HomeMy WebLinkAbout602 N 7th TAG Application Supplement602 N 7th Avenue
Technical Assistance Grant Application
October 2016
North Seventh Urban Renewal District | Redevelopment Incentive Program
Project Description
The project site located at 602 North Seventh Avenue is an excellent candidate for the North
Seventh Urban Renewal District Redevelopment Incentive Programs. Verizon Wireless
currently operates in the existing building on the property. A pad site is available to be
developed on the eastern portion of the property between the existing parking and the
Verizon Wireless store along W Peach Street. The subject property is located within the North
Seventh Tax Increment District and would be consistent with the Design and Connectivity Plan
(DCP), the Design Objectives Plan, the Bozeman Community Plan and the Unified Development
Code.
The project is proposed to research and explore development scenarios and designs for the
pad site. The applicant is currently under contract for the purchase of the pad site. The new
building would be consistent with the B-2M (Community Business District—Mixed) and would
include a mixed-use building with potential for multiple commercial spaces.
This Technical Assistance Grant would explore the following:
Parking and Site Analysis
Building Code Research
Unified Development Ordinance Analysis—’Midtown’ Code Changes
Conceptual Site and Building Design Analysis
Engineering Assessments, if needed
Preliminary Cost Estimates
Exploration of Development Scenarios & Conceptual Designs
Conceptual Tenant Configurations
Scenario Planning
Municipal Review Processes Analysis
The client requests the full amount ($7,200) be applied to this project.
Client: John Colter, LTD
100 N.E. Loop 410, Suite 1300
San Antonio, TX 79216
Applicant/Representative: Intrinsik Architecture, Inc
111 N Tracy Ave
Bozeman, MT 59715
602 N 7th Avenue
Prospective project would support the Design and Connectivity Plan (DCP), the
Design Objectives Plan, the Bozeman Community Plan and the Unified
Development Code.
Site development would support the Design and Connectivity Plan (DCP), the Design
Objectives Plan, the Bozeman Community Plan and the Unified Development Code as follows:
“Encourage the rehabilitation and redevelopment of parcels that are underutilized... (Page 2
Design and Connectivity Plan).
This site is a prime example of an underutilized site which makes it a perfect candidate for a
Technical Assistance Planning grant. The pad site has been available without any
development. With the background work performed with the assistance to the grant, the pad
site will be more likely to move forward with a development project. Additionally, the
property is the perfect location for infill development within Midtown.
“Develop the corridor as a focus for commercial and entertainment activities that serve
residents and visitor alike” (Page 5 Design and Connectivity Plan).
The pad site owner is interested in providing commercial services for Bozeman residents. The
goal of utilizing Grant funding is to envision commercial needs and create vital services in the
burgeoning Midtown District.
“Strengthen the corridor as a neighborhood service center with new development along the
corridor should be “double-fronted,” relating to the neighborhoods as well as the
avenue.” (Page 5 Design Connectivity Plan)
The development of the pad site will create important infill within the Midtown District and
will relate to the W Peach neighborhood as much as to the N 7th area due to its location.
“The intent of the B-2M community business district—mixed is to function as a vibrant
mixed-use district that accommodates substantial growth and enhances the character of the
city.” (Midtown Zoning Text Amendments).
The new quality infill project which would ultimately contribute to the revitalization of the
overall district and help the transition from vehicle dominated thorough-fare to a more
pedestrian orientated neighborhood.
602 N 7th Avenue
Project Schedule
DATE ITEM
9/28/16 Submit Grant Application
11/01/16 Projected Start Date
11/01/16 - 02/01/17 Parking and Site Analysis
Building Code Research
Unified Development Ordinance Analysis
Municipal Review Processes Analysis
Conceptual Site and Building Design Analysis
Engineering Assessments
Preliminary Cost Estimates
Exploration of Development Scenarios & Conceptual Designs
Conceptual Tenant Configurations
Scenario Planning
02/01/17 - 02/15/17 Draft Review and Revisions
02/30/17 Estimated Completion of Grant Funded Report*
* Data and Information from the Grant Project Steps will be utilized in important decision making
and forward progress prior to final submittal.
602 N 7th Avenue
Technical Assistance—Firm Experience
The potential future owners of the pad site would like to retain Intrinsik Architecture, Inc. to
collaborate with on their potential property development. Intrinsik Architecture, Inc.
specializes in professional planning, architectural design and building. Over the past 17 years,
Intrinsik has distinguished itself as a very unique studio with an emphasis in projects that
embody and preserve the spirit of clients, the project and the place.
Intrinsik has completed over 20 Technical Assistance Grants for the Downtown Bozeman
Partnership. Some of the more notable Technical Assistance Grants which lead to actual
projects include the Downtown Community Co-Op, the Thrive building remodel and façade
improvements, the Baxter Hotel Sign and most recently the Bozeman Taproom and Fill
Station. While everyone on the Design team will contribute to this project, Rob Pertzborn will
serve as the Project Principal and Peter Andrews will serve as the Project Manager.
As a registered Montana architect and a practicing planner, Rob Pertzborn bridges the gap
between buildings and neighborhoods. Rob has worked in design and planning for the past 20
years and has a wide range of experience ranging from historic civic and commercial
renovations to land and municipal facilities planning to designing infill urban mixed use
projects and residences. Rob specializes in big picture thinking and master planning to assure
timely, quality and sustainable projects for the client, future residents and users, and the
greater community. Rob is from Madison, Wisconsin and has lived in the Twin Cities before
settling in Bozeman in 1989. Rob holds a Master of Architecture degree from Montana State
University.
Peter is a registered architect, LEED AP and Project Manager at Intrinsik. His unique journey to
Architecture (beginning with a bachelor’s degree from Boston College, a volunteer year with
the Jesuit Volunteer Corps, and a fellowship with Architecture for Humanity all the way to
receiving his Master of Architecture from Montana State University) contributes to our
eclectic and multidisciplinary approach to design. His experience includes a wide variety of
projects including single household residential projects, multi-family and commercial work.
602 N 7th Avenue
N
Aerial Site Image Image Source: Bozeman GIS Dept.
Site Map
602 N 7th Avenue
Verizon Building Along N 7th Ave
Pad Site Located along W Peach Street
Site Photographs
602 N 7th Avenue
W Peach and Pad Site
View of South Property
602 N 7th Avenue
Pad Site—View from behind Verizon
View of North Elevation & Property
602 N 7th Avenue