HomeMy WebLinkAbout16- Amendment 1 to Construction Contract - DLM Construction, Inc. - Bozeman Pond TOP Bond ProjectATTACHMENT A
Amendment No. 1 to Construction Contract with DLM Construction, Inc.
for
Bozeman Pond Park Expansion Trails, Open Space, and Parks Bond Project
THIS AGREEMENT is made as of this I ;01~day of , 2016, between
THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230 Bozeman, Montana,
59771-1230 (CITY) and DLM Contracting, Inc. whose address is 2066 Stadium Drive, Unit
201, Bozeman, Montana, 59715 (CONTRACTOR).
WHEREAS, the parties have entered into an Agreement dated March 21, 2016 for
construction services for the Bozeman Pond Park Expansion Project; and
WHEREAS, revisions to the scope of services are necessary to complete the Project in
accordance with the Master Plan approved by Commission; and
WHEREAS, the parties desire to amend the provisions of this Agreement.
NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS
CONTAINED HEREIN, the parties agree as follows:
The conditions and provisions set forth in Amendment No. 1 to Scope of Services for Bozeman
Pond Park Expansion Project ("Exhibit A") are hereby incorporated in and made part of this
agreement.
Article 3 — Contract Price:
Article 3 of the original agreement is modified to include $470,420 plus $25,784.95,
for a contract total of $496,204.95
Except as specifically amended herein, the original agreement shall remain in full force and effect
and the Parties shall be bound by all terms and conditions therein.
IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement.
CITY OF BOZEMAN
BY: C QhUA � GIugj
Chris Kukulski
City Manager
DLM CONTRACTING, INC.
BY:
I Mo}�p $ _ LEWE S V P
Authorized Signatory
DATE: q —)Z-/,( DATE:
ATTEST:
2
12v1 L -P
DQE
BY:
-
Robin Crough
0
City Clerk
- •`f°
° I 8
CO.
2
12v1 L -P
EXHIBIT A
Additional Scope of Services
Change Orders
13
Additi-I Sidewalk Near Drinking Founum
so 5F I
51.00
I$
400.00 11 50
a I`-.
eR IOR ESTIIAATESMmmrmr-
F=K-l:H11tJ UJA`_
$400.00 100
14
ITEM NO.
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
QUANTITY
ANIOUN'
QUANTITY
AMOI.N-
CUANTITY
AMOUNT
%
1
NO Pomrg Signs I Curl Pairton South FoMcrAveaue
1
LS
SL40040
S 1,400.00
0.9
:1.260.00
0.1
S'40.00
350 SF
58.03
S
2,800.00 7
Paid by Additive Al[armlan2Mlca11.-.Work
1
l5
.4^n n,.
$ 1,400.00
0.9
..:i u�'
U.1 I1
525,784.95
515.946.95
100
1
Chen a Water S,,,ie Line to 1.5"CU
I
tS
51,950,00
$ 1.950.00
$0.00
$0.00
1
1100
£1,950.00
1
$1.950.00
100
Paid b• Additive F, e2 Miscellaneous Work I LS SI -� $ (19rs000
3
Add SIF natte-Alt to Connect Curb Damp w/ Footbridge
1
LS
S16C.00
5 160.00
1
$160.00
:"0.00
1
5160.00
'DD
by Add
Paid by AddPove Ntmrute al Mlsxl4noous Work
1
LS
S 160.00)
1
$0.00'
1
100
4
8ndle Addhional Cosec
1
IS
St?'an.Oc
7,496,00
50.00
7
51496.00
1
$1,d9690
100
Paid by AddlBve Alterrwte+2 MiscellanewWork
1
LS
5 1,490.00)
$0.00
1
5
Import F10 for SuliFor-aeon
41
Cy
528.00
S 1,148.00
S0.00
41
$1,148.00
41
51,148.00
100
6
5ubesmvatlonlNoChmeei
I
LS
5000
5
$0.00
$0.03
-
$0.00
0
T
Chan es to Picnic ShelRr Fail sAdd'Con, 3Tota1
1
55970.00
$ 5,970.00
50.00
1
55.970.00
1
$5,970.00
too
8
Atld7donal Escavaibn for Fill Ma[enal
I
LS
$1,310.00
S 1,380,00
1
$0.00
1
S1.380.00
1
$1,380.00
100
4
additional eerminl Plavlrountl
1
L5
$112.00
S 812.00
SO.00
1
$812.00
1
$812.00
100
10
Added Gravel Trail to DOE Park
1
LS
$522.00
5 522.00
50.00
1
$522.00
1
$52200
100
11
Added No Parkml Anytime SIpIs
2
EA
$650A0
S 1,300.00
2
57.300.00
50,00
2
51.300,00
100
31
Lara tree Clearing IN. Ch.,gel
I
LS I
SD.00
I $
$0.00
$0.00
$0.00
0
13
Additi-I Sidewalk Near Drinking Founum
so 5F I
51.00
I$
400.00 11 50
$000,
$0.00
50
$400.00 100
14
Larsdsca in Cnanp O+den
1 LS 1
$10.24695
Is
10.246.95 1_1
510.246.9
50.00
1
$10246.95
100
is
Sod
i LS
$4.003.00
S
4,000.00 1
$4.000.00
$0.00
1
54,000.00
16
Additional Concrete Near Entrance of Dog Park
350 SF
58.03
S
2,800.00 7
$8.00
$0.00
1
58.00
Change Order Total
525,784.95
515.946.95
$9.838.00
$25,784.95 100