16- Contract Documents - Knife River - 2016 Sidewalk Installations and Repairs, and Curb Replacements
130 n8�os�� jN co. CITY OF BOZEMAN 2016 SIDEWALK INSTALLATIONS AND REPAIRS, AND CURB REPLACEMENTS CONTRACT DOCUMENTS PREPARED BY CITY OF BOZEMAN ENGINEERING DEPARTMENT May 2016 l 2016 SIDEWALK INSTALLATIONS AND REPAIRS AND CURB REPLACEMENTS CITY OF BOZEMAN BID OPENING: JUNE 8,2016,2:00 P.M. ADDENDUM No. 1 JUNE 6, 2016 TO: All Planholders of Record Please note the following modifications to the above referenced bid documents to reflect a change in measurement and payment section: Replace the measurement and payment section for Bid Item 301 with the following: tl Item 301: Unclassified excavation above sub rg ade This item is measured by the square yard square foot and paid for at the unit price bid for "Unclassified excavation above subgrade",said price and pavement being full compensation for all labor, tools, equipment, and other incidentals necessary for removing (including sawcutting) and disposing of any asphalt concrete pavement,PCC pavement,curbing,sidewalks,drive approaches, soil,or vegetation necessary to prepare the site for the installation of new curb and gutter,sidewalks, pedestrian ramps, drive approaches, and asphalt pavement, and to re-compact and/or prepare as f necessary the base material for placement of new asphaltic or Portland cement concrete. ACKNOWLEDGEMENT Bidder shall acknowledge receipt and acceptance of this Addendum No. 1 on the Bid Form to validate their bid. ► Andrew Kerr Engineering Assistant l City of Bozeman i CITY OF BOZEMAN, MONTANA 2016 SIDEWALK INSTALLATIONS AND REPAIRS, AND CURB REPLACEMENTS May 2016 TABLE OF CONTENTS CONTRACT DOCUMENTS Bidder's Checklist Invitation to Bid Instruction to Bidders Bid Form Non-discrimination Affirmation Form Bid Bond Agreement Form Payment and Performance Bonds Standard General Conditions of the Construction Contract (by reference) Supplementary Conditions Montana Prevailing Wage Rates CONSTRUCTION SPECIFICATIONS Special Provisions Measurement and Payment APPENDIX A Standard Drawings APPENDIX B Estimated Quantities, Work Location Maps BIDDER'S CHECKLIST Please utilize the following Bidder's Checklist before submitting your bid. 1) Original Bid Bond Enclosed? (Personal checks, business checks, and faxed copies are not acceptable.) 2) Bid Proposal: a. Arithmetic Checked? b. Unit Bid amounts agree with math calulations? c. All Addenda acknowledged on proposal sheet and cover? d. Signature portion completely filled out? e. Bid Proposal intact in Contract Documents DO NOT REMOVE!!!! f. Non-Descrimination Affirmation form completed and signed? 3) Bid Envelope: a. Addressed properly? (See Article 1 —Bids, Instructions to Bidders) b. Contains the Contract Documents and Specifications booklet? C. Acknowledged Receipt of Addenda? d. Sealed? 4) Bid Submitted prior to required time at specified location? Be sure to seal your bid. Include project name, bid date/time, contractor name, contractor registration number, and acknowledgement of all addenda (by number) on the outside of the bid envelope. Leave all sheets intact in the Contract Documents and Specifications booklet. Return the complete Contract Documents and Specifications booklet. ALL BID DOCUMENTS AND BONDS MUST BE ORIGINALS. NO FAXED COPIES WILL BE ACCEPTED. CITY OF BOZEMAN, MONTANA CALL FOR BIDS NOTICE IS HEREBY GIVEN that the City of Bozeman, Montana, is accepting sealed bids for: 2016 Sidewalk Installations and Repairs, and Curb Replacement Project Separate sealed bids for construction of City of Bozeman 2016 Sidewalk Installations and Repairs and Curb Replacement Project will be received by the City Clerk, City Hall, 121 N. Rouse Avenue, P.O. Box 1230, Bozeman, Montana 59771-1230 will be received until 2:00 p.m., local time, June 8, 2016, and then publicly opened and read aloud. Please write the name of the project on the front of the sealed bid. The physical address is: City Clerk's Office, Suite 202, City Hall, 121 N. Rouse Avenue, Bozeman, Montana. The mailing address is: City Cleric's Office, Suite 202, City Hall, P.O. Box 1230, Bozeman, Montana, 59771. Bids must be received before 2:00 p.m. June 8, 2016. Original copies must be submitted—no faxed or electronic bids will be accepted. Bids will be opened and read following the close of bids. The work involves installation of approximately 12,800 square feet of concrete sidewalks along vacant lots,and removal and replacement of approximately 10,250 square feet of concrete sidewalks, and replacement of approximately 866 lineal feet of concrete curb at various locations within the City of Bozeman as specified in the contract documents. Copies of the CONTRACT DOCUMENTS are available for viewing, or may be obtained upon payment of$15.00(non-refundable)for each set,at the City of Bozeman,Engineering Department, 20 East Olive Street, Bozeman Montana 59715. All bids and proposals for the construction of any public contract project shall contain a statement showing that the bidder or contractor is duly and regularly registered under the laws of the State of Montana, and the contractor's registration number shall appear upon such bid or proposal, and no contract shall be awarded to any contractor unless he is the holder of registration, all as defined by MCA 39-9-101 through 410.Forms for registration are available from the Department of Labor and Industry,P.O.Box 8011, 1805 Prospect,Helena,Montana, 59604-8011.Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by contractors or sub-contractors in performance of the construction work shall be paid wages at rates as may be required by the laws of the State of Montana. Discrimination in the performance of any contract awarded under this invitation on the basis of race, creed, sex, age,marital status,national origin,or 1 INVITATION TO BID actual or perceived sexual orientation, gender identity or disability is prohibited. This prohibition shall apply to the hiring and treatment of the awarded entity's employees and to all subcontracts. Every entity submitting under this invitation must sign and return the required affirmation. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Bozeman,Montana,in an amount not less than Ten percent(10%)of the total amount of the bid. Successful bidders shall furnish an approved Performance Bond and a labor and materials Payment Bond,each in the amount of One Hundred percent(100%)of the contract amount. Insurance as required shall be provided by the successful bidder(s) and a Certificate(s) of that insurance shall be provided. No bid may be withdrawn after the scheduled time for the public opening of bids,which is 2:00 p.m. local time, June 8, 2016. The right is reserved to reject any or all proposals received,to waive informalities,to postpone the award of the contract for a period of not to exceed Sixty(60)days,and to accept the bid which is in the best interests of the Owner. The City of Bozeman is required to be an Equal Opportunity Employer. Dated at Bozeman, Montana, this 19th day of May, 2016. Robin Crough City Cleric, City of Bozeman Published Bozeman, Montana May 22, 2016 May 29, 2016 2 INVITATION TO BID INSTRUCTIONS TO BIDDERS BIDS All Bids must be made on the forms provided in this bound copy of the Contract Documents. All Bids must be legibly written in inlc,with all prices given in figures and total bid amount given in words and figures. No alterations by erasures or interlineations will be permitted in Bids or in the printed forms. Each Bid shall be enclosed in a sealed envelope addressed to the City Clerk,City Hall,121 N. Rouse Avenue,P.O. Box 1230,Bozeman,Montana 59771-1230, and endorsed on the outside of the envelope with the words: 2016 SIDEWALK INSTALLATIONS AND REPAIRS, AND CURB REPLACEMENTS, CITY OF BOZEMAN. Bids shall be strictly in accordance with the prescribed form. Any modifications thereof or deviations therefrom may be considered as sufficient cause for rejection. Bids carrying riders or qualifications to the Bid being submitted may be rejected as irregular. BID GUARANTEE No Bids will be considered unless accompanied by a Bid guarantee,in the amount stipulated in the Invitation To Bid, made unconditionally payable to the Owner,which may be either a Cashier's Check or a Certified Check drawn on an acceptable bank. A Bidder's Bond issued by a surety company authorized to do business in the State of Montana will also be acceptable. SIGNATURE OF BIDDERS Each Bid must be signed in inkby the Bidder with his full name and with his business address or place of residence. In case of a firm or partnership, the name and residence of each member must be inserted. In case the Bid is submitted by, or in behalf of,a corporation,it must be signed in the name of such corporation by an official who is authorized to bind the corporation,and who shall also affix the corporate seal of such corporation. The Bid of a corporation which is signed by a person other than a corporate officer must be accompanied by a Power of Attorney showing that person's authority. ONLY ONE PROPOSAL No Bidder may submit more than one Bid. Two Bids under different names will not be received from one firm or association. RESPONSIBILITIES OF AGENT Any person signing a Bid as the agent of another, or of others,may be required to submit satisfactory evidence of this authority to do so. The title of the person(s)executing the Bid or Agreement shall be clearly indicated beneath his signature. QUALIFICATIONS OF BIDDERS Bidders may be required to submit satisfactory evidence that they have a practical knowledge of the particular work bid upon, and that they have the necessary financial resources to complete the proposed work. In determining the lowest responsible bid, the following elements will be considered: whether the Bidder involved(a)maintains a permanent place of business;(b)has adequate plant and equipment to do the work properly and expeditiously; (c) has a suitable financial status to meet obligations incident to 1 INSTRUCTIONS TO BIDDERS the work; and (d) has appropriate technical experience. Each Bidder may be required to show that former work performed by him has been handled in such a manner that there are no just or proper claims pending against such work. No Bidder will be acceptable if he is engaged on any other work which impairs his ability to finance his contract. The Bidder shall demonstrate his ability by meeting all requirements herein stipulated, if asked for them. CONTRACT DOCUMENTS It is intended that the Montana Public Works Standard Specification,6ch Edition(MPWSS), shall be used to govern the contractual and performance aspects of this project,and is hereby incorporated as part of these CONTRACT DOCUMENTS, as modified by the City of Bozeman Modifications to Montana Public Works Standard Specifications 6th Edition(COB MODS), dated March 31,2011,including all addenda,which is also hereby incorporated as part of these contract documents,and as further modified herein by the City of Bozeman. All standard forms of MPWSS shall be utilized in executing these CONTRACT DOCUMENTS unless otherwise noted or revised in the bound bid document. The complete CONTRACT DOCUMENTS which comprise this entire document, and are made a part hereof, consist of the following: Invitation to Bid............................ Bound Herein Instructions to Bidders.................. Bound Herein Bid Form...................................... Bound Herein Bid Bond...................................... Bound Herein Agreement Form...........................Bound Herein Payment Bond..............................MPWSSBound Herein Performance Bond........................MPWSS/Bound Herein Standard General Conditions........MPWSS Supplementary Conditions............MPWSS/Bound Herein Miscellaneous Forms Notice of Award..................MPWSS Notice To Proceed............. MPWSS Change Order.....................MPWSS Work Directive Change.......MPWSS Application For Payment (Guidance Only)............... MPWSS Certificate of Substantial Completion........................MPWSS Wage Rates...................................Bound Herein Special Provisions..........................Bound Herein Technical Specification...................MPWSS; COB MODS Appendix A--Standard Drawings......... MPWSS/Bound Herein Appendix B—Work Vicinity Maps, Estimated Quantities...... Bound Herein 2 INSTRUCTIONS TO BIDDERS EXAMINATION OF CONTRACT DOCUMENTS AND SITE Before submitting a bid, each Bidder must (a) examine the Contract Documents thoroughly (b) visit the site to familiarize himself with location conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances,rules and regulations that may in any manner affect cost,progress or performance of the Work; and(d)study and carefully correlate Bidder's observations with the Contract Documents. Any Bidder may,upon request,examine those reports of investigations and tests of subsurface and latent physical conditions at the site (if any) which have been relied upon in preparing the drawings and specifications. These reports are not guaranteed as to accuracy or completeness,nor are they part of the Contract Documents. Before submitting his Bid each Bidder will, at his own expense, make such additional investigations and tests as the Bidder may deem necessary to determine his Bid for performance of the Work in accordance with the time, price and other terms and conditions of the Contract Documents. On request,Owner will provide each Bidder access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of his Bid. Any administrative requirements and associated costs of such investigations are the responsibility of the Bidder. The lands upon which the Work is to be performed, rights-of-way for access thereto and other lands designated for use by Contractor in performing the Work are identified in the specifications or on the drawings. The submission of a Bid will constitute an incontrovertible representation by the Bidder that he has complied with every requirement of this section and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the work. Where logs of test borings are included in the contract plans,it is agreed that such logs do not constitute a part of the contract and are included only for the convenience of the bidder or Contractor and do not relieve him of his duties under this section or of any other responsibility under the contract. No information derived from any inspection of records of investigation or compilation thereof made by the Owner will in any way relieve the bidder or Contractor from properly performing his obligations under the contract. UNDERGROUND UTILITIES The location of underground utilities as shown on the drawings is approximate and the Owner assumes no responsibility for determining the exact location. The Contractor shall note the reference to utility lines and service lines for various utilities as noted on the drawings and that the approximate location may or may not be given. The Contractor shall make written inquiry of the related utility agency to determine the location of underground utilities in the project area. INTERPRETATION OF CONTRACT DOCUMENTS If any person contemplating submitting a Bid for 3 INSTRUCTIONS TO BIDDERS the proposed contract is in doubt as to the true meaning of any part of the specifications, or other proposed Contract Documents, he may submit to the Owner a written request for an interpretation thereof. The person submitting the request will be responsible for its prompt delivery. Any interpretation of the proposed documents will be made only by an addendum duly issued and a copy of any such addendum will be mailed or delivered to each person receiving a set of such documents. TIME OF COMPLETION The time of completion of the work is a basic consideration of the Contract. It will be necessary