HomeMy WebLinkAbout16- Contract Agreement - Duneman Construction Inc. - Stormwater Treatment UnitsCONTRACT AGREEMENT
THIS CONTRACT AGREEMENT is dated as of the 121-l" day of k e1in the year 2016 by
and between CITY OF BOZEMAN hereinafter called OWNER and Duneman Construction Inc.,
hereinafter called CONTRACTOR.
OWNER AND CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract. The Project
Work is generally described as follows:
1.1 Installation of an inline stormwater mechanical separation unit at N. 11th and W. Lamme
as detailed in the construction drawings.
1.2 Installation of an inline stormwater mechanical separation unit and bypass channel at S.
Rouse and E. Lincoln as detailed in the construction drawings.
1.3 Site restoration and all labor, equipment, and materials necessary for or incidental to
completing the work.
Article 2. CONTRACT TIME.
2.1 The Work will be completed within 30 calendar days after the date the written notice to
proceed is issued. Final payment will be withheld until final completion and acceptance of the
work as stipulated in this Agreement.
Article 3. CONTRACT PRICE.
3.1 OWNER shall pay CONTRACTOR for performance of the Base Bid Work in accordance
with the Contract Documents the sum of Seventy Six Thousand Four Hundred and Forty Dollars
($76,440).
Article 4. PAYMENT PROCEDURES.
CONTRACTOR shall submit applications for payment in accordance with the Montana Public
Works Standard Specification, Sixth Edition General Conditions. Applications for payment will
be processed as provided in the General Conditions.
1
4.1 Payment. Upon satisfactory final completion and acceptance of the Work in accordance with
the General Conditions, OWNER shall pay the full contract price.
4. 1.1 Measurement and Payment. Payment for the work satisfactorily completed in accordance
with this contract shall be made in one lump sum payment.
No item that is required by Contract for the proper and successful completion of the Work will
be paid for outside of or in addition to the prices submitted in the contract. All work not
specifically set forth as a pay item herein shall be considered a subsidiary obligation of the
CONTRACTOR and all costs in connection therewith shall be included in the contract price.
Article 5. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following
representations:
5.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, Work, locality, and with all local conditions and federal, state and local laws,
ordinances, rules and regulations that in any manner may affect cost, progress or performance of
the Work.
5.2 CONTRACTOR has studied carefully all reports of investigations and tests of subsurface
and latent physical conditions at the site or otherwise affecting cost, progress or performance of
the Work.
5.3 CONTRACTOR has made or caused to be made examinations, and investigations as he
deems necessary for the performance of the Work at the contract price, within the contract time
and in accordance with the other terms and conditions of the Contract Documents, and no
additional examinations, investigations, tests, reports or similar data are or will be required by
CONTRACTOR for such purposes.
5.4 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract Documents.
Article 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR as attached to or referenced in this Agreement, are made a part hereof and
consist of the following:
6.1 This Agreement.
6.2 Certificates of Insurance and Performance and Payment Bonds.
2
6.3 Montana Public Works Standard Specifications (MPWSS), Sixth Edition, and as further
amended by the City of Bozeman Modifications to MPWSS (by reference).
6.4 Notice to Proceed.
6.5 Bozeman Stormwater Quality Improvements West Lamme Outfall and East Lincoln
Outfall Plans and Specifications
There are no Contract Documents other than those listed above in this Article 6.
The Contract Documents may only be altered, amended or repealed by a modification (as
defined in the Montana Public Works Standard Specifications, Sixth Edition, General
Conditions).
Article 7. GENERAL REQUIREMENTS.
7.1 Contractor Use of Premises. The CONTRACTOR shall confine his operations at site of the
proposed work to within the right-of-way or construction easements provided.
It shall be understood that the responsibility for protection and safekeeping of equipment and
materials on or near the site will be entirely that of the CONTRACTOR and that no claim shall
be made against the OWNER by reason of any act of an employee or trespasser. It shall be
further understood that should any occasion arise necessitating access by the OWNER to the
sites occupied by these stored materials and equipment, the CONTRACTOR owning or
responsible for the stored materials or equipment shall immediately remove same. No materials
or equipment may be placed upon any private property until the property OWNER has agreed in
writing to the location contemplated by the CONTRACTOR to be used for storage.
7.2 Protection of Existing Structures. The CONTRACTOR shall be solely responsible for
locating all existing underground installations, including service connections, in advance of
excavating or trenching, by contacting the OWNERS thereof and prospecting. The
CONTRACTOR shall use his own information and shall not rely solely upon information shown
on the drawings concerning existing underground installations. The CONTRACTOR shall repair
all damage to existing utilities or property at his own expense. The CONTRACTOR shall, at a
minimum, call the "One -Call" utility locate system (Phone: 1-800-424-5555) at least 72 hours in
advance of starting construction.
Where excavation will be required adjacent to existing structures, the CONTRACTOR shall be
solely responsible to maintain the structural integrity of the existing structures. The
CONTRACTOR shall take whatever means necessary to insure that the existing structure is not
damaged and if necessary shall install sheet piling. The CONTRACTOR shall repair all damage
to the existing structures at his own expense. Any fences destroyed during construction shall be
repaired to the satisfaction of the property owner. Any delay, additional work, or extra cost to
N
the CONTRACTOR caused by existing underground installations shall not constitute a claim for
extra work, additional payment or damages.
7.3 Protection of Existing Mailboxes, Curbs and Gutters and Driveways, etc. The
CONTRACTOR shall take whatever means necessary to insure that the existing mailboxes,
curbs and gutters and driveways, and other public or private improvements are not damaged
during construction. If it is necessary to remove or disturb mailboxes during construction, the
CONTRACTOR shall repair and restore the mailboxes at his own expense to the satisfaction of
the property owner. Any curb, gutter, or driveways damaged during construction, not noted to
be replaced on the drawings, shall be replaced by the CONTRACTOR at his own expense.
7.4 Surface Drainage. Water from such sources as surface runoff, dewatering and flushing of
water lines during project construction shall not be allowed to enter into drainage ways or open
areas that will cause flooding of existing structures, street intersections, or lawn areas.
7.5 Work Sequence. The CONTRACTOR shall schedule the work to minimize inconvenience
to the OWNER and to adjacent property owners and to minimize interruptions to utility service.
This shall include minimizing obstruction to local traffic especially on dead end streets. Work
shall be scheduled so as to minimize disruptions to local mail delivery. Close coordination will
be required between the CONTRACTOR, OWNER, and COUNTY. The utility service
companies such as power, gas, telephone, and video shall be contacted at least 72 hours in
advance of when locating of services will be required.
Article 8. Warranty and Guarantee.
8.1 CONTRACTOR warrants and guarantees to OWNER that all Work will be in accordance
with the Contract Documents and will not be defective. Prompt notice of all defects shall be
given to CONTRACTOR. All defective Work, whether or not in place, may be rejected,
corrected or accepted as provided in the Montana Public Works Standard Specification, Sixth
Edition (MPWSS).
Article 9. Traffic Control.
9.1 The CONTRACTOR shall conduct his work so as to interfere as little as possible with
public travel, whether vehicular or pedestrian. Whenever it is necessary to cross, obstruct, or
close roads and walks, the CONTRACTOR shall obtain approval of such actions from the
appropriate road agency and shall provide and maintain suitable and safe lighted detours or other
temporary expedients for the accommodation of public and private travel in accordance with the
current edition of the Manual on Uniform Control Devices for Streets and Highways (MUTCD).
The CONTRACTOR shall not occupy the work site or initiate construction until all traffic
control provisions are in place and the OWNER has been so notified.
9.2 Safety Provisions. Safety provisions must be entirely adequate and meet with City, County,
State and Federal regulations to protect the public on these streets and roads.
4
9.3 Barricades and Lights. Prior to the start of construction across roads or walks, all
construction permits shall be obtained, utility companies notified, and traffic patterns, signing,
location of flagmen, barricades and other safety measures arranged. Providing and maintaining
safety barricades, and other work site safety measures shall be the responsibility of the
CONTRACTOR and shall be included in the contract price. The CONTRACTOR shall
cooperate and coordinate his methods with the OWNER'S traffic control plans prior to the
disruption of the normal flow of any traffic.
All open trenches and other excavations shall be provided with suitable barriers, signs, and lights
to the extent that adequate protection is provided to the public. Obstructions, such as material
piles and equipment, shall be provided with similar warning signs and lights.
All barricades and obstructions shall be illuminated by means of warning lights from sunset to
sunrise. Materials stored upon or alongside public streets and highways shall be provided with
similar warning signs and lights.
All barricades, signs, lights and other protective devices shall be installed and maintained in
conformity with applicable statutory requirements and, where within railroad and highway right-
of-way, as required by the authority having jurisdiction thereover.
Work performed within property under the OWNER'S jurisdiction shall have all barricades,
signs, lights and protective devices installed and maintained.
Article 10 STATE LAWS AND REGULATIONS.
10.1 All applicable laws, ordinances and the rules and regulations of all authorities having
jurisdiction over construction of the project shall apply to the contract throughout.
