HomeMy WebLinkAbout09-12-16 CC Mtg - C3. NOA - COP - Bridger Drive Trunk Main Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: 2016 Bridger Drive Trunk Sewer Main Project Notice of Award MEETING DATE: September 12th, 2016 AGENDA ITEM TYPE: Consent RECOMMENDATION: Ratify the Acting City Manager’s signature on the Notice of Award to COP Construction LLC for the Total Base Bid in the amount of $420,912.00. BACKGROUND: Attached is a copy of the Notice of Award for the above referenced project. The project generally involves installation of a 15” sewer main across and along Bridger Drive from Birdie Drive to Story Mill Road, an 8” sewer main in Story Mill Road from Bridger Drive to Griffin Drive and an 8” sewer main in Griffin Drive from Story Mill Road west approximately 380 feet including manholes, sewer main stubs, sewer service stubs, all weather access roads, surface restoration, and all appurtenances. The project is being completed in accordance with the Wastewater Facility Plan and will provide the capacity necessary to serve a large area south of Bridger Drive. This project will get the sewer across Bridger Drive prior to its reconstruction next summer. It will also provide immediate service to the properties along Story Mill and Griffin Drive. Those property owners approached the City about getting service and will be reimbursing us for all of the work on Story Mill and Griffin. The contract is to be completed within 75 days of the issuance of the notice to proceed. Bids for the above-referenced project were opened on August 23, 2016 with 4 bids being submitted. The low bid was submitted by COP Construction LLC in the amount of $420,912.00. The Bid Tabulation for the project is attached. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: Property owners in the area will be reimbursing the City for all of the work on Story Mill and Griffin Drive. This amounts to $167,868.13. Of the remaining $253,043.87, 81% or $204,965.53 is the capacity expanding portion of the 15” main and will be paid from the Wastewater Impact Fee Fund and $48,078.34 for the 8” equivalent portion of the main will be paid from the Wastewater Fund. Attachments: Notice of Award, Bid Tabulation Report compiled on: 8/30/16 57 58 2016 Bridger Drive Trunk Sewer Main Schedule 1 Esimated Unit Total Unit Total Unit Total Unit Total Unit Total ITEM DESCRIPTION UNIT Quantity Price Price Price Price Price Price Price Price Price Price 101 Taxes, Bonds, Insurance LS 1 $9,625.00 $9,625.00 $18,000.00 $18,000.00 $28,210.00 $28,210.00 $17,250.00 $17,250.00 $20,000.00 $20,000.00 102 Mobilization LS 1 $19,250.00 $19,250.00 $59,000.00 $59,000.00 $25,288.00 $25,288.00 $52,500.00 $52,500.00 $95,000.00 $95,000.00 103 Connection to Existing Manhole EA 1 $3,000.00 $3,000.00 $3,300.00 $3,300.00 $3,515.00 $3,515.00 $4,750.00 $4,750.00 $3,500.00 $3,500.00 104 8" SDR 35 PVC Sewer Main LF 1313 $60.00 $78,780.00 $35.00 $45,955.00 $106.22 $139,466.86 $150.00 $196,950.00 $70.00 $91,910.00 105 15" SDR 35 PVC Sewer Main LF 1574 $70.00 $110,180.00 $43.00 $67,682.00 $105.67 $166,324.58 $51.75 $81,454.50 $65.00 $102,310.00 106 4" SDR 26 PVC Sewer Service LF 193 $50.00 $9,650.00 $37.00 $7,141.00 $18.65 $3,599.45 $95.00 $18,335.00 $70.00 $13,510.00 107 6" SDR 26 PVC Sewer Service LF 50 $55.00 $2,750.00 $48.00 $2,400.00 $21.30 $1,065.00 $95.00 $4,750.00 $70.00 $3,500.00 108 48" Dia. Basic Manhole, 5'-0" Depth EA 3 $4,000.00 $12,000.00 $2,900.00 $8,700.00 $1,876.67 $5,630.01 $5,000.00 $15,000.00 $3,500.00 $10,500.00 109 60" Dia. Basic Manhole, 5'-0" Depth EA 5 $5,500.00 $27,500.00 $4,600.00 $23,000.00 $3,915.00 $19,575.00 $9,500.00 $47,500.00 $6,400.00 $32,000.00 110 60" Dia. Basic Drop Manhole, 5'-0" Depth EA 2 $6,000.00 $12,000.00 $5,100.00 $10,200.00 $4,250.00 $8,500.00 $9,750.00 $19,500.00 $7,500.00 $15,000.00 111 48" Dia. Additional Manhole Depth VF 3.5 $200.00 $700.00 $78.00 $273.00 $120.00 $420.00 $125.00 $437.50 $150.00 $525.00 112 60" Dia. Additonal Manhole Depth VF 66 $300.00 $19,800.00 $152.00 $10,032.00 $82.73 $5,460.18 $175.00 $11,550.00 $290.00 $19,140.00 113 Sewer Access Road LF 691 $25.00 $17,275.00 $29.00 $20,039.00 $8.24 $5,693.84 $14.50 $10,019.50 $28.00 $19,348.00 114 Insulation LF 80 $15.00 $1,200.00 $27.00 $2,160.00 $15.50 $1,240.00 $9.00 $720.00 $15.00 $1,200.00 115 Traffic Control LS 1 $40,000.00 $40,000.00 $14,000.00 $14,000.00 $39,912.50 $39,912.50 $14,750.00 $14,750.00 $25,000.00 $25,000.00 116 Asphalt Restoration LF 1530 $45.00 $68,850.00 $59.00 $90,270.00 $49.12 $75,153.60 $29.50 $45,135.00 $40.00 $61,200.00 117 Type 2 Pipe Bedding CY 20 $60.00 $1,200.00 $33.00 $660.00 $52.00 $1,040.00 $58.00 $1,160.00 $40.00 $800.00 118 Imported Backfill Material CY 50 $50.00 $2,500.00 $24.00 $1,200.00 $44.86 $2,243.00 $27.00 $1,350.00 $40.00 $2,000.00 119 Topsoil & Seeding LS 1 $10,000.00 $10,000.00 $6,700.00 $6,700.00 $1,569.00 $1,569.00 $3,500.00 $3,500.00 $9,500.00 $9,500.00 120 Construction Staking LS 1 $10,000.00 $10,000.00 $5,200.00 $5,200.00 $12,000.00 $12,000.00 $9,000.00 $9,000.00 $8,850.00 $8,850.00 121 Miscellaneous Work EA 25000 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 TOTAL BASE BID $481,260.00 $420,912.00 $570,906.02 $580,611.50 $559,793.00 ENGINEER'S ESTIMATE CK May Excavating Omdahl ExcavationWalker ExcavationCOP Construction 59