Loading...
HomeMy WebLinkAbout319 N 7th TAG Application Supplement319 N Seventh Avenue Technical Assistance Grant Application October 2016 North Seventh Urban Renewal District | Redevelopment Incentive Program 1) Project Description The existing building and site located at 319 North Seventh Avenue is an ideal candidate for the North Seventh Urban Renewal District Redevelopment Incentive Programs. The subject property is located within the North Seventh Tax Increment District and would be consistent with the Design and Connectivity Plan (DCP), the Design Objectives Plan, the Bozeman Community Plan and the Unified Development Code. The property was used by The Wok (restaurant) until the Fall of 2015. The existing building is currently vacant. The team would like to explore the redevelopment of their property, through the demolition of the existing building and the design/construction of a new mixed-use building. The new mixed-use building would be consistent with the newly adopted B-2M (Community Business District—Mixed) and would potentially include main level restaurant and retail space, along with offices and residential above on subsequent levels above grade. This Technical Assistance Grant would specifically explore the following:  Parking and Site Analysis  Building Code Research  Unified Development Ordinance Analysis—’Midtown’ Code Changes  Municipal Review Processes Analysis  Conceptual Site and Building Design Analysis  Engineering Assessments, if needed  Preliminary Cost Estimates  Exploration of Development Scenarios & Conceptual Designs  Conceptual Tenant Configurations  Scenario Planning The client requests the full amount ($7,200) be applied to this project. The owner is also applying for the demolition funding through the North Seventh Urban Review District. Client: Jon Pine 200 Jeana Lei Court Bozeman, MT 59715 Applicant/Representative: Intrinsik Architecture, Inc 111 N Tracy Ave Bozeman, MT 59715 319 N Seventh Avenue 2) Technical Assistance—Firm Experience The property owners would like to retain Intrinsik Architecture, Inc. to collaborate with on their potential property redevelopment. Intrinsik Architecture, Inc. specializes in professional planning, architectural design and building. Over the past 13 years, Intrinsik has distinguished itself as a very unique studio with an emphasis in projects that embody and preserve the spirit of clients, the project and the place. Intrinsik has completed over 20 Technical Assistance Grants for the Downtown Bozeman Partnership. Some of the more notable Technical Assistance Grants which lead to actual projects include the Downtown Community Co-Op, the Thrive building remodel and façade improvements, the Baxter Hotel Sign and most recently the Bozeman Taproom and Fill Station. While everyone on the Design team will contribute to this project, Rob Pertzborn will serve as the Project Principal and Henri Foch will serve as the Project Manager. As a registered Montana architect and a practicing planner, Rob Pertzborn bridges the gap between buildings and neighborhoods. Rob has worked in design and planning for the past 20 years and has a wide range of experience ranging from historic civic and commercial renovations to land and municipal facilities planning to designing infill urban mixed use projects and residences. Rob specializes in big picture thinking and master planning to assure timely, quality and sustainable projects for the client, future residents and users, and the greater community. Rob is from Madison, Wisconsin and has lived in the Twin Cities before settling in Bozeman in 1989. Rob holds a Master of Architecture degree from Montana State University. Henri is a registered Architect, LEED AP and Project Manager at Intrinsik. He graduated from Drury University in Springfield, Missouri with a Bachelor of Architecture. An initial venture in furniture making and residential design-build led Henri to Bozeman in 2002 where he soon connected with Intrinsik Architecture. Initially alternating between construction, steel fabrication, and architecture he now works on a broad range of architectural projects from residential to commercial. Henri places a strong emphasis on craft and quality through the design and detailing of our projects. 319 N Seventh Avenue 3) Prospective project would support the Design and Connectivity Plan (DCP), the Design Objectives Plan, the Bozeman Community Plan and the Unified Development Code. Site redevelopment would support the Design and Connectivity Plan (DCP), the Design Objectives Plan, the Bozeman Community Plan and the Unified Development Code as follows: “Encourage the rehabilitation and redevelopment of parcels that are underutilized... (Page 2 Design and Connectivity Plan). This building and site is a prime example of an underutilized and underdeveloped site which makes it a perfect candidate for a Technical Assistance Planning grant. The existing structure is old and outdated. While the building currently is well positioned on the site, close to the street, the property owner is preparing to remove the building and make room for a more visually interesting and contributing building that interacts with the corridor. The project area is mostly parking with a small building footprint. The property owner is excited about redevelopment opportunities inline with the Design and Connectivity Plan. “Encourage buildings of two more stories to increase density” (Page 2 Design and Connectivity Plan). The existing single level building would be replaced with a multi-story, mixed use building with potential housing above, which would anchor the existing corner of N 7th Ave and W Villard Street. “Provide Mixed Use Development” (Page 5 Design and Connectivity Plan) The proposed new mixed use building would provide commercial activities and potentially residential uses which would contribute to making North 7th Avenue its own neighborhood. “The intent of the B-2M community business district—mixed is to function as a vibrant mixed-use district that accommodates substantial growth and enhances the character of the city.” (Midtown Zoning Text Amendments). With high-density housing and supportive commercial uses planned within a walkable area to serve the needs of the residents, this property and its proposed redevelopment are consistent with the intent and purpose of the newly created Zoning District. Additionally, the potential inclusion of offices, small scale retail and restaurants further the overall goals of the district and endeavor to create a sense of vitality and community. 319 N Seventh Avenue 4) An estimated timeline indicating benchmarks for completing technical evaluation, beginning the project and completing the project. DATE ITEM 9/28/16 Submit Grant Application 11/1/16 Projected Start Date 11/01/16 - 02/01/17  Parking and Site Analysis  Building Code Research  Unified Development Ordinance Analysis  Municipal Review Processes Analysis  Conceptual Site and Building Design Analysis  Engineering Assessments  Preliminary Cost Estimates  Exploration of Development Scenarios & Conceptual Designs  Conceptual Tenant Configurations  Scenario Planning 02/01/17 - 02/15/17 Draft Review and Revisions 02/30/17 Estimated Completion of Grant Funded Report* * Data and Information from the Grant Project Steps will be utilized in important decision making and forward progress prior to final submittal. 319 N Seventh Avenue Site N Aerial Site Image Image Source: Bozeman GIS Dept. Site Map 319 N Seventh Avenue Photo 1 Photo 2 Site Photographs 319 N Seventh Avenue Photo 3 Photo 4 319 N Seventh Avenue