that the Bidder satisfy the Owner of his ability to complete the work within the stipulated time. ADDENDA Any addenda issued during the time of bidding, or forming a part of the Contract Documents loaned to the Bidder for the preparation of his proposal,shall be covered in the Bid and shall be made a part of the Agreement. Receipt of each addendum shall be acknowledged in the Bid. Any Bid in which all issued addenda are not acknowledged will be considered incomplete and will not be read. PROPOSAL The bidder shall submit his proposal on the forms bound in these Contract Documents. Neither the proposal nor any other pages bound herein or attached hereto shall be detached. Proposals shall be in a sealed envelope and addressed to: City Clerk City Hall 121 N. Rouse Avenue P.O. Box 1230 Bozeman, MT 59771-1230 The envelope shall also contain the following information: Name of Project: City of Bozeman 2016 Sidewalk Installations and Repairs, and Curb Replacements Name of Contractor: Montana Certificate of Contractor Registration No. Acknowledge Receipt of Addendum No.: , In the lower left hand corner of the envelope print or type: BID DOCUMENTS - DO NOT OPEN UNTIL 2:00 P.M., June 8, 2016. Proposals shall be made in accordance with the following instructions: 4 INSTRUCTIONS TO BIDDERS A. Submit one copy of the complete bound document in an opaque sealed e nvelope. DO NOT REMOVE THE PROPOSAL NOR ANY OTHER PAGES FROM THE BOUND CONTRACT DOCUMENT. B. Bids shall be made in ink upon the unaltered Bid Proposal Form supplied with these documents. C. All blank spaces must be properly filled. D. The total bid price must be stated in both writing and in figures. In case of a discrepancy between unit price and total bid price,the unit prices or lump sum prices shall be used in computing the total bid price. E. The proposal form shall contain no additions,conditions,stipulations,erasures,or other irregularities. F. The proposal must acknowledge receipt of all addenda issued. G. The proposal must be signed in ink and display the bidder's name, address, and current Montana Contractor's License Number. SIGNING OF BIDS Bids which are not signed by individuals making them shall have attached thereto a power of attorney evidencing authority to sign the bid in the name of the person for whom it is signed. Bids which are signed for a co-partnership shall be signed by all of the co-partners or by an attorney-in- fact. If signed by an attorney-in-fact, there shall be attached to the bid a power of attorney evidencing authority to sign the bid. Bids which are signed for a corporation shall have the correct corporate name thereof signed in handwriting or in typewriting and the signature of the president or other authorized officer of the corporation shall be manually written below the written or typewritten corporate name following the work: By: Corporate Seal Title: 5 INSTRUCTIONS TO BIDDERS If bids are signed for any other legal entity, the authority of the person signing for such legal entity should be attached to the bid. BID REQUIREMENTS The bidder is expected to base his bid on materials and equipment complying fully with the plans and specifications and, in the event he names in his bid materials or equipment which do not conform, he will be responsible for furnishing materials and equipment which fully conform at no charge in his bid price. Before submitting a proposal,each Contractor should read the complete Contract Documents(including all addenda), specifications and plans, including all related documents containing herein, all of which contain provisions applicable not only to the successful bidder, but also to his subcontractors. BID QUANTITIES Bidders must satisfy themselves by personal examination of the locations of the proposed work and by such other means as they may prefer as to the correctness of any quantities. The estimated unit quantities of the various classes of work to be done under this contract are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing the proposals offered for the work. The Contractor agrees that,during progress of the work, the Owner may find it advisable to omit portions of the work,to increase or decrease the quantities as may be deemed necessary or desirable, that the actual amount of work to be done and materials to be furnished may differ from the estimated quantities, and that the basis for payment under this contract shall be the actual amount of work done and the materials furnished. The Contractor agrees that he will make no claim for damages, anticipated profits or otherwise on account of any difference which may be found between quantities of work actually done and the estimated quantities. MODIFICATION AND WITHDRAWAL OF BID Bids may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids as called for in the Invitation to Bid. Requests for modification or withdrawal must be written and must be signed in the same manner and by the same person(s) who signed the Bid. If, within twenty-four hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid,that Bidder may withdraw its Bid and the Bid security will be returned. Thereafter, if the Work is rebid or negotiated, that Bidder will be disqualified from further bidding on the Work. ACCEPTANCE AND REJECTION OF THE BIDS The Owner reserves the right to accept or reject the Bids, or portions of Bids if denoted in the Bid as separate schedules,and to award more than one Bid or schedule for the same Bid if any of the aforementioned combination of Bids or schedules will be in the 6 INSTRUCTIONS TO BIDDERS best interest of the Owner. The Owner reserves the right to waive irregularities in any Bid submitted,or reject nonconforming, non-responsive or conditional Bids and to correct arithmetical errors in the Bid prior to comparison. SUBCONTRACTORS Within seven days after Bids are opened,the apparent low Bidder,and any other Bidder so requested, shall submit a list of all Subcontractors he expects to use in the work. An experience statement with pertinent information as to similar projects and other evidence of qualification shall be furnished for each named subcontractor,if requested by the Owner. If the Owner or Engineer after due investigation has reasonable objection to any proposed Subcontractor,they may, before giving the Notice of Award,request the apparent low Bidder to submit an acceptable substitute. If the substitution results in an increase in the Bid, a corresponding adjustment will be made in the contract price. If the apparent low Bidder declines to make any such substitution,the contract may not be awarded to such Bidder,but Bidder's refusal to substitution will not constitute grounds for forfeiture of Bid Security. Any subcontractor so listed and to whom Owner or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to the Owner and Engineer. Contractor shall not be required to employ any subcontractor against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by Owner prior to the Notice of Award will be required in the performance of the work. The Contractor shall be required to perform at least 40 percent of the original contract cost (excluding cost of Traffic Control) with the Contractor's organization. Where an entire item is subcontracted, the percentage of the work subcontracted is based on the original contract item unit price. When a portion of an item is subcontracted, the percentage of the work subcontracted will be based on either the subcontract item unit price or on an estimated percentage of the contract item unit price, determined by the City Engineer. An item will not be considered partially subcontracted unless the prime contractor performs a portion of the work (equipment, materials or labor). If the same item is subcontracted at multiple levels, the cost is only accounted for at the first level. When an item added by change order is subcontracted, the cost of the item does not count towards the required contract performance. AWARD OF CONTRACT The award of contract,if awarded,will be made within the period specified in the Invitation To Bid to the lowest responsible Bidder whose Bid complies with all the requirements prescribed herein. The successful Bidder will be notified by letter,mailed to the address shown on the Bid, that his Bid has been accepted and that he has been awarded the contract. Bidders must bid all schedules, only one contract will be awarded. CANCELLATION OF AWARD The Owner reserves the right to cancel the award of any contract at any time before the complete execution of the Agreement by all parties without any liability against the 7 INSTRUCTIONS TO BIDDERS Owner. RETURN OF BID GUARANTEE All Bid guarantees,except those of the three lowest Bidders,will be returned immediately following the opening and checking of the Bids. The Bid guarantees of the unsuccessful of the three lowest Bidders will be returned within ten(10)days following the award of the contract. The Bid guarantee of the Bidder to whom the contract is awarded will be returned when said Bidder has executed an Agreement and filed satisfactory Performance and Payment Bonds as hereinafter stipulated. PERFORMANCE AND PAYMENT BONDS The Contractor to whom the contract is awarded will be required to furnish a Performance Bond and a Payment Bond in favor of the Owner each in an amount equal to one-hundred percent (100%) of the Agreement amount. The Bonds shall be executed on the forms bound herein, signed by a surety company authorized to do business in the State of Montana, and acceptable as a surety to the Owner and countersigned by a Montana Resident Agent. With the Bonds, there shall be filed with the Owner one copy of Power of Attorney certified to include the date of the Bond. EXECUTION AND APPROVAL OF AGREEMENT The Agreement shall be signed by the successful Bidder and returned, together with the contract Bonds, within the time shown on the Bid. If the Agreement is not executed by the Owner within fifteen(15) days following receipt from the Bidder of the signed Agreements and Bonds, the Bidder shall have the right to withdraw his Bid without penalty. No Agreement shall be considered as effective until it has been fully executed by all of the parties thereto. FAILURE TO EXECUTE AGREEMENT Failure to execute the Agreement and furnish a Performance Bond and Payment Bond shall be just cause for annulment of the award. In the event of such annulment of the award, the Bid guarantee shall be forfeited to the Owner, not as a penalty but as liquidation of damages sustained. Award may then be made to the next lowest responsible and qualified Bidder,or the work may be re-advertised as the Owner may decide. BOUND COPY OF CONTRACT DOCUMENTS None of the Instructions to Bidders,Bid Form,Bond forms,Agreement,contract stipulations,or other specifications shall be removed from the bound copy of Contract Documents prior to submission of Bid. PAYMENTS Payment for all work performed under this Agreement will be made by the Owner within the time period specified in and in accordance with the procedures outlined in the General Conditions. Payments made after the time limit will be subject to interest at the rate specified in the Agreement. When the work extends beyond thirty(30)days,progress payments will be made monthly for any work accomplished during the preceding month, but subject to retainage as specified elsewhere. 8 INSTRUCTIONS TO BIDDERS PREVAILING WAGE RATES On all projects and contracts with the Owner, Contractor and all subcontractors shall pay for all labor employed the standard prevailing rate of wages. The standard prevailing rate of wages as used herein means that standard prevailing rate of wages in the locality where the work is to be performed as determined by the Montana Commissioner of Labor pursuant to MCA 18- 2-402 and as bound herein. The Contractor and subcontractors are directed to the Montana Commissioner of Labor for information on the standard prevailing rate of wages applicable to this contract within this area. Each contractor and employer shall maintain payroll records in a manner readily capable of being certified for submission under 18-2-423,Montana Code Annotated(MCA),for not less than 3 years after the contractor's or employer's completion of work on the project. POSTING Contractor shall post in a prominent and accessible place on the site of the work a legible statement of all wages to be paid to the employees. LOCAL LABOR Contractor shall give preference to the employment of Montana residents in accordance with applicable portions of Title 18, Chapter 2, Part 4, MCA. MONTANA CONTRACTOR REGISTRATION REQUIREMENTS No bids will be considered that do not carry the Bidder's Certificate of Contractor's Registration number on the envelope containing the Bid and on the Bid. Information pertaining to the Montana Contractor Registration requirements may be obtained from the Montana State Department of Revenue, Helena, Montana. (1-406-444-7734) ADDITIONAL CONTRACTOR LICENSE FEE(MONTANA CONTRACTORS GROSS RECEIPTS TAX) In accordance with Title 15, Chapter 50, MCA, the Owner shall withhold, in addition to other amounts withheld as provided by law or specified herein, 1 percent (1%) of all payments due the Contractor and shall transmit such moneys to the Montana Department of Revenue. BIDDER PREFERENCE In accordance with the provisions of Title 18, Chapter 1, Part 1, MCA, a preference will be given to the lowest responsible Bidder who is a resident of the State of Montana over a nonresident Bidder from any state or country that enforces a preference in their state or country for their resident Bidders. The preference given to Montana resident Bidders will be equal to the preference given in the other state or country. This preference applies unless specifically prohibited by Federal laws or regulations. Products manufactured or produced in the State of Montana shall be preferred for use in all projects if such products are comparable in price and quality. Further,wherever possible,products manufactured and produced in the State which are suitable substitutes for products manufactured or produced outside the State and comparable in price,quality and performance shall be preferred for use in this project. Preference regarding these products shall be in accordance with the laws of the State of Montana. CITY OF BOZEMAN BUSINESS LICENSE All Contractors conducting work within the City of Bozeman are required to have a current Business License. Applications for Business Licenses may be obtained at City Hall, 121 N. Rouse Avenue, Bozeman, Montana. 