day of October 2016, by the U.S. GEOLOGICAL SURVEY, Wyoming -Montana
Water Science Center, UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part, and the CITY OF BOZEMAN,
party of the second part.
1. The parties hereto agree that subject to the availability of appropriations and in accordance with their respective authorities
there shall be maintained in cooperation for the continued operation of a streamflow-gaging station on East Gallatin River
above Water Reclamation Facility, near Bozeman (06048650), herein called the program. The USGS legal authority is 43 USC
36C; 43 USC 50, and 43 USC 50b.
2. The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work directly related to
this program. 2(b) include In -Kind -Services in the amount of $0.00
(a) $6,770 by the party of the first part during the period
October 1, 2016 to September 30, 2017
(b) $9,400 by the party of the second part during the period
October 1, 2016 to September 30, 2017
(c) Contributions are provided by the party of the first part through other USGS regional or national
programs, in the amount of :
Description of the USGS regional/national program:
(d) Additional or reduced amounts by each party during the above period or succeeding periods as may be
determined by mutual agreement and set forth in an exchange of letters between the parties
(e) The performance period may be changed by mutual agreement and set forth in an exchange of letters
between the parties.
3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively governing each
party.
4. The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review by an
authorized representative of the party of the first part.
5. The areas to be included in the program shall be determined by mutual agreement between the parties hereto or their
authorized representatives. The methods employed in the field and office shall be those adopted by the party of the first part to
insure the required standards of accuracy subject to modification by mutual agreement.
6. During the course of this program, all field and analytical work of either party pertaining to this program shall be open to the
inspection of the other party, and if the work is not being carried on in a mutually satisfactory manner, either party may terminate
this agreement upon 60 days written notice to the other party.
7. The original records resulting from this program will be deposited in the office of origin of those records. Upon request, copies of
the original records will be provided to the office of the other party.
8. The maps, records or reports resulting from this program shall be made available to the public as promptly as possible. The
maps, records or reports normally will be published by the party of the first part. However, the party of the second part reserves
the right to publish the results of this program and, if already published by the party of the first part shall, upon request; be
furnished by the party of the first part; at cost, impressions suitable for purposes of reproduction similar to that for which the
original copy was prepared. The maps, records or reports published by either party shall contain a statement of the cooperative
relations between the parties.
9. USGS will issue billings utilizing Department of the Interior Bill for Collection (form DI -1040). Billing documents are to be
rendered annually. Payments of bills are due within 60 days after the billing date. If not paid by the due date, interest will be
charged at the current Treasury rate for each 30 day period, or portion thereof, that the payment is delayed beyond the due date.
(31 USC 3717; Comptroller General File B-212222, August 23, 1983.).
Form 9-1366 U.S. Department of the Interior
(April 2015) U.S. Geological Survey
Joint Funding Agreement
FOR
Water Resource Investigations
USGS Technical Point of Contact
Name:
Wayne Berkas
U.S. Geological Survey, WY -MT WSC
Address:
3162 Bozeman Avenue
Helena, MT 59601
Telephone:
(406) 457-5903
Fax:
(406) 457-5990
Email:
wrberkasausgs.gov
USGS Billing Point of Contact
Name:
Gina Nugent
U.S. Geological Survey, WY -MT WSC
Address:
3162 Bozeman Avenue
Helena, MT 59601
Telephone:
(406) 457-5915
Fax:
(406) 457-5990
Email:
gnugent _usgs.gov
U.S. Geological Survey
United States
Department of Interior
Signature
By �` j %/ ,� Date:
Name: Jill Frankforter
Title: Acting Director, WY -MT Water Science Center
Agreement#: 17WNMT151400005
Customer#: 6000001514
Project #: RSOOFN6
TIN #: 81-6001238
USGS DUNS #: 949286017
Customer Technical Point of Contact
Name:
Brian Heaston
City of Bozeman
Address:
P.O. Box 1230
Bozeman, MT 59771-1230
Telephone:
(406) 582-2924
Fax:
Email:
bheastonabozeman.net
Name:
Address:
Telephone:
Fax:
Email:
Customer Billing Point of Contact
CITY OF BOZEMAN
Signatures
By\.�Date: O
Name:
Title:
By Date:
Name:
Title:
By Date:
Name:
Title: