Loading...
HomeMy WebLinkAbout16- Amendment 1 to Construction Contract - DLM Construction, Inc. - Bozeman Pond TOP Bond ProjectATTACHMENT A Amendment No. 1 to Construction Contract with DLM Construction, Inc. for Bozeman Pond Park Expansion Trails, Open Space, and Parks Bond Project THIS AGREEMENT is made as of this I ;01~day of , 2016, between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230 Bozeman, Montana, 59771-1230 (CITY) and DLM Contracting, Inc. whose address is 2066 Stadium Drive, Unit 201, Bozeman, Montana, 59715 (CONTRACTOR). WHEREAS, the parties have entered into an Agreement dated March 21, 2016 for construction services for the Bozeman Pond Park Expansion Project; and WHEREAS, revisions to the scope of services are necessary to complete the Project in accordance with the Master Plan approved by Commission; and WHEREAS, the parties desire to amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in Amendment No. 1 to Scope of Services for Bozeman Pond Park Expansion Project ("Exhibit A") are hereby incorporated in and made part of this agreement. Article 3 — Contract Price: Article 3 of the original agreement is modified to include $470,420 plus $25,784.95, for a contract total of $496,204.95 Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement. CITY OF BOZEMAN BY: C QhUA � GIugj Chris Kukulski City Manager DLM CONTRACTING, INC. BY: I Mo}�p $ _ LEWE S V P Authorized Signatory DATE: q —)Z-/,( DATE: ATTEST: 2 12v1 L -P DQE BY: - Robin Crough 0 City Clerk - •`f° ° I 8 CO. 2 12v1 L -P EXHIBIT A Additional Scope of Services Change Orders 13 Additi-I Sidewalk Near Drinking Founum so 5F I 51.00 I$ 400.00 11 50 a I`-. eR IOR ESTIIAATESMmmrmr- F=K-l:H11tJ UJA`_ $400.00 100 14 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT QUANTITY ANIOUN' QUANTITY AMOI.N- CUANTITY AMOUNT % 1 NO Pomrg Signs I Curl Pairton South FoMcrAveaue 1 LS SL40040 S 1,400.00 0.9 :1.260.00 0.1 S'40.00 350 SF 58.03 S 2,800.00 7 Paid by Additive Al[armlan2Mlca11.-.Work 1 l5 .4^n n,. $ 1,400.00 0.9 ..:i u�' U.1 I1 525,784.95 515.946.95 100 1 Chen a Water S,,,ie Line to 1.5"CU I tS 51,950,00 $ 1.950.00 $0.00 $0.00 1 1100 £1,950.00 1 $1.950.00 100 Paid b• Additive F, e2 Miscellaneous Work I LS SI -� $ (19rs000 3 Add SIF natte-Alt to Connect Curb Damp w/ Footbridge 1 LS S16C.00 5 160.00 1 $160.00 :"0.00 1 5160.00 'DD by Add Paid by AddPove Ntmrute al Mlsxl4noous Work 1 LS S 160.00) 1 $0.00' 1 100 4 8ndle Addhional Cosec 1 IS St?'an.Oc 7,496,00 50.00 7 51496.00 1 $1,d9690 100 Paid by AddlBve Alterrwte+2 MiscellanewWork 1 LS 5 1,490.00) $0.00 1 5 Import F10 for SuliFor-aeon 41 Cy 528.00 S 1,148.00 S0.00 41 $1,148.00 41 51,148.00 100 6 5ubesmvatlonlNoChmeei I LS 5000 5 $0.00 $0.03 - $0.00 0 T Chan es to Picnic ShelRr Fail sAdd'Con, 3Tota1 1 55970.00 $ 5,970.00 50.00 1 55.970.00 1 $5,970.00 too 8 Atld7donal Escavaibn for Fill Ma[enal I LS $1,310.00 S 1,380,00 1 $0.00 1 S1.380.00 1 $1,380.00 100 4 additional eerminl Plavlrountl 1 L5 $112.00 S 812.00 SO.00 1 $812.00 1 $812.00 100 10 Added Gravel Trail to DOE Park 1 LS $522.00 5 522.00 50.00 1 $522.00 1 $52200 100 11 Added No Parkml Anytime SIpIs 2 EA $650A0 S 1,300.00 2 57.300.00 50,00 2 51.300,00 100 31 Lara tree Clearing IN. Ch.,gel I LS I SD.00 I $ $0.00 $0.00 $0.00 0 13 Additi-I Sidewalk Near Drinking Founum so 5F I 51.00 I$ 400.00 11 50 $000, $0.00 50 $400.00 100 14 Larsdsca in Cnanp O+den 1 LS 1 $10.24695 Is 10.246.95 1_1 510.246.9 50.00 1 $10246.95 100 is Sod i LS $4.003.00 S 4,000.00 1 $4.000.00 $0.00 1 54,000.00 16 Additional Concrete Near Entrance of Dog Park 350 SF 58.03 S 2,800.00 7 $8.00 $0.00 1 58.00 Change Order Total 525,784.95 515.946.95 $9.838.00 $25,784.95 100