9 INSTRUCTIONS TO BIDDERS BID FORM 2016 SIDEWALK INSTALLATIONS AND REPAIRS, AND CURB REPLACEMENTS CITY OF BOZEMAN BOZEMAN, MONTANA 59771 TO: City Clerk P.O. Box 1230 Bozeman, Montana 59771-1230 THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents, the site(s) where the work is to be performed, local labor conditions and all laws, regulations,municipal ordinances and other factors which may affect the performance of the Work,and having satisfied himself of the expense and difficulties attending performance of the work: HEREBY PROPOSES and agrees, if this bid is accepted, to enter into an Agreement, in the form attached, to perform all work for the replacement of concrete sidewalks and installation of pedestrian ramps, including the assumption of all obligations, duties, and responsibilities necessary for the successful completion of the contract and the furnishing of all materials and equipment required to be incorporated in, and form a permanent part of, the work; tools, equipment, supplies, transportation, facilities, labor, superintendence, and services required to perform the Work; Bonds, Insurance and Submittals; all as indicated or specified in the Contract Documents to be performed or furnished by Contractor within the time and for the prices set forth in the following schedules. The undersigned bidder agrees to be bound by this Bid for a period not to exceed that specified in the Invitation to Bid. The undersigned Bidder agrees to furnish the required Bonds and to enter into a contract within fifteen (15) calendar days after Owner's acceptance of this Bid, and further agrees to complete all Work within 75 (seventy-five) consecutive calendar days after commencement of the contract time as defined in the General Conditions. The undersigned Bidder agrees that the unit prices shall govern in checking the Bid, and should a discrepancy exist in the total prices and total amount of Bid as listed above,after extensions are checked and corrections made, if any, the total amount of the Bid as corrected shall be used in awarding the contract. The undersigned Bidder agrees that he has been afforded access to the construction site and has performed those independent site investigations as he deemed necessary. The undersigned Bidder hereby certifies the following: 1 BID FORM A) That this Bid is genuine and is not made in the interest of, or on behalf of,any undisclosed person, firm, or corporation, and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; B) That he has not directly or indirectly solicited any other Bidder to put in a false or sham Bid; C) That he has not solicited or induced any person, firm, or corporation to refrain from bidding; D) That he has not sought by collusion to obtain for himself any advantage over any other Bidder or over the Owner. E) That he is not currently operating beyond the contract time on any previously awarded public works contract as defined and required by Article 15-50-203, MCA, as amended. The undersigned Bidder(s) either singularly or as a joint venture hereby certifies (certify) pursuant to 1 Article 37-71-203, MCA, that he (they) is (are) duly and regularly licensed. BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following j unit prices or lump sums: BID SCHEDULE SCHEDULE 1 NEW SIDEWALK INSTALLATIONS NO. ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE (Figures) (Figures) Tres) i 101 4" Concrete S.F. $5. E5® 8,771 $ 1/9 sidewalk in place 102 6" Concrete S.F. $ 3,630 $ 0'Z 3, 5M d® v sidewalk in place 103 Special costs 540 Enterprise Blvd Lump Sum $ 'a 00 580 Enterprise Blvd Lump Sum $ %,4!!�00,00 630 Enterprise Blvd Lump Sum $ . /40. ®�`I 3460 Parkway Lump Sum $ / a.30, 0® 3482 Parkway Lump Sum $ , 5.3®,®® 3534 Parkway Lump Sum $ /� 530. 00 3578 Parkway Lump Sum $ !, 5.3c). on 3596 Parkway Lump Sum $J, 530. 00 2 BID FORM 3530 S. 27"' Lump Sum $ a,`aL�0100 3393 S. 27"' Lump Sum $`5 30.00 3360 S. 29th Lump Sum $lrS30. 00 3354 S. 30"' Lump Sum $/"530.00 3478 S. 30" Lump Sum $ 1,530.0 0 3004 Meah Lane Lump Sum $!, 530. 00 TOTAL BASE BID - SCHEDULE 1 $ 9191, ?6 5 , SO ✓ elGllr" 10USd'nW' ed9�T Uh�r� s!, ®l�%y� 'anal S®/vo �oG�rS (SCHEDULE I BASE BID TOTAL - WRITTEN WORDS` 7` BID SCHEDULE SCHEDULE 2—SIDEWALK REPAIRS NO, ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE (Figures) (Fimures) 201 Concrete removal S.F. $:3- 65 10,250 $ 37 -//Z 50 � and disposal J 202 6" Concrete S.F. $7- y® 755 $ sidewalk in place 203 4 Concrete S.F. $ 6, 60 9,495 $ 00 sidewalk in place + 204 Detectable S.F. $ /-//. 00 20 $ 0.00 f Warning TOTAL BASE BID - SCHEDULE 2 $ ���/ ��• / (SCHEDULE 2 BASE BID TOTAL - WRITTEN WORDS) 3 BID FORM BID SCHEDULE SCHEDULE 3 —CURB REPLACEMENTS NO, ITEM UNIT UNIT PRICE QUANTITY TOTAL PRICE (Figures) (Figures) 301 Unclassified exca- SF $ . 60 7,300 $ M 60,60 ✓ vation above subgrade 302 6" Thick Concrete SF $ -7. 7® 2,526 $ 1-7 y j® P-0 303 4"Thick Concrete SF $ C 570 473 $ , 07Y 50 304 Combined concrete LF $ 3� 00 866 $ 9, `��?' 00 curb and gutter 305 3" thickness of asphalt concrete pavement surface course, grade B. SF $ /O, ®® 1,930 $ M, 300. ®o 306 Storm drain inlets Each $ _85Z50 2 $ ��71S. 00 307 Construction LS $ ®®.®4 LS $ /9, 000. 0(� Traffic Control TOTAL BASE BID—SCHEDULE 3 $ ✓ CAdzen �400_5aA 11)4t Alunalrd 0 a'4411r (SCHEDULE 3 TOTAL BASE BID—WRITTEN WORDS) --------------------------------------------------------------------------------------------------------------------------- TOTAL BASE BID - SCHEDULES 1, 2 AND 3 $ ,;1 0, 3/ . e l n e,_ H2O Y `Vlt r_ /01 Q YJ (SCHEDULES 1, 2 AND 3 BA E BID TOTAL- WRITTEN WORDS) The undersigned Bidder acknowledged receipt of the following Addenda,which have been considered in 4 BID FORM preparation of this Bid: No. Ode Dated No. Dated Dated Da No. t Submitted this _ day of Q" , 2016. SIGNATURE OF BIDDER: Montana Contractor Registration er (�O g If an individual: doing business as If a Partnership: by u� partner 'j If a Corporation: (a) Mo w u-b Cor? otL, T fly' by (Seal & Title V ice 1,0 Attest) Business Address of Bidder: If Bidder is a joint venture, other party must sign below: 5 BID FORM NON-DISCRIMINATION AFFIRMATION FORM l t 4F 4�1 r,L-[name of entity submitting]hereby affirms it will not discriminate on the basis of race,color,religion, creed,sex,age,marital status,national origin,or because of actual or perceived sexual orientation, gender identity or disability in the performance of work performed for the city of Bozeman,if a contract is awarded to it,and also recognizes the eventual contract,if awarded,will contain a provision prohibiting discrimination as described above and that this prohibition shall apply to the hiring and treatment of the i;<� ✓c2_ _ _4,o [name of entity submitting] employees and to all subcontracts it enters ll1tV in perfort ante or Lile agree111e11C Wltbi uw Glty Vl Duz 1d11. Signature of Bidd4ersE�h authoriz o sign on behalf of the bidder NOTICE OF AWARD Dated: Amal lTO: Knife River-Belgrade ADDRESS: P.O. Box 9, Belgrade,MT 59714 PROJECT: City of Bozeman 2016 Sidewalk Installations and Repairs and Curb Replacements CONTRACT FOR: installation and repair of concrete sidewalks and curb replacements I You are notified that your Bid dated June 8,2016,for the above Contract has been considered. You are the I apparent Successful Bidder and have been awarded a Contract for installation and repair of concrete sidewalks,and curb replacements. The Contract Price of your Contract is:three hundred twenty thousand three hundred fifteen and 70/100 Dollars ($320,315.70). Three copies of the proposed Contract Documents accompany this Notice of Award. i You must comply with the following conditions precedent within fifteen(15)days of the date of this l Notice of Award,that is, by Ji 1 Lin S. Z.UI Lo. 1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders(page 7),General Conditions(paragraph 5.01)and Supplementary Conditions I (paragraph SC-5.02). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in I the General Conditions(paragraph 5.03) and Supplementary Conditions (paragraph SC-5.04). Failure to comply with these conditions within the time specified will entitle OWNER to consider your 1 Bid abandoned,to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MO TANA ATTEST: 21 (CITY MANAGER)' "TT CLERK = � DATE: a 1 PENAL SUM FORM BID BOND Any singular reference to Bidder, Surety,Owner or other party shall be considered plural where applicable. BIDDER(Name and Address): SURETY(Name and Address of Principal Place of Business): OWNER(Name and Address): BID Bid Due Date: Description (Project Name and Include Location): BOND Bond Number: Date(Not earlier than Bid due date): Penal sum $ (Words) (Figures) Surety and Bidder,intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer,agent,or representative. BIDDER SURETY (Seal) (Seal) Bidder's Name and Corporate Seal Surety's Name and Corporate Seal By: By: Signature Signature(Attach Power of Attorney) Print Name Print Name Title Title Attest: Attest: Signature Signature Title Title Note:Above addresses are to be used for giving any required notice. Provide execution by any additional parties, such as joint venturers, if necessary. EJCDC C-430 Bid Bond(Penal Sum Form) Prepared by the Engineers Joint Contract Documents Committee. Page 1 of 2 PENAL SUM FORM 1. Bidder and Surety,jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder's and Surety's liability. Recovery of such penal sum under the terms of this Bond shall be Owner's sole and exclusive remedy upon default of Bidder. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents. 3. This obligation shall be null and void if: 3.i owner accepts Bidder's-mid and Bidder delivers within tile t►iiic required by the Bidding Documents(or any extension thereof agreed to in writing by Owner)the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents,or 3.2 All Bids are rejected by Owner,or 3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and,if applicable,consented to by Surety when required by Paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness,identifying this Bond and the Project and including a statement of the amount due. 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery,commercial courier,or by United States Registered or Certified Mail,return receipt requested,postage pre-paid,and shall be deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term"Bid"as used herein includes a Bid, offer,or proposal as applicable. EJCDC C-430 Bid Bond(Penal Sum Form) Prepared by the Engineers Joint Contract Documents Committee. Page 2 of 2 I AGREEMENT FORM THIS AGREEMENT is dated as of the _e�' day of A AJAA in the year 2016 , by and between CITY OF BOZEMAN,hereinafter called OWNER,and Knife River-Belgrade hereinafter called CONTRACTOR. OWNER AND CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The project work is generally described as follows: sidewalk installations and repairs, and curb replacements. The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: City of Bozeman 2016 Sidewalk Installations and Repairs,and Curb Replacements. Article 2. CONTRACT TIME. i 2.1 The Work will be completed within 75 days after the date when the contract time commences to run as provided in the General Conditions. Final payment will be withheld until final completion and acceptance of the Work, as stipulated in this Agreement. 2.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence in this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified above,plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense and difficulties involved in proving,in a legal or arbitration proceeding,the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly,instead of requiring any such proof,OWNER and CONTRACTOR agree that as liquidated damages for delay(but not as a penalty) CONTRACTOR shall pay OWNER one hundred dollars ($ 100.00) for each day that expires after the time specified herein until the Work is substantially complete. Article 3. CONTRACT PRICE. 3.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents the sum(subject to adjustment as provided in the Contract Documents) l of three hundred twenty thousand three hundred fifteen and 70/100 Dollars($320,315.70). l I Article 4. PAYMENT PROCEDURES. CONTRACTOR shall submit applications for payment in accordance with the General Conditions. Applications for payment will be processed as provided in the General Conditions. 4.1 Progress Payments. OWNER will make progress payments monthly on account of the contract price on the basis of CONTRACTOR'S application for payment as recommended by ENGINEER. All progress payments will be on the basis of the progress of the Work measured by the schedule of values provided for in the General Conditions. 4.1.1 The OWNER may retain five (5) percent of the amount due the CONTRACTOR in accordance with the General Conditions and as outlined herein. 4.2 Final Payment. Upon final completion and acceptance of the Work in accordance with the General Conditions,OWNER shall pay the remainder of the contract price as recommended by ENGINEER. Article 5. INTEREST. All monies not paid when due hereunder shall bear interest at the simple rate established by the Federal Cost of Money Rate commencing at the time of a claim. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, locality, and with all local conditions and federal, state and local laws, ordinances,rules and regulations that in any manner may affect cost,progress or performance of the Work. 6.2 CONTRACTOR has studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost,progress or performance of the Work which were relied upon by ENGINEER in the preparation of the drawings and specifications and which have been identified in the modifications to the General Conditions. 6.3 CONTRACTOR has made or caused to be made examinations,investigations and tests and studies of such reports and related data in addition to those referred to above as he deems necessary for the performance of the Work at the contract price,within the contract time and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations,tests, reports or similar data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.5 CONTRACTOR has given ENGINEER written notice of all conflicts,errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. Article 7. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR are attached to this Agreement, made a part hereof and consist of the following: 7.1 This Agreement. 7.2 Exhibits to this Agreement (if any). 7.3 Performance Bond, Payment Bond, and Bid Bond. 7.4 Invitation to Bid. 7.5 Instructions to Bidders and Bid Form. 7.6 Certificate(s) of Insurance. 7.7 General Conditions (by reference). 7.8 Supplementary Conditions. 7.9 Wage Rates. 7.10 Special Provisions and Measurement and Payment. 7.11 Montana Public Works Specifications,Sixth Edition,and City of Bozeman Modifications to Montana Public Works Standard Specifications Sixth Edition, March 31, 2011 (by reference). 7.12 Appendix A and Appendix B. 7.13 Addenda listed on the Bid forms. 7.14 CONTRACTOR'S executed Bid forms. 7.15 Documentation submitted by CONTRACTOR prior to Notice of Award. 7.16 Notice of Award. 7.17 Notice to Proceed. 7.18 Any modification, including Change Orders, duly delivered after execution of Agreement. 7.19 Any Notice of Partial Utilization. 7.20 Notice of Substantial Completion. 7.21 Notices of Final Completion and Acceptance. There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be altered, amended or repealed by a modification(as defined in the General Conditions). Article 8. MISCELLANEOUS. 8.1 Terms used in this Agreement which are defined in the General Conditions shall have the meanings indicated in the General Conditions, 8.2 This Agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the OWNER and the CONTRACTOR respectively and his partners, successors, assigns,and legal representatives. Neither the OWNER nor the CONTRACTOR shall have the right to assign, transfer or sublet his interest or obligations hereunder without written consent of the other party. The OWNER reserves the right to withdraw at any time from any subcontractor where Work has proven unsatisfactory the right to be engaged in or employed upon any part of the Work. 8.3 In the event it becomes necessary for either party to this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice required herein, then the prevailing party or the party giving notice shall be entitled to reasonable attorney's fees and costs. 8.4 Any amendment of modifications of this Agreement or any provisions herein shall be made in writing and executed in the same manner as this original document and shall after execution become a part of this Agreement. , i 8.5 The Contractor agrees not to discriminate in the fulfillment of this Agreement on the basis of race, color, religion, creed, sex, age, marital status, national origin, or actual or perceived sexual orientation,gender identity or disability. The Contractor agrees this requirement shall apply to the hiring and treatment of the Contractor's employees and to all subcontracts. IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and year first p � Y Y above written. I (CO RACTOR) By (SEAL&) (ATTEST) Tit eS/UG/L_ JOINT VENTURE By (SEAL &) (ATTEST) Title Ci f tv o Bozeman � (OWNER) B Y AlN(j(CITY MANAGER) (SEAL' r4 e _ e e APPROVED AS TO FORM: e , p (CITY ATTO EY) I I 1 PERFORMANCE BOND Any singular reference to Contractor,Surety, Owner,or other party shall be considered plural where applicable. CONTRACTOR (Nante and Address): SURETY (Name,and Address of Principal Place of Business): Knife River-Belgrade Liberty Mutual Insurance Company P.O.Box 9 175 Berkeley Street Belgrade,MT 59714 Boston,MA 02116 OWNER(Nante and Address): AND City of Bozeman Travelers Casualty and Surety Company of America 121 N.Rouse Avenue,P.O.Box 1230 One Tower Square-2SHS Bozeman,MT 59771 Hartford,CT 06183 V CONTRACT Effective Date of Agreement: Amount:$320,315.70 Description(Name and Location):2016 Sidewalk Installations and Repairs,and Curb Replacements BOND Bond Number:190036512/106522488 Date(Not earlier than Effective Date of Agreement): Amount:$320,315.70 IModifications to this Bond Form:NONE``t,,,,,,,�t� Surety and Contractor,intending to be 'lii' '•subject to the terms set forth below,do each cause this Performance Bond to be duly exed Cited bAn au It x' t ficer,agent,or representative. I = SEAL CONTRACTOR AS PRINCIPAL 199p SVRI&Y ' Ltbert�Nutual Insurance Company& Knife River-Bel ade { d4tl). ,,•Trawlers Casualty and Surety Company of America (Seal) Contractor's N e and C orate al '�,,�0 7 q �Aurety's Name an o>�ro' Se If tt �� By: �, �-- , 1 y: I Signature Signature( ttach ower of y) Pamela L. Whalies-Asst. Sec. Nicole Langer Print Name Print Name Attorney-in-Fact Title Title J/ Attest: Attest: Signatt re tune Vj Witness l Title Title J Note; Provide execution by additional parties, such as joint venturers, if necessary. I U'JCDC C•610 wrformanceBond Prepared by the Engineers Joint contract Documents Conunittee. Page 1 of 3 Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner for the performance of the Contract, which is incorporated herein by reference. 1. If Contractor performs the Contract,Surety and Contractor have no obligation under this Bond,except to participate in conferences as provided in Paragraph 2.1. 2. If there is no Owner Default,Surety's obligation under this Bond shall arise after: 2.1 Owner has notified Contractor and Surety, at the addresses described in Paragraph 9 below, that Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with Contractor and Surety to be held not later than 15 days after receipt of such notice to discuss methods of performing the Contract. If Owner, Contractor, and Surety agree, Contractor shall be allowed a reasonable time to perfomn, the Contract,but such an agreement shall not waive Owner's right,if any,subsequently to declare a Contractor Default; and 2.2 Owner has declared a Contractor Default and formally terminated Contractor's right to complete the Contract. Such Contractor Default shall not be declared earlier than 20 days after Contractor and Surety have received notice as provided in Paragraph 2.1; and 2.3 Owner has agreed to pay the Balance of the Contract Price to: 1. Surety in accordance with the terms of the Contract; or 2. Another contractor selected pursuant to Paragraph 3.3 to perform the Contract. 3. When Owner has satisfied the conditions of Paragraph 2,Surety shall promptly,and at Surety's expense, take one of the following actions: 3.1 Arrange for Contractor, with consent of Owner,to perform and complete the Contract;or 3.2 Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or 3.3 Obtain bids or negotiated proposals from qualified contractors acceptable to Owner for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by Owner and contractor selected with Owner's concurrence,to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Contract, and pay to Owner the amount of damages as described in Paragraph 5 in excess of the Balance of the Contract Price incurred by Owner resulting from Contractor Default;or 3.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor, and with reasonable promptness under the circumstances: 1. After investigation, determine the amount for which it may be liable to Owner and, as soon as practicable after the amount is determined, tender payment therefor to Owner;or 2. Deny liability in whole or in part and notify Owner citing reasons therefor. 4. If Surety does not proceed as provided in Paragraph 3 with reasonable promptness, Surety shall be. deemed to be in default on this Bond 15 days after receipt of an additional written notice from Owner to Surety demanding that Surety perform its obligations under this Bond,and Owner shall be entitled to enforce any remedy available to Owner. If Surety proceeds as provided in Paragraph 3.4, and Owner refuses the payment tendered or Surety has denied liability, in whole or in part, without further notice Owner shall be entitled to enforce any remedy available to Owner. 5, After Owner has terminated Contractor's right to complete the Contract,and if Surety elects to act under Paragraph 3.1, 3.2, or 3.3 above, then the responsibilities of Surety to Owner shall not be greater than those of Contractor under the Contract, and the responsibilities of Owner to Surety shall not be greater than those of Owner under the Contract. To the limit of the amount of this Bond,but subject to commitment by Owner of the Balance of the Contract Price to mitigation of costs and damages on the Contract,Suety is obligated without duplication for: EJCDC C•610 Performance Bond Prepared by the Engineers Joint Contract Documents Conuuittee. Page 2 of 3 5.1 The responsibilities of Contractor for correction of defective Work and completion of the Contract; 5.2 Additional Iegal, design professional, and delay costs resulting from Contractor's Default, and resulting from the actions of or failure to act of Surety under Paragraph 3; and 5.3 Liquidated damages, or if no liquidated damages are specified in the Contract, actual damages caused by delayed performance or non-performance of Contractor. 6. Surety shall not be liable to Owner or others for obligations of Contractor that are unrelated to the Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than Owner or its heirs,executors,administrators,or successors. 7. Surety hereby waives notiee of any change, 1nrltrrlincr changes of time, to Contract or to related subcontracts,purchase orders, and other obligations. 8. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the Work or part of the Work is located, and shall be instituted within two years after Contractor Default or within two years after Contractor ceased working or within two years after Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 9. Notice to Surety, Owner,or Contractor shall be mailed or delivered to the address shown on the signature page. 10. When this Bond has been furnished to comply with a statutory requirement in the location where the Contract was to be performed,any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 11. Definitions. 11.1 Balance of the Contract Price: The total amount payable by Owner to Contractor under the Contract after all proper adjustments have been made, including allowance to Contractor of any amounts received or to be received by Owner in settlement of insurance or other Claims for damages to which Contractor is entitled, reduced by all valid and proper payments made to or on behalf of Contractor tinder the Contract. 11.2 Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 11.3 Contractor Default: Failure of Contractor,which has neither been remedied nor waived,to perform or otherwise to comply with the terms of the Contract. 11.4 Owner Default: Failure of Owner,which has neither been remedied nor waived, to pay Contractor as required by the Contract or to perform and complete or otherwise comply with the other terms thereof. FOR INFORMATION ONLY—(Name,Address and Telephone)Willis of Minnesota,Inc. Surety Agency or Broker: 1600 Utica Avenue South,Suite 600 Owner's Representative(Engineer or other part}): Minneapolis,MN 55416 Phone: 763.302.7100 EJCDC C-610 Performance Bond Prepared by the Engineers Joint Contract Documents Committee. Page 3 of 3 9 PAYMENT B OND Any singular reference to Contractor,Surety,Owner,or other party shall be considered plural where applicable. CONTRACTOR(Name acid Address): SURETY(Name, and Address of Principal Place of Knife River-Belgrade Business): P.O.Box 9 Liberty Mutual Insurance Company Belgrade,MT 59714 175 Berkeley Street O�1E Name nrid Address):' Boston,MA 02116 i o ozeman AND 1 121 N.Rouse Avenue,P.O.Box 1230 Travelers Casualty and Surety Company of America Bozeman MT 59771 One Tower Square-2SHS CONTI?-i—''T Hartford,CT 06183 Effective Date of Agreement: Amount:$320,315.70 Description(Name and Location):2016 Sidewalk Installations and Repairs,and Curb Replacements V BOND g Bond Number:190036512/106522488 Date(Not earlier than Effective Date of Agreement): Amount:$320,315.70 Modifications to this Bond Form:NONE Surety and Contractor,intending to be le&4li btlt fld,�,ereby,subject to the terms set forth below,do each cause this Payment Bond to be duly e � tt�T 'itltio�ized officer,agent,or representative. �. 'pORP0)y ?Q CONTRACTOR AS PRINCIPAL S 08MTY EAL tibey Mutual Insurance Company& Knife River-Belgrade = ( Q irav lers Casualty and Surety Company_of_A_merica(Seal) Contracto• ame and oip to weal'. S�ety's Name a Corporate S l ' Signature Sign t 6'56-iver2oAorey) Pamela L. Michalies-Asst. Sec. Nicol an er Print Name Print Name Attorney-in-Fact Title Title Attest: A�- Attest: IN, - Signature 9l'inalure WI� V]f C}S Witness ✓/j�I Title Title Note. Provide execution by additional parties, such as joint venturers, f necessary. EJCDC C-615 Payment Bond Prepared by the Engineers Joint Contract Documents Committee. Pagel of 3 I 1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner to pay for labor,materials, and equipment furnished by Claimants for use in the performance of the Contract,which is incorporated herein by reference. 2. With respect to Owner,this obligation shall be null and void if Contractor: 2.1 Promptly makes payment,directly or indirectly, for all sums due Claimants,and 2.2 Defends,indemnifies, and holds harmless Owner from all claims, demands,liens, or suits alleging non-payment by Contractor by any person or entity who furnished labor, materials, or equipment for use in the performance of the Contract, provided Owner has promptly notified Contractor and Surety (at the addresses described in Paragraph 12) of any claims, demands, liens, or suits and tendered defense of such claims, demands, liens, or suits to Contractor and Surety, and provided there is no Owner Default. 3. With respect to Claimants, this obligation shall be null and void if Contractor promptly makes payment, directly or indirectly,for all sums due. 4. Surety shall have no obligation to Claimants under this Bond until: 4.1 Claimants who are employed by or have a direct contract with Contractor have given notice to Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and,with substantial accuracy,the amount of the claim. 4.2 Claimants who do not have a direct contract with Contractor: 1. Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, within 90 days after having last performed labor or last furnished materials or equipment it in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials or equipment were furnished or supplied,or for whom the labor was done or performed; and 2. Have either received a rejection in whole or in part from Contractor, or not received within 30 days of furnishing the above notice any communication from Contractor by which Contractor had indicated the claim will be paid directly or indirectly;and 3. Not having been paid within the above 30 days, have sent a written notice to Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to Contractor. 5. if a notice by a Claimant required by Paragraph 4 is provided by Owner to Contractor or to Surety,that is sufficient compliance. 6. When a Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at Surety's expense take the following actions: 6.1 Send an answer to that Claimant, with a copy to Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7. Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by Surety. 8. amounts owed by Owner to Contractor under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any performance bond. By Contractor furnishing and Owner accepting this Bond, they agree that all funds earned by Contractor in the performance of the Contract are dedicated to satisfy obligations of Contractor and Surety under this Bond, subject to Owner's priority to use the funds for the completion of the Work. EJCDC C-615 Payment Bond Prepared by the Engineers Joint Contract Documents Committee. Page 2 of 3 9. Surety shall not be liable to Owner, Claimants, or others for obligations of Contractor that are unrelated to the Contract. Owner shall not be Iiable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10. Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts,purchase orders, and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a coma of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Paragraph 4.1 or Paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to Surety, Owner, or Contractor shalt be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, Owner, or Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory requirement in the location Where the Contract was to be performed, any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein.The intent is that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. Definitions 15.1 Claimant: An individual or entity having a direct contract with Contractor, or with a first-tier subcontractor of Contractor, to furnish labor,materials,or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment"that part of water, gas, power,light,heat, oil, gasoline, telephone service, or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of Contractor and Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials, or equipment were furnished. 15.2 Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto. 15.3 Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract, or to perform and complete or otherwise comply with the other terms thereof. rOR INFORMATION ONLY (Nance,Address,and Telephone)Willis of Minnesota,Inc. Surety Agency or Broker: 1600 Utica Avenue South,Suite 600 Owner's Representative(Engineer or other): Minneapolis,MN 55416 Phone:763.302.7100 EJCDC C•615 Payment Bond Prepared by the Engineers Joint Contract Documents Committee. Page 3 or 3 Surety Acknowledgment State of MINNESOTA I } ss. County of Hennepin I On this day of 20 ,before me personally came Nicole Langer, to me known,who being by me duly sworn, did depose and say that she is the Attorney-in-Fact of Liberty Mutual Insurance Company & Travelers Casualty and Surety Company of America described in and which executed the above instrument; that she/he knows the seal of said corporation; that the seal affixed to said instruments is such corporate seal,that it was so affixed by order of the Board of Directors Iof said corporation, and that she/he signed her/she/his name to it by like order. I Notary Public I MICHELLEDIANESYLVESTER Notary Public I state of Minnesota My Commission Expires f,�,• January 31.2018 I I I 1 I l THIS POWER-OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED-BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority to bind thei Company except in the manner and to the extent herein stated. - _-- - - - Certificate Now 7339621 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company : West American Insurance Company, POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire&Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of . the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the-State of Massachusetts,and WestAmerican-lnsurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the'Companies'j,pursuant-to and by authority herein set forth,does hereby name,constitute and appoint, Brian D.Carpenter;Craig Olmstead;-HeathefFl Coecitel,Jessica Hoff;Jill N=Swanson;Laurie Pflug;Michelle Sylvester;Nicole Langer; Nina E.Werstein all of the city of Minneapolis state of AN each individually if there be more than one named;Its true and lawful attorney in.fact to make,execute,seat,acknowledge and deliver,for and on its behalf as surety and as its act anddeed,any-and all undertakings;bonds,recognizances and other surety obligations;in pursuance of these presents and shall be as binding upon the Companies as if they tave_been duty signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, is Power of Attomeyhas been subscribed-by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 22nd dayof April 2016 ' PNo cgsU ���1Ns� 1r+suk NtNsuq - - American Fire and Casualty Company The Ohio Casualty Insurance Company N a n Q o Liberty Mutual Insurance Company 1906 0 o 1919 > 1z tv a o ' 9 �b W 1991 = West mencan Insurance Company � A ^t<St6N4�!