Loading...
HomeMy WebLinkAbout09-12-16 CC Mtg - NA1. Bridger Vale PUDPage 1 of 13 16274, Staff Report for the Bridger Vale PUD Concept Plan Review Date: City Commission meeting is on September 12, 2016 Design Review Board meeting is on July 13, 2016 Project Description: An optional concept review of a Planned unit Development (PUD) to allow a mixed residential and commercial development with relaxations to zoning regulations requested for park frontage, street design and a request for concurrent construction. The subdivision of one parcel into twenty residential lots, one commercial lot, one common open space lot, one City Park lot and associated streets and alleys is proposed. Project Location: Manley Road north of East Gallatin Recreation Area Recommendation: That the City Commission review and provide comments on the optional PUD concept plan review. Report Date: September 1, 2016 Staff Contact: Brian Krueger, Development Review Manager Agenda Item Type: Non-Action (Optional Concept Review) EXECUTIVE SUMMARY Project Summary This is an application for a concept planned unit development in order for the City to provide input to the applicant in preparation of a formal submittal. Application 16274 was requested by the applicant Ebbighausen Homes, inc., represented by C & H Engineering. The site lies due north of the East Gallatin Recreation Area (EGRA) and the Sunfish Park residential subdivision. The applicant proposed a growth policy amendment in 2014 to the City Commission to change the land use designation on the property from Parks and Open Space to Residential. The City Commission did not approve that amendment. The developer has been working closely with the Bozeman Sunrise Rotary and the Turtle Way owners to develop the current plan. The Bozeman Community Plan, 2009 includes a table within Appendix C entitled “Zoning Correlation with Land Use Categories” that directs which zoning designations may be considered for properties with a specific land use designation. The property under consideration in this application has a land use designation of Parks, Open Space, and Recreational Lands. Any zoning designation could be applied to a property with this designation as long as the criteria for a zone map amendment are satisfied. This application proposes to leave the land use designation as it exists and envisions the project to be 292 16274, Bridger Vale Concept PUD Page 2 of 13 developed as a Planned Unit Development under the Residential Emphasis Mixed Use zoning designation. The proposal enhances and expands the current access road to the EGRA, dedicates additional parkland and open space and provides for the development of one commercial building; twenty dwelling units within four, four household buildings and two, two household dwellings. The Development Review Committee (DRC) reviewed the project on July 6, 2016 and has provided comments. The DRC memorandums from the Planning and Engineering Divisions are attached for technical review comments. The Design Review Board reviewed the application at their July 13, 2016 meeting. The audio from that meeting can be found here: http://media.avcaptureall.com/session.html?sessionid=e1e67515-fe2a-499d-97e3- f3f3d077f5c4 293 16274, Bridger Vale Concept PUD Page 3 of 13 The Design Review Board was in support of the proposed project and noted support for the primary road design with the addition of a sidewalk on the south side of the road. The Board recommended varying the building design and architecture to respond to the eclectic architecture in the vicinity and recommended that the applicant consider less density. The Recreation and Parks Advisory Board reviewed the project on July 14, 2016 and recommended approval of the design with the eventual dedication of all parkland and open space to the City and with the approval of a parks master plan. The Board also recommended additional trail connections. The RPAB recommendation is attached with additional information. TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 1 Project Summary ................................................................................................................. 1 SECTION 1 - MAP SERIES .................................................................................................... 4 SECTION 2 - REQUESTED RELAXATION / DEVIATIONS / VARIANCES .................... 6 SECTION 3 - STAFF COMMENTS AND ANALYSIS ......................................................... 7 APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY ................................. 8 APPENDIX B - PROJECT BACKGROUND .......................................................................... 9 APPENDIX C –PLANNED UNIT DEVELOPMENT INTENT ........................................... 12 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF............................ 13 ATTACHMENTS ................................................................................................................... 13 294 16274, Bridger Vale Concept PUD Page 4 of 13 SECTION 1 - MAP SERIES 295 16274, Bridger Vale Concept PUD Page 5 of 13 296 16274, Bridger Vale Concept PUD Page 6 of 13 SECTION 2 - REQUESTED RELAXATION / DEVIATIONS / VARIANCES Relaxations have been requested from the following sections. 1. Section 38.27.060- Access to the proposed park is off of the proposed back alley which abuts the garages for all residential lots. We propose a relaxation from this section of the Bozeman Municipal Code (BMC) which requires streets along 50% of the park frontage. The park's overall perimeter equates to 1,347 LF with 750 LF of frontage which does not abut a street. 2. The proposed street section as shown on the conceptual plan is not a City standard street section. The application requests a relaxation from the standard street section to allow construction of a detention pond in the landscaped median as shown in section 8.0 of the submittal binder. 3. Section 38.39.030- Concurrent construction. The developer would like to start construction of the homes prior to final inspection of the required public infrastructure improvements. 297 16274, Bridger Vale Concept PUD Page 7 of 13 SECTION 3 - STAFF COMMENTS AND ANALYSIS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. The purpose of the Concept PUD is for discussion of the applicant’s proposal with the designated review committees in order to identify any requirements and applicable standards and policies, as well as offering the applicant the opportunity to identify major problems that may exist and identify solutions prior to making formal application. Staff has evaluated the project and offers the following comments for the consideration. Additional technical comments and advisory board comments are attached to this report. Performance Points: With a PUD, Section 38.20.090.E.2.a.7 BMC requires at least 20 performance points for the subject property. Points can be met using any combination of on- site and off-site open space or other options listed in the code. The Preliminary PUD must specify how the performance points are being met. Open space provisions for phased PUD developments: If a project is to be built in phases, each phase shall include an appropriate share of the proposed recreational, open space, affordable housing and other site and building amenities of the entire development used to meet the requirements of section 38.20.090.E.2. The appropriate share of the amenities for each phase shall be determined for each specific project at the time of preliminary approval and shall not be based solely upon a proportional or equal share for the entire site. The proposed development utilizes onsite landscaped open space and innovative stormwater facilities to provide the performance points. It is unclear whether the open space is proposed to include a public access easement. Pedestrian and Bicycle Circulation: The pedestrian circulation system is generally acceptable with the addition of a City standards sidewalk on the south side of Bridger Vale Drive. Standard sidewalks must be provided along both sides of public streets. Bike lanes will be installed along Manley Road. There are several trail connections included to provide pedestrian circulation and connections to existing trails. The PROST plan calls for two trails that connect through this property to Manley Road. One trail connection will be satisfied with the sidewalk on the south side of Bridger Vale Drive. The RPAB considered the application on July 7h and recommends additional trail connectivity. Automobile Connections: Vehicular connections are provided from Manley Road and a new street, Bridger Vale Drive. The street includes on street parking on both sides and a center median that will include stormwater facilities. The street is proposed to include an 80 foot right of way section that exceeds the required 60 foot local street section. Development Guidelines: With a PUD, Section 38.20.070.D.2 requires development guidelines for all phased PUD’s. Development guidelines will be required as there is a proposed commercial lot without a proposed building design. 298 16274, Bridger Vale Concept PUD Page 8 of 13 Stormwater: The concept plan includes cursory stormwater designs. The stormwater design localizes the treatment and conveyance of stormwater for the proposed alley and street. Staff recommends Low Impact Development principles for best practices for integrating stormwater design into the landscape as an amenity. Trees are recommended to be planted in the center median in addition to the street trees that will be required to be planted adjacent to the sidewalks. Landscaping: At the concept level, the application does not delineate in detail the amount of landscape features that are intended. Overall, the landscape plan should provide at least 23 performance points for open space. The parkland improvements must be designed and approved through a parks master plan. The site includes residential adjacency. The Preliminary PUD should include a master landscape plan for the development along with finer detail plans for all planting areas where additional densities of plantings should be provided: at the primary vehicular and pedestrian access locations and the open space areas adjacent to existing residential development along Turtle Way. The watercourse setback and the wetland areas are under separate landscaping standards. Any watercourse modification may require a 404 permit and the code requires a watercourse setback planting plan for any wetland or watercourse setback areas. It appears that an offsite watercourse will require watercourse setback plantings on the proposed open space. Building Design: The property is outside of any overlay districts. Architectural quality will be an important element of PUD submittal. A diversity of architectural design should be implemented to comply with REMU zoning and the existing context of the site which includes a diversity of housing and commercial building designs. APPENDIX A - PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The property is presently not annexed. Under the Gallatin County zoning, the property is designated as M-1, Light Industrial. The property is presently used for pasturing animals and is crossed by an access road to the East Gallatin Recreation Area. The property will require annexation and zoning prior to development entitlements and permits. The application proposes to designate the property with Residential Emphasis Mixed Use zoning. Adopted Growth Policy Designation: The property is designated as Parks, Open Space and Recreational Lands in the Bozeman Community Plan. Parks, Open Space, and Recreational Lands. All publicly owned recreational lands, including parks, are included within this category, as well as certain private lands. These areas are generally open in character and may or may not be developed for active recreational 299 16274, Bridger Vale Concept PUD Page 9 of 13 purposes. This category includes conservation easements which may not be open for public use. APPENDIX B - PROJECT BACKGROUND Project Background The applicant proposed a growth policy amendment in 2014 to the City Commission to change the designation from Parks and Open Space to Residential. The City Commission did not approve that amendment. The developer has been working closely with the Bozeman Sunrise Rotary and the Turtle Way owners to develop the current plan. The property is located north of the East Gallatin Recreation Area and east of Manley Road. The property is privately owned. The present designation of the property for future park uses appears to have occurred during the development of the Bozeman Community Plan which was adopted in 2009. Previously, the 1990 Master Plan showed the property as being in a transition area between Industrial and Park uses. Given the scale of the 1990 map now available it is difficult to clearly show the parcel, especially as individual property lines were not reliably shown on the map. A review of the mapping for the adopted 2009 update of the growth policy shows the present boundary line for all versions of the map. Staff has reviewed minutes of the Planning Board meetings during the preparation of the plan and cannot find discussion of why this change was made. The present map is shown in Section 1 of this report. 300 16274, Bridger Vale Concept PUD Page 10 of 13 Designation on a future land use map, as shown in growth policy excerpt Section 3.5 above, may reflect either existing uses or aspirations for use. At this time Staff has not been able to identify any specific Planning Board or City Commission discussion regarding the adoption of the future land use map in 2009 that would indicate whether the designation of the property was a deliberate act, a translation of the old difficult to read 1990 map which picked up an adjacent property, or an assumption that the subject property was supposed to be included with the larger open space tracts to the south and east. County designation Between the adoption of the 1990 and 2001 future land use maps the City-County planning program was dissolved. All non-annexed property transitioned to the sole control of Gallatin County for planning and zoning. Gallatin County largely retained the 1990 Master Plan for the county areas and readopted the associated zoning. This property with the new County zoning was designated as M-1. Vicinity Land Use The property to the east is owned by the City of Bozeman. A solid waste disposal facility was operated there per the MT Department of Environmental Quality between 1962 and 1970. Use of the site is currently as open space supportive of the East Gallatin Recreation Area and providing a connection between the recreation area and the Bridger Creek Subdivision trail system. The site is approximately 47 acres and was leased to the MT Department of Fish, Wildlife, and Parks in 1985. The state was obligated to perform certain monitoring of the site as set forth in the lease. The application materials include a letter dated November 18, 2014 forwarding a report dated April 4, 1996 from the MT Department of Environmental Quality regarding monitoring and site improvement efforts that had been taken to that point. An updated site monitoring report was provided by the applicant dated January 13, 2015 prepared by Resource Technologies, Inc. Copies of both items are included in the application materials attached to this report. The property to the south is a former gravel pit redeveloped into a pond and recreational area. The property is owned by the MT Fish, Wildlife, and Parks and was purchased in 1984. A 60 foot road easement to access the site passes from Manley Road through the application site and to the East Gallatin Recreation Area. This easement was a part of the purchase agreement between the State and landowner as is to the benefit of the specific parcel and is shown on Certificate of Survey 1221. Both Gallatin County and the City of Bozeman find that this easement is a public right of way for a street and not simply a driveway. The property containing the lake and recreation area was leased to the City of Bozeman by the State for recreational uses in 1991. 