MEMORANDUM
TO: Midtown Urban Renewal District Board
FROM: David Fine, Economic Development Specialist
RE: The Wok Restaurant Demolition Rehabilitation Grant Application
DATE: October 4, 2016
Project Description: A request for rehab grant funding in the amount of $25,000 for demolition of
the Wok restaurant site. Total project costs are $70,205.93.
Project Location: 319 N. 7th Avenue and is legally described as Durston Subdivision, S12, R05E, Acres .0837, N 142.9’ Tract 7, within Bozeman, Gallatin County, Montana. The property is located
within the B-2M, Community Business District - Mixed.
Recommendation: Approve grant in the amount of $25,000.00. See Project Review Criteria for analysis.
Project Review Criteria: The N7Rehab Program provides grants to foster voluntary
rehabilitation or redevelopment of eligible commercial properties for the elimination of blight in the North 7th Corridor. To evaluate requests, the following review criteria are used by the
Midtown Urban Renewal Board and Staff to evaluate projects. Staff analysis follows each criterion.
1. Public Improvements
Does the proposed project address a lack of, or poor condition of: storm water facilities, curb and gutter, sidewalks, landscaping in the right-of-way, parking lot approaches,
parking lot access issue, or encroachments into the public right-of-way?
No. The proposed project does not address existing deficiencies or public improvements. However, the property owner has previously provided a public access and utility easement in
support of the North 7th Avenue Lighting and Streetscape Project.
2. Regulation Compliance Does the proposed project address non-compliant signage, lack of paving or poor
condition of paving, ADA access, landscaping, parking circulation or storm water control?
No. Improvements to paving or landscaping are not proposed with this project. It is imperative
that the contractor plan for leaving the demolished site in a stable and remediated condition that addresses storm water control, weed control, and aesthetic considerations in the event that a
new construction project is not immediately forthcoming.
Wok Restaurant Demolition Grant Application Page 2
3. Is the building/site currently vacant?
Yes. The building has been vacant since September 2015. Due to the condition of the building
the owners have been unable to stimulate tenant interest in the existing building. The site,
however, at the corner of an important pedestrian crossing, is an excellent spot for mixed use
redevelopment.
4. Is it converting a building/site from a non-conforming use to a conforming use?
Yes. The existing vacant and obsolete building is not in conformance with the newly adopted B-
2M zoning. A new building would be required to conform to the requirements of the new zoning
in terms of orientation to the street and other design considerations.
5. Design and Connectivity Plan
Does the proposed project address the site and building level objectives to encourage the
rehabilitation and redevelopment of parcels that are underutilized or do not meet current standards, establish a stronger relationship between buildings and the street by providing
pedestrian connections and orienting buildings to the street; incorporates pedestrian amenities and landscaping in existing developments, and incorporates public art in small
pocket parks and plazas?
Yes. The proposed demolition project addresses the site level objectives of the Design and
Connectivity Plan by encouraging “the rehabilitation and redevelopment of parcels that are
underutilized and that do not meet current standards” (p. 2) Demolishing a vacant and outdated
structure will serve this criterion in two ways: It will remove a blighted and vacant building from
the corridor, and it will ensure that new development will be compliant with the requirements of
the new zoning designation. Moreover, the concurrently submitted technical assistance grant
(TAG) application for the site proposes that, “The existing single level building would be
replaced with a multi-story, mixed use building with potential housing above, which would
anchor the existing corner of N. 7th Avenue and. W. Villard Street.”
Additionally, the property owner has previously provided a public access and utility easement in
support of the North 7th Avenue Lighting and Streetscape Project.
6. Design and Connectivity Plan Corridor Goals
Does the proposed project strengthen the corridor as a neighborhood service center by providing double fronting building, pedestrian connection to public right-of-way and on-
site bicycle facilities or landscape buffers when adjacent to residential neighborhoods.
No. While the TAG application for this site may allow the property owner to consider these
issues, they are not addressed as part of the demolition grant application.
Wok Restaurant Demolition Grant Application Page 3
7. Bozeman Design Objectives Plan Does the proposal improve the aesthetic experience by strengthening the appearance,
character and feel of the building through the application of guidelines from the
Bozeman Design Objectives Plan?
To be determined. The TAG application gives the property owner the opportunity to address the
appearance and feel of a proposed building, but that work has not been completed at this time.
Summary
The Design and Connectivity Plan for North 7th Avenue Corridor (DCP) highlighted a number of
issues with the corridor that could be remedied by the demolition of existing structures that are non-
compliant, outdated and in this case vacant. Redoubling efforts to rehabilitate existing properties
that are underutilized and set back from the street will only compound the issues this board is
attempting to address with the DCP and the new B-2M zoning. Property owners should be
encouraged to proactively demolish and redevelop properties with these characteristics. Such actions
clearly address the overarching urban renewal district aim of eliminating blight.
The property owners have attempted and failed to attract interest in a facility that has come to the
end of its useful life. The owners are optimistic about the site for its redevelopment potential. Staff
shares that optimism.
It is important for the applicant to accept that despite their best efforts, redevelopment on a cleared
site may not be immediate. The applicant should develop a plan to stabilize the site and address
longer term aesthetic issues with a cleared site that is not immediately redeveloped. The applicant
should also address drainage, storm water, and weed control issues at the time of demolition.
The application could be improved by providing a more thoughtful and specific plan for stabilizing
the demolished site and addressing aesthetic considerations.
It is recommended that a grant award in the amount of $25,000 be given for project costs related to
demolishing the site, with conditions. This amount represents the maximum allowed for demolition
under the N7 Rehabilitation Program which allows for coverage for up to 50% of demolition costs
not to exceed $25,000. The grant should be contingent on verification by Economic Development
Department that vendor selection is compliant with the City of Bozeman purchasing policy. The
grant should also be contingent on a thorough review and approval of the proposed demolition and
remediation plan by the Community Development Department.