= - � '•'�kN0. F - By:- David M.Care Assistant secretaryC " STATE OF PENNSYLVANIA --SS- COUNTY COUNTY OF MONTGOMERY C p� On this 22nd day of April 2016 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of American Fire and co a) Casualty Company,Liberty Mutual Insurance Company,The Ohio Casualty Insurance Company,and West American Insurance Company,and that he,as such,being authorized so to do, =>,W O execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer, N C E IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. O _v M ya PAST COMMONWEALTH OF PENNSYLVANIA r 44 Q`O Notarial Seal �G% � : I C N c° y v Teresa Pastella,Notary Public By- L ot= Plymouth Twp.,Montgomery County �w My Commission Expires March 28,2017 Teresa Pastella,Notary Public 3 y 0 y�Y6`7P��' Member,Pennsylvania Association of Notaries -O 146.s cc r= its This Power of Attorney is made and executed pursuant to an by authority of the following By-laws and Authorizations ofAmerican Fire and Casualty Company,The Ohio Casualty Insurance fn c Company,Libert Mutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: :y++ Y P Y, P Y 9 r o o> L ARTICLE IV-OFFICERS-Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O c a; to such limitation as the Chairman or the President may prescribe,shall appoint such attorneys in fact;as may be necessary to act in behalf of the Corporation to make,execute,seal, d ( O S acknowledge and deliver-as surety any and all undertakings,bonds,recogniiances and other surety obligations. Such attomeys-m-fact;subject to the limitations set forth in their respective powers of attorney;shall have full power to bind-the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.-When to d executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under >'Q the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. I* .00 =tV 4.1 c ARTICLE XIII=Execution of Contracts-SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, E 00 and subject to such limitations as the chairman or the president may prescribe,shall appoint such attomeys-in-fact;as may be necessary to act in behalf of the Company to make,execute, _M O 4-00 seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys in-factsubject to the limitations set forth in their Z v respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so O C3 V executed such instruments shall be as binding as if signed by.the president and attested bythe secretary. C co Certificate of Designation-The President of the Company,acting pursuant to tt a Bylaws of the Company,authorizes David M Carey Assistant Secretary to appoint such attorneys-in- fact as maybe necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as_suretyany and all undertakings;.bonds,recognizances and other surety- obligations. _ - -- Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon acertified copy of any.power of atiomey issued by the Company in connection with surely bonds,shall be.Valiid and binding upon the Company with the same force and effect as though manually affixed. I,Gregory W.Davenport,the undersigned,Assistant Secretary ofAmerican Fire and Casualty Company The Ohio Casualty-Insurance Company-Liberty Mutual Insurance Company,and West American Insurance-Company-do hereby eelify that the original power of attorney of which the foregoing.is a full,true-"and correct copy of the Power of-Attorney executed by said Companies,is in full force and effect and has not:beer revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this- -day of 20 y0 Cqs t'f INsU ytNSup aVNSUp - - �4,�craORi>i�9�� a 1906 p o 7919 1912 1491 BY: o P D f �� _ Gregory W.Davenport,Assistant-Secretary 347 of 1500 LMS 12873 122013' WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER I AI . POWER OF ATTORNEY I TRAVELERS 1 Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company l Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America ISt.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company 1 Attorney-In Fact No. 229267 Certificate No. 006779230 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company,St. Paul Fire and Marine Insurance Company, St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,hic.,is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Jill N.Swanson,Laurie Pflug, Nina E.Werstein,Brian D.Carpenter, Nicole Langer,Jessica Hoff,Heather R.Goedtel,Michelle Sylvester,and Craig Olmstead 1 of the City of Minneapolis State of Minnesota their true and lawful Attomey(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. 1 IN WITNESS WHEREOF,the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed,this 9th l day of May , 2016 IFarmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company G,.SU,� �It1Y FIRE 02 VpYDq�JT� +�dVO+rfk G Gl — �9 /rCpRPORA)`S ?�% .yC' cir G9 a �O 0 3t' b" o PIC08fURAitO g' z; a( --- F.05 iW:�oaeoanrf;v^: 3J �� 'ar�rto COtIN �" 7896 Y�qy�+ Sa 19Jr1 n' SEAL.io": 1Sk SEAL;z; CONN. o e ...... i�G •� o�' 03 A'•� °'jS':•lji s.�.s� .... eF bbi 'ayD�r Qhf . ��� l 1 State of Connecticut By: J City of Hartford ss. Robert L.Raney,Senior Vice President J On this the 9th day of May 2016 before me personally appeared Robert L.Raney,who acknowledged himself to J be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IG.T� In Witness Whereof,I hereunto set my hand and official seal. �� VN W �" C' ' 11 My Commission expires the 30th day of June,2021. A �p * Marie C.Tetreault,Notary Public l 58440-5-16 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT (See Montana Public Works Standard Specifications 6th Edition) SECTION 00810 SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS These Supplementary Conditions to the General Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. C-700, 2007 Edition) and other provisions of the Contract Documents as indicated below. All provisions that are not so amended or supplemented remain in full force and effect. SC -2.01 DELIVERY OF BONDS Add the following to Paragraph: 2.01.A Engineer shall furnish to Contractor six copies of the Agreement and other Contract Documents bound therewith. Contractor shall execute the Agreement, attach executed copies of the required Bonds, Power of Attorney, and Certificate of Insurance and submit all copies to Engineer who will forward them to the Owner. Owner shall execute all copies and return two copies to the Contractor. Owner shall also furnish a counterpart or conformed copy to the Engineer and shall retain three copies. SC —2.03 NOTICE TO PROCEED Delete the first sentence of Paragraph 2.03.A of the General Conditions and insert the following in its place: Following the execution of the Agreement by the Owner and the Contractor, written Notice to Proceed with the Work shall be given by the Owner to the Contractor. The Contract Time will commence to nun on the day indicated in the Notice to Proceed. SC -2.05 BEFORE STARTING CONSTRUCTION Add a new paragraph immediately after paragraph 2.05.A.3 of the General Conditions which is to read as follows: 2.05.A.4 Contractor shall submit a preliminary list of construction equipment with hourly rates, owned or rented by the Contractor and all Subcontractors that will be used in the performance of the Work. The equipment list will include information necessary to confirm the hourly rates per Paragraph 11.01.A.5.c of the General Conditions and these Supplementary Conditions including: make, model, and year of manufacture as well as the horse power, capacity or weight, and accessories. Section 00810—5 h Edition Supplementary Conditions to the General Conditions Page 1 of 12 SC -2.07 INITIAL ACCEPTANCE OF SCHEDULES Delete the first paragraph of 2.07.A of the General Conditions in its entirety and insert the following in its place: Prior to the first application for payment all schedules and documents identified in sparagraph 2.05.A shall be finalized and acceptable to the Engineer and Owner. No progress payment shall be made to Contractor until acceptable schedules are submitted to Engineer and Owner as provided below. Acceptance of these schedules and documents by either Engineer or Owner will neither impose on Engineer or Owner responsibility for the sequencing, scheduling or progress of the Work and will not interfere with or relieve Contractor from Contractor's full responsibility therefore. Add the following after Paragraph 2.07.A.3: Contractor's Schedule of Construction Equipment will be acceptable to Engineer as to form and substance if it provides the necessary information to reference the equipment and establish the hourly rates in accordance with paragraph 11.01.A.5.c. SC -4.01 AVAILABILITY OF LANDS Add to Paragraph 4.01.0 of the General Conditions the following: If it is necessary or desirable that the Contractor use land outside of the Owner's easement or right-of-way, the Contractor shall obtain consent from the property owner and tenant of the land. The Contractor shall not enter for materials delivery or occupy for any other purpose with men, tools, equipment, construction materials, or with materials excavated from the site, any private property outside the designated construction easement boundaries or right-of-way without written permission from the property owner and tenant. SC -4.02- SUBSURFACE AND PHYSICAL CONDITIONS Delete the first sentence of 4.02.A and replace with the following: A. Reports and Drawings: The Special Provisions identify: Delete the reference to Supplementary Conditions in paragraph 4.02.13 and replace with Special Provisions. Section 00810—6"'Edition Supplementary Conditions to the General Conditions Page 2 of 12 SC—4.03 -DIFFERING SUBSURFACE OR PHYSICAL CONDITIONS Add the following to the end of Paragraphs 4.03.A. Contractor to notify Owner and Engineer in writing about differing subsurface or physical conditions within 15 days of discovery and before disturbing the subsurface as stated above. No claim for an adjustment in the contract price or contract times (or Milestones) will be valid for differing subsurface or physical conditions if procedures of this paragraph 4.03 are not followed. SC -4.04 -UNDERGROUND FACILITIES Add the following new paragraph immediately after Paragraph 4.04.A.2. 3. At least 2 but not more than 10 business days before beginning any excavation, the Contractor shall according to MCA 69-4-501, notify all owners of underground facilities and coordinate the Work with the owners of such underground facilities. The information shown or indicated in the Contract Documents with respect to existing underground facilities is based on information and data obtained from the owners of the facilities without field exploration, and as such, Owner and Engineer are not responsible for the accuracy or completeness of such information or data. SC -4.06 - HAZARDOUS ENVIORNMENTAL CONDITION AT SITE Change the first sentence of paragraph A to read as follows: A.Reports and Drawings: The Special Provisions identify those reports.......... SC- 5.02 LICENSED SURETIES AND INSURERS Add the following to the end of Paragraph 5.02.A Without limiting any of the other obligations or liabilities of the Contractor, Contractor shall secure and maintain such insurance from an insurance company (or companies) authorized to write insurance in the State of Montana,with minimum"A.M.Best Rating" of A-, VI, as will protect the Contractor, the vicarious acts of subcontractors, the Owner and the Engineer and their agents and employees from claims for bodily injury, or property damage which may arise from operations and completed operations under this Agreement. Contractor shall not commence work under this Agreement until such insurance has been obtained and certificates of insurance, with binders, or certified Section 00810—60'Edition Supplementary Conditions to the General Conditions Page 3 of 12 copies of the insurance policy shall have been filed with the Owner and the Engineer. All insurance coverage shall remain in effect throughout the life of the Agreement, except that the Contractor shall maintain the Commercial General Liability Policy including product and completed operations coverage for a period of at least one year following the substantial completion date for property damage resulting from occurrences during the agreement period. SC—5.04 CONTRACTOR'S LIABILITY INSURANCE Add the following new paragraphs immediately after Paragraph 5.04.13: C. The limits of liability for the insurance required by Paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Law or Regulations: 1. Workers' Compensation, etc. under Paragraphs 5.04.1 and 5.04.2 of the General Conditions. a. State Statutory b. Applicable Federal (e.g.Longshoremans) Statutory C. Employer's Liability $500,000.00 2. Contractor's Liability Insurance under Paragraphs 5.04.A.3 through 5.04. A.6 of the General Conditions which shall also include completed operations and product liability coverage. a. GENERAL AGGREGATE $3,000,000.00 b. Products-Completed Operations Aggregate $ 3,000,000.00 c. Personal and Advertising d. Each Occurrence (Bodily Injury and Property Damage) $ 1,000,000.00 e. Coverage will include: 1. Premises - Operations 2. Operations of Independent Contractor 3. Contractual Liability 4. Personal Injury 5 Products and Completed Operations Section 00810—6 s Edition Supplementary Conditions to the General Conditions Page 4 of 12 6. Broad Form Property Damage will include explosion, ng and underground where applicable. collapse,blasti 7. Per Project Aggregate Endorsement 3. Automobile Liability under Paragraph 5.04.A.6 of the General Conditions: a. Bodily InXury: Each Person $ 500,000.00 Each Accident $ 1,000,000.00 Property Damage: Each Accident $1,000,000.00 (or) b. Combined Single Limit $ 1,000,000.00 Coverage to Include 1. All Owned 2. Hired 3. Non-Owned 4. Contractor's Liability Insurance under 5.04.A.3 through 5.04.A.6 may be satisfied by primary insurance or a combination of primary and excess or umbrella insurance. Primary occurrence limit cannot be less than $1,000,000.00. Deductible not to exceed$5,000.00 per occurrence on property damage. 5. Add a new paragraph at the end of Paragraph 5.04.B. 1 of the General Conditions as follows: The Contractor's insurance coverage shall name the Owner, and Engineer and Engineer's Consultants as an additional insured under Commercial General Liability, Automobile Liability,Excess or Umbrella polices. 