HomeMy WebLinkAbout16- Amendment 2 to Task Order 1 - DOWL - Right of Way Acquisition ServicesAMENDMENT #2
TO
TASK ORDER NUMBER 01
Issued under the authority of Professional Services Master Task Order Agreement between the City of
Bozeman and DOWL for: Professional and technical services for the acquisition of right ofwad
easements and real property to allow for the construction of various street and utilities
improvements within the City of Bozeman
This Amendment to Task Order No. 2 is dated March 25, 2016 between City of Bozeman (City) and
DOWL (Contractor).
The following representatives have been designated for the work performed under this Task Order:
City: Rick Hixson, P.E.
Contractor: Tony Gaddo, P.E.
SCOPE OF WORK:
The scope of work for Task Order No. 1 -Amendment #2 is detailed in the attached Project Scope of Services.
COMPENSATION:
Contractor shall be reimbursed on a time and materials basis for the additional services with the original
budget increased by $11,625.00, to a revised total cost not to exceed $157,327.50. The total cost for Task
Order No. 1 -Amendment #2 is detailed in the attached Project Cost Estimate. Contractor shall invoice no
more often than monthly for services provided in the prior month.
The provisions of the Professional Services Master Task Order Agreement and any Special Terms and
Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work.
IN WITNESS WHEREOF, the parties authorized to commit resources of the companies have executed this
Task Order:
City of Bozeman
By:
Title: cl-r!� A�aGC
Date: 1 19-16
Contractor
By:
Title: rl ° i cc r � vw r ✓
Date:
Fed. ID. No. 92-0166301
March 25, 2016
Professional Services Agreement for Streets and Utilities Land Agent Services
Project Scope of Services
Task Order No. 1
Amendment #2
The scope of services for this City of Bozeman Right -of -Way Acquisition Project is to Appraise,
Acquire and successfully conduct and prepare the necessary meetings, agreements, and legal
documents to transfer property titles from private land owners to the City of Bozeman (City).
The City will be constructing new road and utility improvements in the near future and intends to
acquire the necessary right-of-way (R/W) prior to construction. This Task Order No. 1 -
Amendment #2 will serve as the R/W acquisition process for the future road and intersection
improvements at the intersection of Davis Lane and Baxter Lane and along Baxter Lane from
Davis Lane to North 19th Avenue in Bozeman, Montana.
For this R/W acquisition project amendment, DOWL will conduct an appraisal for Parcel 10
instead of a waiver valuation. Project design changes increased the area of acquisition required,
necessitating a full appraisal report be completed. In addition, DOWL will work with Parcel 4 to
create a separate waiver valuation and agreement to remove trees on the south side of Baxter
Lane that are in the boulevard area, installed by the property owner. Design changes included a
turn lane that requires the removal of the tree and adjustment to the existing underground
irrigation system.
The intent of this scope of services and corresponding cost estimate is to provide acquisition
services on a time and materials, not to exceed basis. Additional costs related to the actual land
purchase price, relocation costs paid to property owners, and any costs associated with eminent
domain proceedings are not included in this scope of services or cost estimate.
The following activities will be conducted for Amendment 42 as outlined below in addition to
the activities outlined in the original task order.
1_0 PROJECT RESEARCH
• Additional work is not included in this scope.
2_0 INITIAL PROPERTY OWNER CONTACT
Initiate contact with the property owner of Parcel 4 regarding a new agreement to
remove trees.
3_0 SURVEY
• Additional work is not included in this scope.
Page 1 of 3
E)OWL
March 25, 2016
4_0 R/W MAPPING & EXHIBITS
• Prepare additional preliminary deed exhibits for Parcel 10 and figures for Parcel 4.
• The final deed exhibits will be filed with the clerk and recorder upon finalization of
acquisition agreements
• QA/QC of deliverables
Deliverables:
• Preliminary deed exhibits
5_0 TITLE COMMITMENTS
• Additional work is not included in this scope.
6_0 APPRAISALS AND REVIEW APPRAISALS
• An appraisal report will be prepared for Parcel 10.
• An appraisal review will be conducted for each appraisal report by a second appraisal
subconsultant.
• A waiver valuation will be prepared for Parcel 4 to compensate for the trees.
• Team coordination
• QA/QC of appraisal report
7_0 PREPARE CONTRACTS
• Prepare preliminary acquisition document for Parcel 4
• Prepare preliminary acquisition costs for Parcel 4
• QA/QC of deliverables
Deliverables:
• Preliminary acquisition documents including costs
8_0 ACQUISITIONS
• Conduct pre-acquisition meetings
• Conduct meetings with property owners
• Prepare final acquisition documents
• Prepare final acquisition costs
• QA/QC of deliverables
Deliverables:
• Final acquisition documents including costs
9_0 R/W AND DESIGN PLAN UPDATES
• Additional work is not included in this scope.
Page 2 of 3
BOWL
March 25, 2016
10.0 RELOCATION SERVICES
• Additional work is not included in this scope.
11.0 CLOSING
Additional work is not included in this scope.
12.0 FINAL SUBMITTAL AND CLOSEOUT
0 Additional work is not included in this scope.
CONTINGENCY
Due to the nature of property acquisition work, the time required to work with individual
property owners varies significantly. The scope of services as detailed in this document includes
all the necessary steps to acquire property from private owners, but much of that work relies on
good cooperation and timely responses from all parties. The contingency item serves to capture
the possible additional costs incurred during the acquisition process due to challenging situations
with property owners.