10.1.1 MONTANA CONTRACTOR REGISTRATION REQUIREMENTS No bids will be
considered that do not carry the Bidder's Certificate of Contractor's Registration number on the
envelope containing the Bid and on the Bid. Information pertaining to the Montana Contractor
Registration requirements may be obtained from the Montana State Department of Revenue,
Helena, Montana. (1-800-556-6694)
10. 1.2 ADDITIONAL CONTRACTOR LICENSE FEE (MONTANA CONTRACTORS
GROSS RECEIPTS TAX) In accordance with Title 15, Chapter 50, MCA, the Owner shall
withhold, in addition to other amounts withheld as provided by law or specified herein, 1 percent
(1%) of all payments due the Contractor and shall transmit such moneys to the Montana
Department of Revenue.
10.1.3 The CONTRACTOR'S attention is called to the Industrial Accident Insurance laws in
force in Montana and to the responsibility of the OWNER for the collection of premiums
5
thereunder. The CONTRACTOR'S compliance with said laws is required and shall relieve the
OWNER of any responsibility for payment of premiums thereunder and shall furnish the
OWNER with satisfactory evidence showing that all premiums arising from this contract have
been paid before payment is made on the final estimate.
10. 1.4 LOCAL LABOR Contractor shall give preference to the employment of Montana
residents in accordance with applicable portions of Title 18, Chapter 2, Part 4, MCA.
10.1.5 PREVAILING WAGE RATES On all projects and contracts with the Owner in excess of
$25,000.00, Contractor and all subcontractors shall pay for all labor employed the standard
prevailing rate of wages. The standard prevailing rate of wages as used herein means that
standard prevailing rate of wages in the locality where the work is to be performed as determined
by the Montana Commissioner of Labor pursuant to MCA 18-2-402 and as bound herein. The
Contractor and subcontractors are directed to the Montana Commissioner of Labor for
information on the standard prevailing rate of wages applicable to this contract within this area.
Article 11. PERFORMANCE AND PAYMENT BONDS. The CONTRACTOR shall furnish a
Performance Bond and a Payment Bond in favor of the OWNER each in an amount equal to one -
hundred Percent (100%) of the Agreement amount.
Article 12. INSURANCE. Without limiting any of the other obligations or liabilities of the
CONTRACTOR, CONTRACTOR shall secure and maintain such insurance from an insurance
company (or companies) authorized to write insurance in the State of Montana, with minimum
"A.M. Best Rating" of B+, VI, as will protect himself, his subcontractors, the Owner and their
respective agents and employees from claims for bodily injury, death or property damage which
may arise from operations and completed operations under this Agreement. Such coverage shall
be written for claims arising out of all premises/ operations, sub -contracted operations,
products/completed operations, and all liability assumed by the CONTRACTOR under any
contract or agreement. CONTRACTOR shall not commence work under this Agreement until
such certified copies of the insurance policy shall have been filed with the OWNER. The City of
Bozeman shall be named as additional insured on any insurance certificates.
All insurance coverages shall remain in effect throughout the life of the Agreement.
Each insurance policy shall contain a clause providing that it will not be cancelled by the
insurance company without 30 days written notice to the OWNER and Engineer of intention to
cancel. The minimum amounts of such insurance coverages being as per Section SC -5.04,
Supplementary Conditions to the General Conditions, Montana Public Works Standard
Specifications, Sixth Edition, and included herein:
SC — 5.04 CONTRACTOR'S LIABILITY INSURANCE
Add the following new paragraphs immediately after Paragraph 5.04.B:
101
C. The limits of liability for the insurance required by Paragraph 5.04 of the General Conditions
shall provide coverage for not less than the following amounts or greater
where required by Law or Regulations:
Workers' Compensation, etc. under Paragraphs 5.04.1 and 5.04.2 of the General Conditions.
a. State Statutory
b. Applicable Federal (e.g. Longshoremans) Statutory
c. Employer's Liability $ 500,000.00
2. Contractor's Liability Insurance under Paragraphs 5.04.A.3 through 5.04. A.6 of the General
Conditions which shall also include completed operations and product liability coverage.
a. GENERAL AGGREGATE $ 3,000,000.00
b. Products -Completed
Operations Aggregate $ 3,000,000.00
c. Personal and Advertising
d. Each Occurrence
(Bodily Injury and
Property Damage) $ 1,000,000.00
e. Coverage will include:
1. Premises - Operations
2. Operations of Independent Contractor
3. Contractual Liability
4. Personal Injury
5. Products and Completed Operations
6. Broad Form Property Damage will include explosion,
collapse, blasting and underground where applicable.