6. The Contractual Liability coverage required by Paragraph 5.04.B.4. of the General Conditions shall provide coverage for not less than the following amounts: Each Occurrence $ 1,000,000.00 Aggregate $ 3,000,000.00 Section 00810—6 h Edition Supplementary Conditions to the General Conditions Page 5 of 12 SC- 5.04.B.5 CANCELATION NOTICE Amend paragraph 5.04.13.5 of the General Conditions by striking out the words "30 days" and replacing them with the words "45 days" and as so amended paragraph 5.04.13.5 remains in effect. SC -5.06 PROPERTY INSURANCE Delete Article 5.06.A of the General Conditions in its entirety and insert the following in its place: A. Contractor shall purchase and maintain property insurance upon the work at the site in the amount of the full replacement cost thereof(subject to such deductible amounts as may be provided in these Supplementary Conditions or required by Laws and Regulations). This insurance shall: 1. Include the interests of Owner, Contractor, Subcontractors, Sub- Subcontractors Engineer, Engineer's Consultants, and any other persons or entities identified in the Supplementary Conditions, each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured; 2. be written on a Builder's Risk "all risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss and damage to the Work, temporary buildings, false work and materials and equipment in transit and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage (other than caused by floods), and other perils or causes of loss as may be specifically required by the Supplementary Conditions. 3. include expenses incurred in the repair or replacement of any insured property (including but not limited to the fees and charges of engineers and architects); 4. cover materials and equipment in transit for incorporation in the Work or stored at the site or at another location prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by Engineer; and 5. be endorsed to allow occupancy and partial utilization of the Work by Owner. Section 00810—6`h Edition Supplementary Conditions to the General Conditions Page 6 of 12 6. include testing and start-up; and 7. be maintained in effect until final payment is made unless otherwise agreed to in writing by Owner, Contractor, and Engineer with thirty days written notice to each other additional insured to whom a certificate of insurance has been issued. B. Contractor shall be responsible for any deductible or self-insured retention. C. The policies of insurance required to be purchased and maintained by Contractor in accordance with this Paragraph SC5.06 shall comply with the requirements of Paragraph 5.06.0 of the General Conditions. D. The policies of insurance required to be purchased and maintained by Contractor in accordance with this Article 5.06.A shall comply with the requirements of GC - 5.06.C. The qualifications of the insurance company shall comply with the requirements of SC-5.02.A. SC-6.02 Working Hours Add the following to Paragraph 6.02.B: Regular working hours are defined as 8:00 AM. to 5:00 P.M. Emergency work may be done without prior permission. SC-6.04 PROGRESS SCHEDULE Delete Paragraph 6.04.A.1 of the General Conditions in its entirety and replace with the following: 1. Contractor shall submit to Engineer with each application for payment an updated progress schedule reflecting the amount of work completed and adjustments to fixture work. Such adjustments will be acceptable to Engineer as providing an orderly progression of the Work to completion within any specified milestones and the Contract Time. No progress payment will be made to Contractor until the updated schedules are submitted to and acceptable to Engineer and Owner. Review and acceptance of progress schedules by the Engineer will neither impose on Engineer responsibility for the sequencing, scheduling or progress of the Work, nor interfere with or relieve Contractor from Contractor's full responsibility therefore. Section 00810—6''Edition Supplementary Conditions to the General Conditions Page 7 of 12 SC- 6.13 SAFETY AND PROTECTION Change Supplementary Conditions in paragraph 6.13.0 to Special Provisions. Add new paragraphs to the end of paragraph 6.13.17 of the General Conditions as follows: G. It is expressly understood by the parties to this Agreement that the Contractor is solely responsible for initiating, maintaining, and supervising safety precautions and programs in connection with the Work. The right of the Owner and Engineer to observe or otherwise review the Work and operations shall not relieve the Contractor from any of his covenants and obligations hereunder. Contractor shall incorporate all safety requirements into his construction progress and work schedules including preconstruction and scheduled monthly safety meetings, posted safety rules, tailgate meetings, and site inspections by safety and other inspectors employed by the Contractor. H. The Contractor shall be responsible for and shall take necessary precautions and provide all material and equipment to protect, shore, brace, support and maintain all underground pipes, conduits, drains, sewers, water mains, gas mains, cables, etc., and other underground construction uncovered in the proximity, or otherwise affected by the constriction work performed by him. All pavement, surfacing, driveways, curbs, walks, buildings, grass areas, trees, utility poles or guy wires damaged by the Contractor's operations in the performance of this work shall be repaired and/or replaced to the satisfaction of the Owner, Engineer, and effected property owner at the Contractor's expense. The Contractor shall also be responsible for all damage to streets, roads, highways, shoulders, ditches, embankments, culverts, bridges, or other public or private property or facility, regardless of location or character, which may be caused by moving, hauling, or otherwise transporting equipment, materials, or men to and from the work or any her by him or his subcontractors. The Contractor shall part of site thereof; whet make satisfactory and acceptable arrangements with owner of, or the agency or authority having jurisdiction over, the damaged property or facility concerning its repair or replacement or payment of costs incurred in connection with said damage. I. The Contractor shall conduct his work so as to interfere as little as possible with public travel, whether vehicular or pedestrian. Whenever it is necessary to cross, obstruct, or close roads, driveways, and walks, whether public or private, the Contractor shall obtain approval from the governing party and shall, at his own expense, provide and maintain suitable and safe bridges, detours, and other temporary expedients for the accommodation of public and private drives before interfering with them. The provisions for temporary expedients will not be required when the Contractor has obtained permission from the owner and tenant of the private property, or from the authority having jurisdiction over public property involved, to obstruct traffic at the designated point. Section 00810—6`h Edition Supplementary Conditions to the General Conditions Page 8 of 12 I Safety provisions must be entirely adequate and meet with City or State and Federal regulations to protect the public on these streets and roads. SC- 6.20 INDEMNIFICATION Add a new paragraph immediately after paragraph 6.20.A. of the General Conditions which is to read as follows: While Owner and Engineer may have the right under this Contract to observe or otherwise review the work, progress and operations of the Contractor, it is expressly understood and agreed that such observation shall not relieve the Contractor from any of its covenants and obligations hereunder. SC-9.03 PROJECT REPRESENTATIVE Refer to the Special Provisions for identification of the responsibilities and authority and limitations of the Engineer's Resident Project Representative (if any). SC- 11.01 COST OF THE WORK Delete paragraph 11.01 .A.5.c of the General Conditions in its entirety and insert the following in its place: 11.01.A.5.c The rental of all construction equipment and machinery and parts thereof whether rented from Contractor or rented from others. The cost shall be calculated as follows and will include the costs of transportation, loading, unloading, assembly, dismantling and removal thereof for equipment involved only in the changed portion of the work covered under the cost of the Work method. Transportation, loading and assembly costs will not be included for equipment already on the site which is being used for other portions of the Work. The cost of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. Hourly equipment and machinery rates shall be calculated from the Rental Rate Blue Book for Construction Equipment, and the Equipment List submitted according to SC 2.05 and SC 2.07, and as follows: 1. For working equipment, the hourly rate shall be the monthly rental rate divided by 176 hours per month plus the hourly operating cost. 2. For equipment on standby, the hourly rate shall be 50% of the monthly rental rate divided by 176 hours per month, and the hourly operating cost shall not be applied. 3. For specialized equipment rented for a short duration used for change order work or additional work not part of the scope of work bid, the Section 00810—6`h Edition Supplementary Conditions to the General Conditions Page 9 of 12 equipment rental rates will be negotiated prior to the work being performed. SC-11.03 UNIT PRICE WORK Delete paragraph 11.03.D.1 and 2 of the General Conditions in its entirety and insert the following in its place: 1. the quantity of a particular item of Unit Price Work performed by Contractor differs by more than 25% from the estimated quantity of such item indicated in the Agreement, and 2. the total cost of the particular individual item of Unit Price Work amounts to 10% or more of the Contract Price which is the total sum of all schedules (if any), and SC- 14.02.A APPLICATIONS FOR PAYMENTS Add the following language at the end of paragraph 14.02.A.1 of the General Conditions: Payments for materials in storage shall be based only upon the actual cost of the materials and equipment to Contractor and shall not include any overhead or profit. Bill of Sale, invoice or other document warranting clear title for materials in storage will be waived for the material in storage included in the first progress payment application. However, proof of payment and clear title must be submitted with Application No. 2 for all material included in Application No. 1. Without such documentation amounts paid for materials in storage will be deducted from subsequent payments. Beginning with the second application, all requests for payment for materials in storage shall be accompanied by Bill of Sale, invoice or other document warranting clear title as required above. Add the following to Paragraph 14.02.A.3: In accordance with state law the Owner may accept deposited securities in lieu of cash retainage. Retainage may be used by the Owner to offset costs for any of the losses enumerated in Paragraphs 14.02.B.5.a through 14.02.B.5.d inclusive, 14.02.D.La. through 14.02.D.1.d inclusive, or 15.02.C. In addition retainage may be used by the Owner to protect against loss from failure by the Contractor to complete necessary work and to offset any liquidated damages due Owner. Add a new paragraph after paragraph to 14.02.A.3 to read: 4. Each application for progress payment shall be accompanied by Contractor's updated progress schedule, shop drawing schedule, procurement schedule, and other data specified herein or reasonably required by Owner or Engineer. The Owner reserves the right to require submission of monthly certified payrolls by the Contractor. Section 00810—6`h Edition Supplementary Conditions to the General Conditions Page 10 of 12 SC—14.02.0 PAYMENT BECOMES DUE Delete Paragraph 14.02.C.1 of the General Conditions in its entirety and insert the following in its place: 1. The Owner will, upon presentation to him of the Contractor's Application for Payment with Engineer's recommendation, review and act upon said payment request once each month on or about the day of each month stipulated by the Owner at the preconstruction conference. Payment will become due when Owner approves the application for payment and when due, will be paid by Owner to Contractor. SC- 14.02.D.1.c Amend the sentence of Paragraph 14.02.D.1.c to read: entitling Owner to a set-off against the amount recommended, including liquidated damages;or... SC-14.03 CONTRACTORS WARRANTY OF TITLE Add the following at the end of Paragraph 14.03.A of the General Conditions: Neither recommendation of any progress payment by Engineer nor payment by the Owner to Contractor, nor any use or occupancy of the Work or any part thereof will release the Contractor from complying with the Contract Documents. Specifically the Contractor shall maintain in accordance with Article 5, property insurance on all Work, materials, and equipment whether incorporated in the project or not and whether included in an application for payment or not, for the hull insurable value thereof. Passing title to Owner for materials and equipment included in an application for payment does not relieve the Contractor of the Contractor's obligation to provide insurance (including property insurance) as required in Article 5 of the General Conditions and these Supplementary Conditions. All insurance shall remain in effect as provided in Article 5. SC- 14.05 PARTIAL UTILIZATION Add the following to Paragraph 14.05.A: Owner has the right to take possession of or use any completed or substantially completed portions of the work at any time,but such taking possession or use will not be deemed an acceptance of any work not completed in accordance with the Contract Documents. Owner's use of any facilities so identified in the Contract Documents will not be grounds for extension of the contract time or change in the contract price. Owner's use of any facilities not specifically identified in the Contract Documents will be in Section OOS 10—6`h Edition Supplementary Conditions to the General Conditions Page 11 of 12 accordance with conditions agreed to prior to such use, and any extra costs or delays in completion incurred and properly claimed by Contractor will be equitably adjusted with a Change Order. Facilities substantially completed in accordance with the Contract Documents which are occupied or used by Owner prior to substantial completion of the entire work will be done in accordance with General Conditions 14.04. Guarantee periods for accepted or substantially completed work including mechanical and electrical equipment will commence upon the start of continuous use by Owner. All tests and instruction of Owner's personnel must be satisfactorily completed, and Owner shall assume responsibility for and operation of all facilities occupied or used except as may arise through portions of work not yet completed by Contractor If the work has been substantially completed and the Engineer certifies that full completion thereof is materially delayed through no fault of the Contractor, the Owner shall, without terminating the Agreement, make payment of the balance due for the portion of the work fully completed and accepted. SC- 14.06 FINAL INSPECTION Add the following to Paragraph 14.06.A: After Contractor has remedied all deficiencies to the satisfaction of the Engineer and delivered all construction records, maintenance and operating instructions, schedules, guarantees, bonds, certificates of inspection, and other documents (all as required by the Contract Documents), Owner and Contractor shall be promptly notified in writing by Engineer that the work is acceptable. SC- 17.01 GIVING NOTICE Add the following to Paragraph 17.0l.A: The mailing address for giving notices to Contractor given in the Agreement is hereby designated as the place to which all notices, letters, and other communication to Contractor will be mailed or delivered. The mailing address for giving notices to Owner given in the Agreement is hereby designated as the place to which all