Page 3 of 3
D OWL
rCity of Bozeman R/W Acquisition: Task Order No. 1 Project Cost Estimate --Baxter and Davis --Amendment #2
DATE: 3/25/2016
PROJECT NO: 4524.11402.01
EST. PREPARED BY: DOWL
PAY SCH.: Time and Materials --NTE
Activity
Tasks
Total Hours
Real Estate
Manager
Project
Manager/
Coordinator
Right of Way
Agent
Title
Specialist
Assistant
Coordinator
Professional
Surveyor
Survey Crew
Clerical
WORK TO BE COMPLETED
1.0 PROJECT RESEARCH
0
o
0
NotApplicable
0
SUBTOTAL(HOURS)
0
0
0
0 0
0
0
0
0
2.0 INITIAL PROPERTY OWNER CONTACT
Initiate contact with Parcel 4
2
2
0
SUBTOTAL(HOURS)
2
0
2
0 0
0
0
0
0
3.0 SURVEY
Not Applicable
SUBTOTAL (HOURS)
0
0
0
0 0
0
0
0
0
4.0 RAN MAPPING & EXHIBITS
Prepare preliminary deed exhibit
4
4
QA/QC of Deliverables
2
1
1
SUBTOTAL(HOURS)
6
1
5
0 0
0
0
0
0
5.0 TITLE COMMITMENTS
Secure Title Commitments (11)
0
Team Coordination
0
Not Applicable
SUBTOTAL(HOURS)
0 1
0
0
0 0
0
0
0
0
6.0 APPRAISALS AND REVIEW APPRAISALS
Conduct Appraisal
2
2
Conduct Review Appraisal
1
1
Conduct Waiver Evaluation
4
2
2
Team Coordination
1
1
QA/QC
2
1
1
SUBTOTAL(HOURS)
10
1
7 1
0 2
0
0
0
0
7.0 PREPARE CONTRACTS
Prepare Preliminary Acquisition Document
3
2
1
Prepare Preliminary Acquisition Costs
3
2
1
QA/QC of Deliverables
2
1
1
SUBTOTAL(HOURS)
8
1
5
0 2
0
0
0
0
8.0 ACQUISITIONS
Conduct pre-acquisition meetings
2
2
Conduct Owner Meetings
4
4
Prepare Final Acquisition Documents
5
4
1
Prepare Final Acquisition Costs
1
1
QA/QC of Deliverables
2
1
1
SUBTOTAL (HOURS)
14 1
1
12
0 1
0
0
0
0
9.0 RAN AND DESIGN PLAN UPDATES
Update Preliminary Deed Exhibits
0
NotApplicable
SUBTOTAL(HOURS) 1
0 1
0
0
0 0
0
0
0
0
10.0 RELOCATION SERVICES
Provide Property Relocation
NotApplicable
SUBTOTAL(HOURS)
0
0
0 1
0 1 0
0
0
0
0
0 0 W L Page 1 of 2
11.0 CLOSING _--
---_--�
--
Prepare Final Title Transfer Documents
0
Closing Meetings
QA/Qc
o
o
Not Applicable
SUBTOTAL(HOURS)
0
0
0 1 0 0 0 0
0 0
12.0 FINAL SUBMITTAL AND CLOSEOUT
Deliver Completed Title Transfer Documents
Project Closeout
0
o
Not Applicable
QA/QC of Deliverables
0
SUBTOTAL (HOURS)
0
1 0
0 0 0 0 0
0 0
CONTINGENCY
Negotiation Challenges
8
8
Total Project Hours
48
4
39 0 5 0 0
0 0
COST SUMMARY
DIRECT LABOR
Hours
Rate
Extension
Real Estate Manager
4 150.00
600.0
Project Manager/ Coordinator
39 105.00
4,095.0
Right of Way Agent
0 140.00
0.0
Title Specialist
5 105.00
525.0
Assistant Coordinator
0 120.00
0.0
Professional Surveyor
0 130.00
0.010
Survey Crew
0 225.00
0.0
Clerical
0 55.00
0.0
TOTAL HOURS1
1
48
TOTAL LABOR
$5,220.0
DIRECT NONLABOR
Miscellaneous (Blueline prints, mylars, multilith paper, telephone,
postage, misc. equipment rental, maps, photos, survey mtis., display boards, etc.)
Unit
Quantity Rate
Computer
Hours
Per Hour
0.0
Title commitments
Each
Per Parcel
0.0
Vehicle Rental
Days
Per Day
0.0
Mileage
Miles
30 Per Mile $1.00
30.0
Airline Trips
Trips
Per Trip
0.0
Lodging
Days
Per Day
0.0
Meals
Days
Per Day
0.0
TOTAL DIRECT NONLABOR
$30.0
OUTSIDE SERVICES AND SUBCONTRACTS LUMP SUM
RM Appraisals Hall-Widdoss-1
4,250.0
RM Review Appraisals Thomas Appraisals -1)
2,125.0
TOTAL OUTSIDE SERVICES AND SUBCONTRACTS
$6,375.0
RECAPITULATION
Total Direct Labor
5,220.0
Total Direct NonLabor
30.0
Total Outside Services & Subcontracts
6,375.0
TOTAL ESTIMATED AMENDMENT #2 COST NTE
$11,625.0
TOTAL CURRENT CONTRACT COST NTE
$145,702.5
TOTAL ESTIMATED COST (NTE)
$157,327.5