301 16274, Bridger Vale Concept PUD Page 11 of 13 A tract to the SW of the subject parcel also was the subject of a growth policy amendment in 2004 as application P-04044. The revised area was 1.84 acres in size and was located at 780 Manley Road. The request was also to change from the future land use designation of Park, Open Space and Recreational Lands to Residential. The application was considered by the City Commission on October 18, 2004 and was approved on a vote of 4-1. The minutes of that meeting are available through the City’s laserfiche archive. The property was later annexed, zoned as R-1, and developed as Minor Subdivision 385 into five residential lots. All lots are now built on. Turtle Way connects to Manley Road and provides access to the five lots. No parkland was dedicated with the development as minor subdivisions are not required to dedicate parkland. The property to the west has been annexed and is zoned M-1, Light Industrial and has been developed as the Gallatin Park subdivision. There are 30 lots and most have buildings on them. There is a pedestrian trail which passes through the subdivision to the Cherry Creek open space to the northwest. East Gallatin Recreation Area The most distinguishing feature of the East Gallatin Recreation Area is the 15.6 acre lake. The lake is supplied by ground water with a surface outlet on the north. The outlet flows to the north and around the adjacent subdivision and connects to a stream north of the right of way which divides the parcel. The outlet has both a manual control and an overflow control to enable management of the water level in the lake. Wetland and potential flooding areas are present but need to be formally delineated on the site. There are water setbacks and water quality standards which will apply to any future development of the site. Exact locations and nature of the setbacks and water quality improvements will be dependent on the delineation of the water courses, wetlands, and design of the site. The 60 foot public right of way by easement which divides the application site provides the primary access to the East Gallatin Recreation Area. Both Gallatin County and the City of Bozeman find that the right of way is a public street subject to typical zoning setbacks and constructions standards. Any future development of the site will require the right of way to be upgraded to public road standards for both vehicles and pedestrians. The plan in this application proposes an 80 foot right of way to accommodate two travel lanes, two on-street parking lanes and a central median to accommodate landscaping and stormwater control. Any future development of the site will also require provision of additional right of way for Manley Road which is a designated collector street in the long range transportation plan. Adjacent Solid Waste Facility 302 16274, Bridger Vale Concept PUD Page 12 of 13 The site is adjacent to an area to the east which was formerly used for a solid waste facility. There has been ongoing testing of the site. The record to date shows that sampling has occurred on several occasions since 1970. Results of more recent testing have shown either very low levels of contaminants or have been inconclusive. The MT Department of Environmental Quality, property owner, applicant and City of Bozeman have all completed and/or reviewed on and off site testing for the property. The conclusion generally is that some contaminants occur on the property and that institutional controls could be applied to the future residential development to mitigate for contaminants that are, or may be present in order to protect the health and safety of residents occupying the subject property. This issue will require additional and continued analysis through the zone map amendment, preliminary plat and planned unit development process. APPENDIX C –PLANNED UNIT DEVELOPMENT INTENT Sec. 38.20.010. Intent. A. It is the intent of the city through the use of the planned unit development (PUD) concept, to promote maximum flexibility and innovation in the development of land and the design of development projects within the city. Specifically, with regard to the improvement and protection of the public health, safety and general welfare, it shall be the intent of this chapter to promote the city's pursuit of the following community objectives: 1. To ensure that future growth and development occurring within the city is in accord with the city's adopted growth policy, its specific elements, and its goals, objectives and policies; 2. To allow opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens of the city area; 3. To foster the safe, efficient and economic use of land and transportation and other public facilities; 4. To ensure adequate provision of public services such as water, sewer, electricity, open space and public parks; 5. To avoid inappropriate development of lands and to provide adequate drainage, water quality and reduction of flood damage; 6. To encourage patterns of development which decrease automobile travel and encourage trip consolidation, thereby reducing traffic congestion and degradation of the existing air quality; 7. To promote the use of bicycles and walking as effective modes of transportation; 8. To reduce energy consumption and demand; 303 16274, Bridger Vale Concept PUD Page 13 of 13 9. To minimize adverse environmental impacts of development and to protect special features of the geography; 10. To improve the design, quality and character of new development; 11. To encourage development of vacant properties within developed areas; 12. To protect existing neighborhoods from the harmful encroachment of incompatible developments; 13. To promote logical development patterns of residential, commercial, office and industrial uses that will mutually benefit the developer, the neighborhood and the community as a whole; 14. To promote the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human-scale design; and 15. To meet the purposes established in section 38.01.040 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF Owner/ Applicant: Ebbighausen Homes, Inc. PO Box 930 Manhattan, MT 59741 Representative: C & H Engineering and Surveying, Inc. 1091 Stoneridge Drive Bozeman, MT 59718 Report By: Brian Krueger, Development Review Manager ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Development Review Application Rotary Comment Letter Site Conditions Data Conceptual Plan 16274 Planning DRC 16274 Engineering DRC 16274 RPAB Advisory 304 305 306 307 308 309 310 311 312 313 314 315 317 318 319 320 321 322 323 324 TO: DEVELOPMENT REVIEW COMMITTEE FROM: BRIAN KRUEGER, DEVELOPMENT REVIEW MANAGER RE: BRIDGER VALE CONCEPT PUD AND SUBDIVISION PRE-APPLICATION, APPLICATIONS 16251/16274 DATE: JULY 6, 2016 Project Description: A PUD and Subdivision pre-application to allow a mixed residential and commercial development with relaxations to zoning regulations requested for park frontage, street design and a request for concurrent construction including the subdivision of one parcel into twenty single household lots, one commercial lot, one common open space lot, one City Park lot and associated street and alley is proposed. For review purposes the applicant assumes REMU, Residential Emphasis Mixed Use zoning. Location: The property is located on Manley Road due north of the East Gallatin Recreation Area, Bozeman, MT 59715. 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. The applicant shall submit with the application for Preliminary Plat/Plan review and approval, a written narrative stating how they have responded to each of these comments. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 3. Property is presently outside of municipal boundaries. 4. The property falls under the Parks, Open Space and Recreational Lands future land use designation on Figure 3-1 of the Bozeman Community Plan. 5. A growth policy amendment may not be required prior to development. The proposed project will generally comply with the current growth policy as designed with the enhanced park street entrance and additional open space and parkland. 6. The applicant has proposed the site be zoned as Residential Emphasis Mixed Use zoning district. The REMU district may be implemented with the current underlying growth policy designation of Parks Open Space and Recreational Lands if the zone map amendment criteria are met. 7. The REMU zoning district requires a maximum 15 foot setback for townhouse units. 325 The plans show the townhome units not in conformance to this standard. 8. The watercourse along Manley Road and associated wetlands are subject to setbacks which will restrict the buildable area of Lot 1. Please see 38.23.100.B. The wetland delineation is required with an application for annexation. The preliminary plat must include information on this issue. 9. Parkland at a rate of .03 acres per dwelling unit is required. A detailed calculation of park provided must be included with the subdivision and planned unit development. The calculation must take into account the adjustments for development requirements for parks. 10. A parks master plan is required with the preliminary plat for the proposed City Park additions. 11. A clear discussion of how the two separate proposed park and open space lots improve the existing East Gallatin Recreation Area must be provided with the application. 12. If a PUD is sought, performance points are required with all PUDs. In this location a minimum of 20 performance points is needed. The required performance points may be satisfied by a variety of methods. A specific description of how the performance points will be provided must be included with the PUD submittal. 13. Open space may be used to meet PUD performance requirements. Open space may be located within or adjacent to the PUD. If located off-site it must be legally tied to the PUD and restricted from diversion to other sources. An easement may be used for this purpose. Open space which includes public access is given 25% more value in the calculation than open space which is restricted to private use. 14. See Chapter 38, Article 26 and Section38.09.030.C: The formal application shall include a detailed landscape plan and a calculation that ensures that the required amount of landscape points has been obtained for any PUD open space lots. The landscaping needs to be coordinated with any PUD performance points provided by open space. The PUD open space must also meeting landscaping requirements. 15. A detailed accounting of proposed landscaping species and how they are used to meet required performance standards shall be provided with the preliminary plan submittal. The legend of plant types should have no species indicators less than 0.5 inches in diameter. The accounting shall describe how each performance standard is met. If non-vegetation options are used they shall be clearly identified on the plan and in the description of the project. 16. The site vision triangles for all accesses shall be shown on the final site plan. The trees planted along the access easement shall be a species that is acceptable to be planted in the boulevard as listed in the City of Bozeman Tree Selection Guide. The landscape plan shall address planting details for the street trees, and shall include a 326 planting note stating that the planting hole shall be at least twice the diameter of the root ball, that the root flare of the newly planted tree is visible and above ground, and there should be a mulch ring 3’ - 4’ in diameter around each newly planted boulevard tree. 17. Please consult the City Forester on tree selection as allowed species of street trees has recently changed. 18. Please consult with the City’s Stormwater Program Coordinator and Water Conservation Specialist regarding landscaping for stormwater facilities and landscaping of open spaces. 19. The provisions of Chapter 38, Article 38 are required. Draft documents must be submitted with the preliminary plat. 20. The proposed covenants shall include a section which clearly indicates those portions of the covenants which were relied upon for the approval of the PUD. This section shall restrict those portions from alteration without written approval of the City of Bozeman. 21. No property may be removed from the covenants once established without written approval of the City of Bozeman. 22. The PUD Final Plan shall be completed and approved before the approval of the final plat. 23. Design Standards are required with a phased Planned Unit Development. 24. The City of Bozeman will rely upon the overall design standards required as part of the planned unit development application. The design standards may not be altered without consent of the City. 25. The REMU district encourages a diversity of housing types. The proposed layout shows primarily town home clusters. The REMU district allows for both townhome and small lot single detached housing. 26. The design for the town home clusters should include individual detailing and architecture to provide visual variety. 27. Breaking the homes into groups to provide visual transparency along the street as depicted in the application is encouraged. 28. The buildings must clearly address the street with main entries. 29. Architectural quality will be an important element on the PUD submittal. A diversity of architectural design will be required. 30. Please provide building and parking envelopes for each lot with the PUD plans to verify that the lot sizes and building placements provided for functional lots. 327 31. If all lots are proposed as townhouse lots within the REMU district, Accessory Dwelling Units are not allowed. The covenants shall explicitly state that lots may not have accessory dwelling units. This covenant may not be changed without City written consent. 32. Water mains must be looped if longer than 500 feet unless an engineering deviation is approved. 33. The City of Bozeman requires a payment for cash in lieu of water rights for further development of property where cash in lieu has not been paid. The City will recognize any previously provided water rights or cash-in-lieu for this property as applying towards future development of this site. Contact Brian Heaston, Engineer at 406-582-2280 for further information. 34. The City of Bozeman has adopted impact fees as part of its development regulations. The impact fee program is contained in Chapter 3.24, Bozeman Municipal Code. Future building permit applications will require payment of the required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. An estimate can be supplied through our office. Contact Chris Saunders, Planning and Policy Manager, at 406-582-2267 for further information. 35. The required private utility easements may be placed in the front or back of the lots. However, to reduce conflicts on narrow lots it may be prudent to place public utilities in the front and private utilities in the back. 36. The final landscape plan shall be coordinated with Northwestern Energy so that the species of trees identified for planting along Manley Road and adjacent open spaces shall not conflict with the existing overhead power lines. 37. Coordinate with Northwestern Energy to ensure that adequate dry utility easement size and placement has been included with the preliminary plat. 38. Fences located in the front, side or rear yard setback of properties adjacent to any park or publicly accessible open space shall not exceed a maximum height of four (4) feet, and shall be of an open construction designed in a manner to be consistent along all park land and open space areas. Proposed fencing shall conform to Section 38.23.130 “Fences, Walls and Hedges.” This requirement with appropriate exhibits of fence types shall be addressed and illustrated in the property owners’ association documents. The documents shall include a single fence style acceptable to the City for locations fronting any public park. 39. The requirements of Chapter 38, Article 43 Affordable Housing must be considered prior to a formal application. 328 40. A City standard sidewalk and regular spacing of street trees is required along the south side of Bridger Vale Drive. 41. The requested waivers for submittal requirements for floodplains, historical features, agriculture and neighborhood center are recommended to be granted. 42. Additional comments regarding the PUD will be provided after the DRB meeting on July 23th, 2016. 43. Formal applications for preliminary plat and preliminary plan must be submitted within one calendar year of the date of the comment letter. Annexation and the Zone Map Amendment must be completed prior to the submittal of any formal applications. 44. The preliminary plat and preliminary PUD will be subject to review for compliance with the Montana Subdivision and Platting Act, Bozeman Municipal Code, Bozeman Community Plan, and associated implementing standards and policies in place at the time that the application is deem adequate for continued review. This is currently twenty working days following a determination that the application is acceptable for review. Future Impact Fees - Please note that future building permit applications will require payment of the required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the required impact fees according to current rates please contact the Department of Community Development and/or visit www.bozeman.net. The Recreation and Parks Advisory Board review committee will review the project on July 7th, 2016. 329 CITY OF BOZEMAN ENGINEERING DEPARTMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2280 fax 406-582-2263 skohtz@bozeman.net www.bozeman.net MEMORANDUM ------------------------------------------------------------------------------------------------------------------------------ TO: DEVELOPMENT REVIEW COMMITTEE, BRIAN KRUEGER FROM: SHAWN KOHTZ, DEVELOPMENT REVIEW ENGINEER RE: BRIDGER VALE CONCEPT PLANNED UNIT DEVELOPMENT AND SUBDIVISION PRE-APPLICATION (#16-251) DATE: 7-11-16 ------------------------------------------------------------------------------------------------------------------------------ The following comments pertain to review of the submitted materials for the above referenced project: 1. A failing intersection exists at the intersection of East Griffin Drive and Manley Road. BMC Section 38.24.060.B.4 states that arterial and collector intersections shall operate at a minimum level of service "C". Level of service (LOS) values shall be determined by using the methods defined by the most recent edition of the Highway Capacity Manual. A development shall be approved only if the LOS requirements are met in the design year, which shall be a minimum of 15 years following the development application review or construction of mitigation measures if mitigation measures are required to maintain LOS. The identified intersection must be upgraded to at least the minimum LOS requirement prior to receiving final plat approval for the proposed project. 2. The City is considering creation of an SID to upgrade Manley Road to a collector standard in conjunction with another development (Glen Lake Commercial Subdivision). The proposed development would be required to participate in the SID for an upgrade to Manley Road. If an SID is not implemented, the developer will be responsible for a proportionate share of the collector street upgrade. The applicant is advised to contact the Glen Lake Commercial Sub developer to support development of the SID. A partial street upgrade for Manley Road adjacent to the property, per former City policy, will not be allowed. 3. The applicant shall provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of SID’s for the following: a. Street improvements to Manley Road including paving, curb/gutter, sidewalk, and storm drainage. b. Street improvements to East and West Griffin Drive including paving, curb/gutter, sidewalk, and storm drainage. c. Intersection improvements to the intersection of Manley Road and East Griffin Drive. d. Intersection improvements to the intersection of West Griffin Drive and N. 7th Avenue. e. Intersection improvements to the intersection of East Griffin Drive and Bridger Drive. 330 Page 2 f. Railroad crossing improvements on East Griffin Drive. The document filed shall specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. 4. It appears wetlands mitigation will be required for the proposed construction on this property. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's must be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to final plat approval. 5. BMC Section 38.23.100.A.2.c.4.d requires a 50-foot setback from wetlands. 6. In the informal application for this project, the applicant proposed a condition of approval, “that all lots construct a sub-slab vapor mitigation system to eliminate any environmental concerns.” The City does not have the necessary information to respond to this comment. The applicant is advised to schedule meetings jointly with the City Engineering Department and City Legal Department with respect to this item. 7. A stormwater master plan will be required prior to preliminary plat approval. The master plan must depict the maximum sized retention or detention basin location and locate and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin sites, drainage ways, and lot finished grades), typical stormwater retention/detention basin and discharge structure details, basin sizing calculations, and a stormwater maintenance plan. 8. The transfer of water rights or the payment of cash-in-lieu of water rights shall be provided in accordance to Bozeman Municipal Code (BMC) section 38.23.180. 9. The City’s parks, recreation, open space, and trails (PROST) plan identifies the need for a trail through the southern portion of the property. The applicant shall coordinate with the Parks, Planning, and Engineering Departments to determine the width and material for that trail. The Engineering Department will accept a trail on the south side of the road as a substitute for sidewalk at that location. 10. A pedestrian crossing of Manley Road is needed to connect the trail system at the intersection of Manley Road and Bridger Vale Drive. 11. Sidewalk is required along the property frontage at Manley Road. 12. A one foot “No Access” strip is required for all lots fronting onto Manley Road to limit accesses to the collector street. 13. The applicant shall contact Erin Shane in the City Water and Sewer Division to obtain a hydrant flow test on a hydrant near the subject property. The hydrant flow test shall be used by the applicant’s engineer to make a determination if the available flows for fire protection are acceptable for the proposed project. 331 Page 3 14. The proposed development falls within a known area of high groundwater. No crawl spaces or basements may be constructed such that sump pumps are required to pump water from these spaces. Sump pumps are not allowed to be connected to the sanitary sewer system. Sump pumps are also not allowed to be connected to the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged onto streets, such as into the curb and gutters where they may create a safety hazard for pedestrians and vehicles. 15. A street light will be required at the intersection of Manley Road and the road entering the subdivision per the City of Bozeman Design Standards and Specifications Policy. 16. During the DRC meeting, the applicant indicated they would locate the proposed water main in the northern leg of Bridger Vale Drive in the same drive aisle as the sewer main. This is preferred by the Water and Sewer Superintendent. CC. ERF Project File 332 MEMORANDUM TO: Community Development - DRC FROM: Recreation and Parks Advisory Board CC: Mitch Overton – Director of Parks and Recreation DATE: July 15, 2016 SUBJECT: Recommendations for Proposal Nos. 16254 Creekstone Condominiums Site Plan; 16251 Bridger Vale Concept PUD; 16275 Cottonwood Corner Apt Site Plan MEETING DATE: July 14, 2016 (full RPAB) Proposal Review Comments: 16254 Creekstone Condominiums Site Plan The petitioner has not yet provided a proposal for park land dedication or cash-in-lieu, as such no recommendation has been made at this time. Staff supports working with the adjacent development (Boulder Creek) to: 1) secure a public access easement over the existing playground to the south of this project; and / or 2) providing improvements-in-lieu along the wetland corridor, such as a pedestrian bridge and east-west trail connection, interpretive signage, benches, etc. and /or in the existing playground. 16251 Bridger Vale Concept PUD Motion by Close, second by Gray to approve the proposed Bridger Vale concept PUD plan as presented, with subject to future dedication of the open space area south of the entry drive to the East Gallatin Recreation Area as public parkland with review of a park master plan by the RPAB. Staff also recommends that a trail connection from existing trails in the EGRA be provided through the proposed parkland in the NE corner of the site to Manley Road (via sidewalks), as well as from the EGRA to Manley on the south side of the entry drive (either a sidewalk or trail), and a crosswalk be installed connecting to the existing trail system west of Manley Rd (see below). 333 16275 Cottonwood Corner Apt Site Plan Motion by Close, second by Thomas to approve the Cottonwood Corner Site Plan as presented subject to a public access easement being granted in perpetuity over the proposed “park area” with the installation of all improvements as shown and appropriate signage indicating open public access to the trail and “park,” with the payment of additional cash-in-lieu (to make up for the actual value of parkland not being dedicated, less the value of the proposed improvements- cp) as deemed necessary by Commission. East Gallatin Recreation Area 334