7. Per Project Aggregate Endorsement
3. Automobile Liability under Paragraph 5.04.A.6 of the General Conditions:
a. Bodily Injury:
Each Person $ 500,000.00
Each Accident $ 1,000,000.00
(or)
Property Damage:
Each Accident $1,000,000.00
b. Combined Single Limit $ 1,000,000.00
Coverage to Include
1. All Owned
2. Hired
3. Non -Owned
7
4. Contractor's Liability Insurance under 5.04.A.3 through 5.04.A.6 may be satisfied by primary
insurance or a combination of primary and excess or umbrella insurance. Primary occurrence limit
cannot be less than $1,000,000.00. Deductible not to exceed $5,000.00 per occurrence on property
damage.
5. Add a new paragraph at the end of Paragraph 5.04.13. 1 of the General Conditions as follows:
The Contractor's insurance coverage shall name the Owner, and Engineer and Engineer's Consultants as
an additional insured under Commercial General Liability, Automobile Liability, Excess or Umbrella
polices.
6. The Contractual Liability coverage required by Paragraph 5.04.13.4. of the General Conditions shall
provide coverage for not less than the following amounts:
Each Occurrence $ 1,000,000.00
Aggregate $ 3,000,000.00
Article 13. MISCELLANEOUS.
13.1 Terms used in this Agreement which are defined in the General Conditions shall have the
meanings indicated in the General Conditions of the Montana Public Works Standard
Specifications, Sixth Edition.
13.2 This Agreement and all of the covenants hereof shall inure to the benefit of and be binding
upon the OWNER and the CONTRACTOR respectively and his partners, successors, assigns,
and legal representatives. Neither the OWNER nor the CONTRACTOR shall have the right to
assign, transfer or sublet his interest or obligations hereunder without written consent of the other
party. The Owner reserves the right to withdraw at any time from any subcontractor whose work
has proven unsatisfactory the right to be engaged in or employed upon any part of the Work.
13.3 In the event it becomes necessary for either party to this Agreement to retain an attorney to
enforce any of the terms or conditions of this Agreement or to give any notice required herein,
then the prevailing party or the party given notice shall be entitled to reasonable attorney's fees
and costs, including fees, salary, and costs of in-house counsel.
13.4 Any amendment of modifications of this Agreement or any provisions herein shall be made
in writing and executed in the same manner as this original document and shall after execution
become a part of the Agreement.
13.5 The CONTRACTOR hereby agrees to indemnify, defend, and hold the OWNER harmless
from all claims and liability due to the activities of CONTRACTOR, their agents, employees, or
both, in performing the work required.
The CONTRACTOR is and shall perform this agreement as an independent contractor, and as
such, is responsible to the OWNER only as to the results to be obtained in the work herein
specified, and to the extent that the work shall be done in accordance with the terms, plans and
specifications. The CONTRACTOR shall have and maintain complete control over all of its
employees, subcontractors, agents and operations, being responsible for any required payroll
deductions and providing required benefits, such as, but not limited to, workman's compensation
and unemployment insurance.
13.6 The Contractor agrees not to discriminate in the fulfillment of this Agreement on the basis
of race, color, religion, creed, sex, age, marital status, national origin, or actual or perceived
sexual orientation, gender identity or disability. The Contractor agrees this requirement shall
apply to the hiring and treatment of the Contractor's employees and to all subcontracts.
13.7 CITY OF BOZEMAN BUSINESS LICENSE All Contractors conducting work within the
City of Bozeman are required to have a current Business License. Applications for Business
Licenses may be obtained at City Hall, 121 N. Rouse Avenue, Bozeman, Montana.
I
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year
first above written.
Duneman Construction Inc.
(Contra��cct/tor)
By )t., .
Title
Montana Contragtor Registration Number l 5 Z
s
SEAL AND TTES
1111117,c- ®V
City of Bozeman
(Owner)
ByC_Q /A, :X�
Title City Manager
SEAL AND ATTEST,J a'� 0
` b
By
Title City Cler
k;.
10
Bozeman Storm Water Quality Improvements
DUNEMAN CONSTRUCTION, INC.
8670 TROOPER TRAIL
BOZEMAN, MT. 59715
Contact:
Phone:
Fax:
Quote To: CITY BOZEMAN Job Name:
ATTN: KYLE MEHRENS Date of Plans:
Phone: Revision Date:
Fax:
GRAND TOTAL $76,440.00
NOTES:
EXCLUDES:
1. SOILS/CONCRETE/ASPHALT TESTING
2. SITE SURVEY & LAYOUT
3. SWPPP
4. EROSION CONTROL
Page 1 of 1