notices,letters, and other communication to Owner shall be mailed or delivered. Either party may change his address at any time by an instrument in writing delivered to Engineer and to other party. END OF SECTION 00810 Section 00810—6 h Edition Supplementary Conditions to the General Conditions Page 12 of 12 MONTANA PREVAILING WAGE RATES FOR HIGHWAY CONSTRUCTION SERVICES 2016 Effective: January 2, 2016 Steve Bullock, Governor State of Montana Pam Bucy, Commissioner Department of Labor and Industry To obtain copies of prevailing wage rate schedules, or for information relating to public works projects and payment of prevailing wage rates, visit ERD at www.mtwagehourbopa.com or contact: Employment Relations Division Montana Department of Labor and Industry P. O. Box 201503 Helena, MT 59620-1503 Phone 406-444-5600 TDD 406-444-5549 The Labor Standards Bureau welcomes questions, comments and suggestions from the public. In addition, we'll do our best to provide information in an accessible format, upon request, in compliance with the Americans with Disabilities Act. MONTANA PREVAILING WAGE REQUIREMENTS The Commissioner of the Department of Labor and Industry, in accordance with Sections 18-2-401 and 18-2-402 of the Montana Code Annotated (MCA), has determined the standard prevailing rate of wages for the occupations listed in this publication. The wages specified herein control the prevailing rate of wages for the purposes of Section 18-2-401, et seq., MCA. It is required that each employer pay(as a minimum) the rate of wages, including fringe benefits, travel allowance, zone pay and per diem applicable to the district in which the work is being performed as provided in the attached wage determinations. All Montana Prevailing Wage Rates are available on the internet at www.mtwagehourbopa.com or by contacting the Labor Standards Bureau at(406)444-5600 or TDD (406)444-5549. In addition, this publication provides general information concerning compliance with Montana's Prevailing Wage Law and the payment of prevailing wages. For detailed compliance information relating to public works contracts and payment of prevailing wage rates, please consult the regulations on the internet at www.mtwagehourbopa.com or contact the Labor Standards Bureau at (406) 444-5600 or TDD (406)444-5549. PAM BUCY Commissioner Department of Labor and Industry State of Montana TABLE OF CONTENTS MONTANA PREVAILING WAGE REQUIREMENTS: A. Date of Publication ............................................................................................................................... 3 B. Definition of Highway Construction ............................................................................................................. 3 C. Definition of Public Works Contract .......................................................................................................... 3 D. Prevailing Wage Schedule ..................................................................................................................... 3 E. Rates to Use for Projects ........................................................................................................................ 3 F. Wage Rate Adjustments for Multiyear Contracts .......................................................................................... 3 G. Fringe Benefits ..................................................................................................................................... 4 H. Dispatch City ........................................................................................................................................ 4 I. Zone Pay ............................................................................................................................................ 4 J. Computing Travel Benefits ..................................................................................................................... 4 K. Per Diem ............................................................................................................................................ 4 L. Apprentices ......................................................................................................................................... 4 M. Posting Notice of Prevailing Wages .......................................................................................................... 5 N. Employment Preference ......................................................................................................................... 5 0. Welder Rates .................................................................................................................................... 5 P. Foreman Rates .................................................................................................................................. 5 WAGE RATES: BRICK, BLOCK,AND STONE MASONS ........................................................................................................... 6 CARPENTERS ............................................................................................................................................ 6 CEMENT MASONS AND CONCRETE FINISHERS ............................................................................................ 6 CONSTRUCTION EQUIPMENT OPERATORS OPERATORS GROUP 1 ............................................................................................................................. 6 OPERATORS GROUP 2 ............................................................................................................................ 7 OPERATORSGROUP 3 ............................................................................................................................ 7 OPERATORS GROUP 4 ............................................................................................................................ 7 OPERATORS GROUP 5 ............................................................................................................................ 8 OPERATORSGROUP 6 ............................................................................................................................ 8 OPERATORS GROUP 7 8 CONSTRUCTION LABORERS LABORERSGROUP 1 ......................................................................................................................... 8 LABORERSGROUP 2 ............................................................................................................................ 9 LABORERS GROUP 3 ............................................................................................................................ 9 LABORERSGROUP 4 ............................................................................................................................ 9 DIVER ...................................................................................................................................................... 10 DIVERTENDER ......................................................................................................................................... 10 ELECTRICIANS .......................................................................................................................................... 10 IRONWORKERS-STRUCTURAL STEEL AND REBAR PLACERS ...................................................................... 10 LINE CONSTRUCTION EQUIPMENTOPERATOR .......................................................................................................................... 11 GROUNDMAN ......................................................................................................................................... 11 LINEMAN ................................................................................................................................................. 11 MILLWRIGHTS ............................................................................................................................................ 11 PAINTERS ................................................................................................................................................ 11 PILEBUCKS ............................................................................................................................................... 11 TEAMSTERS GROUP 1(Pilot Car Drivers) .......................................................................................................... 12 TEAMSTERS GROUP 2 (Truck Drivers) 12 2 A. Date of Publication January 2,2016 B. Definition of Highway Construction The Administrative Rules of Montana(ARM), 24.17.501(3)—(3)(a),states "Highway construction projects include, but are not limited to, the construction, alteration, or repair of'roads, streets, highways, runways, taxiways, alleys, trails, paths, and parking areas, bridges constructed or repaired in conjunction with highway work, and other similar projects not incidental to building construction or heavy construction. Highway construction projects include, but are not limited to, alleys, base courses, bituminous treatments, bridle paths, concrete pavement, curbs, excavation and embankment(for road construction),fencing(Highway),grade crossing elimination (overpasses or underpasses), guard rails on highways, highway signs, highway bridges (overpasses, underpasses, grade separation), medians,parking lots,parkways, resurfacing streets and highways, roadbeds, roadways, runways, shoulders, stabilizing courses, storm sewers incidental to road construction, streetpaving, surface courses, taxiways, and trails. " C. Definition of Public Works Contract Section 18-2-401(1 1)(a), MCA defines"public works contract" as "...a contract for construction services let by the state, county, municipality, school district, or political subdivision or for nonconstruction services let by the state, count}; municipality, or political subdivision in ivhich the total cost of the contract is in excess of$25,000...". D. Prevailing Wage Schedule This publication covers only Highway Construction occupations and rates in the specific localities mentioned herein. These rates will remain in effect until superseded by a more current publication. Current prevailing wage rate schedules for Building Construction, Heavy Construction and Nonconstruction Services occupations can be found on the internet at www.mtwagehourbopa.eom or by contacting the Labor Standards Bureau at(406)444-5600 or TDD(406)444-5549. F.Rates to Use for Projects ARM,24.17.127(1)(c),states "The wage rates applicable to a particular public works project are those in effect at the time the bid specifications are advertised. " F.Wage Rate Adjustments for Multiyear Contracts Section 18-2-417,MCA states: "(1)Any public works contract that by the terms of the original contract culls for more than 30 months to fidly perform must include a provision to adjust, as provided in subsection (2), the standard prevailing rate of wages to be paid to the workers performing the contract. (2) The standard prevailing rate of wages paid to workers under a contract subject to this section must be adjusted 12 months after the date of the award of the public works contract. The amount of the adjustment must be a 3%increase. The adjustment must be made and applied every 12 months for the term of the conk act. (3)Any increase in the standard rate of prevailing wages for workers under this section is the sole responsibility of the contractor and any subcontractors and not the contracting agency." 3 G. Fringe Benefits Section 18-2-412, MCA states: "(1) To fulfill the obligation...a contractor or subcontractor may: (a)pay the amount of fringe benefits and the basic hourly rate of pay that is part of the standard prevailing rate of ivages directly to the worker or employee in cash; (b) make an irrevocable contribution to a trustee or a third person pursuant to a fringe benefit firnd,plan, or•program that meets the requirements of the Employee Retirement Income Security Act of 1974 or that is a bona fide program approved by the U. S. department of*labor; or (c) make payments using any combination of methods set_forth in subsections (1)(a)and(1)(b)so that the aggregate of payments and contributions is not less than the standard prevailing rate of wages, includingf•inge benefits and travel allowances, applicable to the district for the particular type of work being perfornned. (2) The fringe benefit firnd,plan, or•program described in subsection(1)(b)must provide benefits to workers or employees for health care,pensions on retirement or death, life insurance, disability and sickness insurance, or bona fide programs that meet the requirements of the Employee Retirement Income Security Act of 1974 or that are approved by the U. S. department of labor. " Fringe benefits are paid for all hours worked (straight time and overtime hours). However, fringe benefits are not to be considered a part of the hourly rate of pay for calculating overtime, unless there is a collectively bargained agreement in effect that specifies otherwise. H. Dispatch City ARM,24.17.103(11),defines dispatch city as "...the courthouse in the city from the following list which is closest to the center of the job:Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, and Missoula." I. Zone Pay Zone pay is not travel pay. ARM,24.17.103(24),defines zone pay as"...an amount added to the base pay;the combined sum then becomes the new base wage rate to be paid for all hours worked on the project.Zone pay must be determined by measuring the road miles one way over the shortest practical maintained route fiom the dispatch city to the center of the job." See section H above for a list of dispatch cities. J. Computing Travel Benefits ARM,24.17.103(22),states"'Travel pay, 'also referred to as 'travel allowance,'is and must be paid for travel both to and fr-oin the job site, except those with special provisions listed under the classification. The rate is determined by measuring the road miles one direction over the shortest practical maintained route from the dispatch cii)�or the employee's home, whichever is closer, to the center of the job. " See section H above for a list of dispatch cities. K. Per Diem ARM,24.17.103(18),states "'Per diem'typically covers costs associated with board and lodging expenses. Per diem is paid when an employee is required to work at a location outside the daily commuting distance and is required to stay at that location overnight or longer." L. Apprentices Wage rates for apprentices registered in approved federal or state apprenticeship programs are contained in those programs. Additionally, Section 18-2-416(2), MCA states "...The fadl amount of any applicable fringe benefits must be paid to the apprentice while the apprentice is working on the public works contract." Apprentices not registered in approved federal or state apprenticeship programs will be paid the appropriate journey level prevailing wage rate when working on a public works contract. 