HomeMy WebLinkAbout319 N 7th TAG Application Supplement319 N Seventh Avenue
Technical Assistance Grant Application
October 2016
North Seventh Urban Renewal District | Redevelopment Incentive Program
1) Project Description
The existing building and site located at 319 North Seventh Avenue is an ideal candidate for
the North Seventh Urban Renewal District Redevelopment Incentive Programs. The subject
property is located within the North Seventh Tax Increment District and would be consistent
with the Design and Connectivity Plan (DCP), the Design Objectives Plan, the Bozeman
Community Plan and the Unified Development Code.
The property was used by The Wok (restaurant) until the Fall of 2015. The existing building is
currently vacant. The team would like to explore the redevelopment of their property, through
the demolition of the existing building and the design/construction of a new mixed-use
building. The new mixed-use building would be consistent with the newly adopted B-2M
(Community Business District—Mixed) and would potentially include main level restaurant
and retail space, along with offices and residential above on subsequent levels above grade.
This Technical Assistance Grant would specifically explore the following:
Parking and Site Analysis
Building Code Research
Unified Development Ordinance Analysis—’Midtown’ Code Changes
Municipal Review Processes Analysis
Conceptual Site and Building Design Analysis
Engineering Assessments, if needed
Preliminary Cost Estimates
Exploration of Development Scenarios & Conceptual Designs
Conceptual Tenant Configurations
Scenario Planning
The client requests the full amount ($7,200) be applied to this project. The owner is also
applying for the demolition funding through the North Seventh Urban Review District.
Client: Jon Pine
200 Jeana Lei Court
Bozeman, MT 59715
Applicant/Representative: Intrinsik Architecture, Inc
111 N Tracy Ave
Bozeman, MT 59715
319 N Seventh Avenue
2) Technical Assistance—Firm Experience
The property owners would like to retain Intrinsik Architecture, Inc. to collaborate with on
their potential property redevelopment. Intrinsik Architecture, Inc. specializes in professional
planning, architectural design and building. Over the past 13 years, Intrinsik has distinguished
itself as a very unique studio with an emphasis in projects that embody and preserve the spirit
of clients, the project and the place.
Intrinsik has completed over 20 Technical Assistance Grants for the Downtown Bozeman
Partnership. Some of the more notable Technical Assistance Grants which lead to actual
projects include the Downtown Community Co-Op, the Thrive building remodel and façade
improvements, the Baxter Hotel Sign and most recently the Bozeman Taproom and Fill
Station. While everyone on the Design team will contribute to this project, Rob Pertzborn will
serve as the Project Principal and Henri Foch will serve as the Project Manager.
As a registered Montana architect and a practicing planner, Rob Pertzborn bridges the gap
between buildings and neighborhoods. Rob has worked in design and planning for the past 20
years and has a wide range of experience ranging from historic civic and commercial
renovations to land and municipal facilities planning to designing infill urban mixed use
projects and residences. Rob specializes in big picture thinking and master planning to assure
timely, quality and sustainable projects for the client, future residents and users, and the
greater community. Rob is from Madison, Wisconsin and has lived in the Twin Cities before
settling in Bozeman in 1989. Rob holds a Master of Architecture degree from Montana State
University.
Henri is a registered Architect, LEED AP and Project Manager at Intrinsik. He graduated from
Drury University in Springfield, Missouri with a Bachelor of Architecture. An initial venture in
furniture making and residential design-build led Henri to Bozeman in 2002 where he soon
connected with Intrinsik Architecture. Initially alternating between construction, steel
fabrication, and architecture he now works on a broad range of architectural projects from
residential to commercial. Henri places a strong emphasis on craft and quality through the
design and detailing of our projects.
319 N Seventh Avenue
3) Prospective project would support the Design and
Connectivity Plan (DCP), the Design Objectives Plan,
the Bozeman Community Plan and the Unified
Development Code.
Site redevelopment would support the Design and Connectivity Plan (DCP), the Design
Objectives Plan, the Bozeman Community Plan and the Unified Development Code as follows:
“Encourage the rehabilitation and redevelopment of parcels that are underutilized... (Page 2
Design and Connectivity Plan).
This building and site is a prime example of an underutilized and underdeveloped site which
makes it a perfect candidate for a Technical Assistance Planning grant. The existing structure
is old and outdated. While the building currently is well positioned on the site, close to the
street, the property owner is preparing to remove the building and make room for a more
visually interesting and contributing building that interacts with the corridor. The project area
is mostly parking with a small building footprint. The property owner is excited about
redevelopment opportunities inline with the Design and Connectivity Plan.
“Encourage buildings of two more stories to increase density” (Page 2 Design and
Connectivity Plan).
The existing single level building would be replaced with a multi-story, mixed use building with
potential housing above, which would anchor the existing corner of N 7th Ave and W Villard
Street.
“Provide Mixed Use Development” (Page 5 Design and Connectivity Plan)
The proposed new mixed use building would provide commercial activities and potentially
residential uses which would contribute to making North 7th Avenue its own neighborhood.
“The intent of the B-2M community business district—mixed is to function as a vibrant
mixed-use district that accommodates substantial growth and enhances the character of the
city.” (Midtown Zoning Text Amendments).
With high-density housing and supportive commercial uses planned within a walkable area to
serve the needs of the residents, this property and its proposed redevelopment are consistent
with the intent and purpose of the newly created Zoning District. Additionally, the potential
inclusion of offices, small scale retail and restaurants further the overall goals of the district
and endeavor to create a sense of vitality and community.
319 N Seventh Avenue
4) An estimated timeline indicating benchmarks for
completing technical evaluation, beginning the
project and completing the project.
DATE ITEM
9/28/16 Submit Grant Application
11/1/16 Projected Start Date
11/01/16 - 02/01/17 Parking and Site Analysis
Building Code Research
Unified Development Ordinance Analysis
Municipal Review Processes Analysis
Conceptual Site and Building Design Analysis
Engineering Assessments
Preliminary Cost Estimates
Exploration of Development Scenarios & Conceptual Designs
Conceptual Tenant Configurations
Scenario Planning
02/01/17 - 02/15/17 Draft Review and Revisions
02/30/17 Estimated Completion of Grant Funded Report*
* Data and Information from the Grant Project Steps will be utilized in important decision making
and forward progress prior to final submittal.
319 N Seventh Avenue
Site
N
Aerial Site Image Image Source: Bozeman GIS Dept.
Site Map
319 N Seventh Avenue
Photo 1
Photo 2
Site Photographs
319 N Seventh Avenue
Photo 3
Photo 4
319 N Seventh Avenue