4 M.Posting Notice of Prevailing Wages Section 18-2-406, MCA, provides that contractors,subcontractors,and employers who are "...performing work or providing construction services under public works contracts, as provided in this part, shall post in a prominent and accessible site on the project or staging area, not later than the first day of work and continuing for the entire duration of the project, a legible statement of all wages and fringe benefits to be paid to the employees." N. Employment Preference Sections 18-2-403 and 18-2-409, MCA require contractors to give preference to the employment of bona fide Montana residents in the performance of work on public works contracts. O. Welder Rates Welders receive the rate prescribed for the craft performing an operation to which welding is incidental. P. Foreman Rates Rates are no longer set for foremen. However, if a foreman performs journey level work, the foreman must be paid at least the journey level rate. 5 | | / | ! � ! � �� ���� ��=�~�=. wp=� m =~�� \ BRICK, BLOCK, AND STONEMASONS VVo0o Benefit Travel: | $26.01 $12.88 O-45 mi. free zone ' | >45'60mi $25.00/day >GO'0O mi. $55.U0/doy | >0O mi. $G5.UO/day ' CARPENTERS | Wage Benefit Zone Pay: $28.00 $11.86 0-30 mi hno zone | >30-60mi base pay+ $4.O8/hr. | >80mi base pay+ $6.00/ r. | CEMENT MASONS AND CONCRETE FINISHERS | VVu0o Benefit Zone Pay: � $23.87 $0.80 0'25 mi. free zone >25-50 mi base pay+ $2.50/hr. Duties Include: >5O mi. base pay+ $3,00/hr. . | Smooth and finish surfaces of poured oonorete, such as floom, wm|ko, sidewalks, or curbs. Align forms for sidewalks, curbs, orgutters. | ' CONSTRUCTION EQUIPMENT OPERATORS GROUP 1 ' VVu0e Benefit Zone Pay: $24.02 $9.00 0-30 mi. free zone ~30-68 mi. base pay+ $2.50/hr. � This group includes but ie not limited to: >GO mi. base pay+$4.0O/hr. Air Compressor; Auto Fine Grader; Belt Finishing; Boring Machine (SnoaU); Cement Silo; Crane, A'FnymeTruck ) Crane; Crusher Conveyor; DVV'iO. 15. and 2UTractor Roller; Farm. . . . Loader, under cu. yd; Oiler, Heavy Duty Drills; Herman Nelson Heater; Mucking Machine; Oiler,All Except � Pumpman Cnaneo/Ghovo|o�. | � . | 6 / [ i I 1 CONSTRUCTION EQUIPMENT OPERATORS GROUP 2 Wage Benefit Zone Pay: $26.05 $9.90 0-30 mi. free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi. base pay+ $4.00/hr. Air Doctor; B ackhoe\Excavator\S hovel, up to and incl. 3 cu. yds; Bit Grinder; Bitunimous Paving Travel Plant; Boring Machine, Large; Broom, Self-Propelled; Concrete Travel Batcher; Concrete Float& Spreader; Concrete Bucket Dispatcher; Concrete Finish Machine; Concrete Conveyor; Distributor; Dozer, Rubber-Tired, Push, & Side Boom; Elevating Grader\Gradall; Field Equipment Serviceman; Front-End Loader, 1 cu. yd up to and incl. 5 cu. yds; Grade Setter; Heavy Duty Drills, All Types; Hoist\Tugger, All; Hydralift Forklifts & Similar; Industrial Locomotive; Motor Patrol (except finish); Mountain Skidder; Oiler, Cranes\Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled; Pugmill; Pumperete\Grout Machine; Punch Truck; Roller, other than Asphalt; Roller, Sheepsfoot(Self-Propelled); Roller, 25 tons and over; Ross Carrier; Rotomill, under 6 ft; Trenching Machine; Washing/Screening Plant CONSTRUCTION EQUIPMENT OPERATORS GROUP 3 Wage Benefit Zone Pay: $26.91 $9.90 0-30 mi. free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi, base pay+$4.00/hr. Asphalt Paving Machine; Asphalt Screed; Back hoe\Excavator\S hovel, over 3 cu. yds; Cableway Highline; Concrete Batch Plant; Concrete Curing Machine; Concrete Pump; Cranes, Creter; Cranes, Electric Overhead; Cranes, 24 tons and under; Curb Machine\Slip Form Paver; Finish Dozer; Front-End Loader, over 5 cu. yds; Mechanic\Welder; Pioneer Dozer; Roller Asphalt (Breakdown & Finish); Rotomill, over 6 ft; Scraper, Single, Twin, or Pulling Belly-Dump; YO-YO Cat. CONSTRUCTION EQUIPMENT OPERATORS GROUP 4 Wage Benefit Zone Pay: $27.60 $9.90 0-30 mi. free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi. base pay+$4.00/hr. Asphalt\Hot Plant Operator; Cranes, 25 tons up to and incl. 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper. 7 CONSTRUCTION EQUIPMENT OPERATORS GROUP 5 Wage Benefit Zone Pay: $28.94 $9.90 0-30 mi. free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi. base pay+ $4.00/hr. Cranes, 45 tons up to and incl. 74 tons. CONSTRUCTION EQUIPMENT OPERATORS GROUP 6 Wage Benefit Zone Pay: $29.63 $9.90 0-30 mi. free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi. base pay+ $4.00/hr. Cranes, 75 tons up to and incl. 149 tons; Cranes, Whirley(All). CONSTRUCTION EQUIPMENT OPERATORS GROUP 7 Wage Benefit Zone Pay: $31.73 $9.90 0-30 mi. free zone >30-60 mi. base pay+$2.50/hr. This group includes but is not limited to: >60 mi. base pay+$4.00/hr. Cranes, 150 tons up to and incl. 250 tons; Cranes, over 250 tons—add $1.00 for every 100 tons over 250 tons; Crane, Tower(All); Crane Stiff-Leg or Derrick; Helicopter Hoist. CONSTRUCTION LABORERS GROUP 1/FLAG PERSON FOR TRAFFIC CONTROL Wage Benefit Zone Pay: $19.15 $8.60 0-25 mi. free zone >25-50 mi. base pay+$2.50/hr. >50 mi. base pay+$3.00/hr. * Corrected 01/22/2016 8 CONSTRUCTION LABORERS GROUP 2 Wage Benefit Zone Pay: $21.97 $8.14 0-25 mi. free zone >25-50 mi. base pay+$2.50/hr. This group includes but is not limited to: >50 mi. base pay+ $3.00/hr. General Labor; Asbestos Removal; Burning Bar; Bucket Man; Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler(dry); Chuck Tender; Choker Setter; Concrete Worker; Curb Machine-lay Down; Crusher and Batch Worker; Heater Tender; Fence Erector; Landscape Laborer; Landscaper; Lawn Sprinkler Installer; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sign Erection; Guardrail and Jersey Rail; Spike Driver; Stake Jumper; Signalman; Tail Hoseman; Tool Checker and Houseman and Traffic Control Worker. CONSTRUCTION LABORERS GROUP 3 Wage Benefit Zone Pay: $22.46 $8.05 0-25 mi. free zone >25-50 mi. base pay+ $2.50/hr. This group includes but is not limited to: >50 mi. base pay+ $3.00/hr. Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and Liners; High-Pressure Nozzleman; Jackhammer(Pavement Breaker) Non- Riding Rollers; Pipelayer; Posthole Digger(Power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod Cutter-Power and Tamper. CONSTRUCTION LABORERS GROUP 4 Wage Benefit Zone Pay: $23.18 $8.05 0-25 mi. free zone >25-50 mi. base pay+ $2.50/hr. This group includes but is not limited to: >50 mi. base pay+ $3.00/hr. Hod Carrier***;Water Well Laborer; Blaster; Wagon Driller; Asphalt Raker; Cutting Torch; Grade Setter; ***Hod Carriers will receive the same amount of travel High-Scaler; Power Saws (Faller& Concrete) and/or subsistence pay as bricklayers when requested to Powderman; Rock & Core Drill; Track or Truck Mounted travel. Wagon Drill and Welder incl. Air Arc. *Corrected 01/22/2016 9 DIVER Wage Benefit Zone Pay: Stand-By $36.72 $14.00 0-30 mi. free zone Diving $73.44 $14.00 >30-50 mi, base pay+ $4.00/hr. >50 mi. base pay+$6.00/hr. Depth Pay(Surface Diving) 0-20 ft. free zone >20-100 ft. $2.00 per ft. >100-150 ft. $3.00 per ft. >150-220 ft. $4.00 per ft. >220 ft. $5.00 per ft. Diving In Enclosures 0-25 ft, free zone >25-300 ft. $1.00 per ft. DIVER TENDER Wage Benefit Zone Pay: $35.02 $14.00 0-30 mi. free zone >30-50 mi. base pay+ $4.00/hr. The tender shall receive 2 hours at the straight time pay >50 mi. base pay+$6.00/hr. rate per shift for dressing and/or undressing a Diver when work is done under hyperbaric conditions. ELECTRICIANS Wage Benefit Travel: $31.39 $12.76 0-18 mi. free zone >18-60 mi. federal mileage rate/mi. in effect when travel occurs and employee uses own vehicle. > 60 mi. $75.00/day. IRONWORKERS - STRUCTURAL STEEL AND REBAR PLACERS Wage Benefit Travel: $26.50 $19.98 0-45 mi. free zone >45-85 mi. $45.00/day Duties Include: >85 mi. $75.00/day Structural steel erection; assemble prefabricated metal buildings; cut, bend, tie, and place rebar; energy producing windmill type towers; metal bleacher seating; handrail fabrication and ornamental steel. 10 LINE CONSTRUCTION— EQUIPMENT OPERATORS Wage Benefit Zone Pay: $31.82 $13.11 0-25 mi. $40.00/day >25 mi. $60.00/day LINE CONSTRUCTION —GROUNDMAN Wage Benefit Zone Pay: $24.85 $12.38 0-25 mi. $40.00/day >25 mi. $60.00/day LINE CONSTRUCTION — LINEMAN Wage Benefit Zone Pay: $41.45 $14.20 0-25 mi. $40.00/day >25 mi. $60.00/day MILLWRIGHTS Wage Benefit Zone Pay: $31.00 $11.86 0-30 mi.free zone >30-50 mi. base pay+ $4.00/hr. >50 mi. base pay+$6.00/hr. PAINTERS Wage Benefit $27.00 $9.30 PILE BUCKS Wage Benefit Zone Pay: $28.00 $11.86 0-30 mi. free zone >30-50 mi. base pay+ $4.00/hr. Duties Include: >50 mi, base pay +$6.00/hr. Set up crane; set up hammer; weld tips on piles; set leads; insure piles are driven straight with the use of level or plum bob. Give direction to crane operator as to speed, and direction of swing. Cut piles to grade. 11 TEAMSTERS GROUP 1 (Pilot Car Drivers) Wage Benefit Zone Pay: $20.59 $9.16 0-25 mi. free zone >25-50 mi. base pay+$2.50/hr. >50 mi. base pay+$4.00/hr. TEAMSTERS GROUP 2 (Truck Drivers) Wage Benefit Zone Pay: $27.69 $9.16 0-30 mi, free zone >30-60 mi. base pay+ $2.50/hr. This group includes but is not limited to: >60 mi. base pay+ $4.00/hr. Combination Truck and Concrete Mixer and Transit Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump Trucks and similar equipment; Dumpster; Flat Trucks; Lumber Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom; Serviceman; Service Truck/Fuel Truck/Tireperson; Truck Mechanic; Trucks with Power Equipment;Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks. 12 SPECIAL PROVISIONS 1. GENERAL The work to be performed under this contract involves furnishing all labor, materials, equipment, supplies and services necessary for the replacement of concrete sidewalks and curb and gutter,and installation of new concrete sidewalks along vacant lots in various locations within the City of Bozeman. All work shall be performed in accordance with applicable sections of the Montana Public Works Standard Specifications Sixth Edition (MPWSS), and as further modified by the City of Bozeman Modifications to MPWSS, which is hereby included as part of these specifications. All references to MP WS S sections,unless otherwise noted,is a reference to said Montana Public Works Standard Specifications. All correspondence and official authorization concerning the work shall be with the City Engineer or his designated representatives as identified at the preconstruction meeting. Any changes in the Work or schedule not authorized by the above shall be deemed as unauthorized and shall be done at Contractors risk at no cost to the Owner. All damages,reparations, and costs thus incurred during the progress of such unauthorized work shall be borne exclusively by the Contractor. 2. SCOPE OF WORK The proposed work consists of replacement of concrete sidewalks and curb and gutter, and installation of new concrete sidewalks at the proposed work locations identified in Appendix B. 3. AWARD OF CONTRACT The award of the contract, if awarded, will be made within the period specified in the Invitation to Bid to the lowest responsive, responsible Bidder whose Bid complies with all the requirements prescribed herein. The successful Bidder will be notified by letter,mailed to the address shown on the Bid,that his Bid has been accepted and that he has been awarded a contract. Bidders must bid all schedules, only one contract will be awarded. 4. TIME OF COMMENCEMENT AND COMPLETION DATE The beginning of the Contract Time shall be stated in a written NOTICE TO PROCEED written by the City Engineer to the Contractor. In establishing the date when Contract Time begins,the Engineer will consider that the contract time begins following delivery of the NOTICE TO PROCEED. A separate notice to proceed may be issued for each separate or combined bid schedule. Where multiple schedules are awarded under a single contract, the contract times shall run concurrently,unless the City agrees to issue separate notices to proceed. The Contract Time will expire automatically the number of calendar days stated as Contract Time, except as the Contract Time may be extended by change order. 1 SPECIAL PROVISIONS 5. LIQUIDATED DAMAGES Subject to the provisions of the Contract Documents,the Owner shall be entitled to liquidated damages for failure of the Bidder to complete the work within the specified contract time. The Bidder agrees to pay liquidated damages for compensation to the Owner for expenses incurred by the Owner during the contract time overrun. As compensation for expenses incurred,the Contractor shall be assessed a liquidated damage of$100.00 per calendar day for each day that the work remains uncompleted beyond the contract period. Liquidated damages shall be paid by deduction from monthly progress payments and the final payment. 6. COST LIMITATIONS The Owner reserves the right to eliminate or reduce certainproposal items from the project following the Bid Opening to make the project financially feasible with the limitations of the funds allocated for this project. The determination of which items shall be eliminated shall be the responsibility of the Owner. 7. NAMES, PRODUCTS AND SUBSTITUTIONS Where products or materials are specified by manufacturer,trade name,or brand,such designations are intended to indicate the required quality, type, utility, and finish. Requests for proposed substitution shall include complete specifications and descriptive data to prove the equality ofproposed substitutions. Substitutions shall not be made without the written approval of the Owner. No substitutions will be considered until after contract award. 8. APPROVAL OF EQUIPMENT AND MATERIALS The Contractor shall furnish to the Owner or its Engineer for approval the name of the manufacturer of machinery,mechanical and other equipment and materials which he contemplates using in execution of the work,together with the performance capacities and such other information which may be pertinent or required by the Owner. 9. BIDDER'S QUALIFICATIONS The Contractor shall show evidence that he has the finances,organization,and equipment to perform the work with a limited number of subcontractors. The Contractor will be required to have a full-time resident General Superintendent on the job at all times while the work is in progress. He shall be in a position to direct the work, and make decisions either directly or through immediate contact with his superior. Absence or incompetence of the superintendent shall be reason for the Owner to stop all work on the project. 2 SPECIAL PROVISIONS 10. WARRANTY If,within one year after acceptance of the work by the Owner,any of the work is found to be defective or not in accordance with the Contract Documents,and upon written notice from the Owner,the Contractor shall correct any work beginning within seven (7) calendar days of said written notice. Should the Contractor fail to respond to the written notice within the designated time, the Owner may correct the work at the expense of the Contractor. 11. SCHEDULING Prior to or at the PRECONSTRUCTION CONFERENCE,the Contractor shall provide the City Engineer the following schedules: A. A practicable CONSTRUCTION PROGRESS SCHEDULE showing the order,timing,and progress in which the Contractor proposes to prosecute the work. This schedule shall be in Bar Graph, CPM or PERT format. The schedule shall be updated and re-submitted as necessary to reflect project changes. B. A PAYMENT SCHEDULE showing the anticipated amount of each monthly payment that will become due the Contractor in accordance with the Construction Progress Schedule. C. A TRAFFIC CONTROL PLAN detailing the methods and means of controlling traffic for the specific conditions involved with each construction schedule. The Contractor shall limit working hours to 7:00 a.m. to 7:00 p.m., Monday through Friday. No work shall be done outside of these hours unless specifically approved by the City Engineer. 12. PRECONSTRUCTION CONFERENCE After the contract(s)have been awarded,but before the start of construction,a conference will be held at the site of the project for the purpose of discussing requirements on such matters as project supervision, on-site inspections, progress schedules and reports, payrolls, payment to contractors, contract change orders, insurance, safety, and any other items pertinent to the project. The Contractor shall arrange to have all supervisory personnel and a representative from each of the affected utility companies connected with the project on hand to meet with a representative of the Owner to discuss the project and any problems anticipated. 13. SHOP AND FABRICATION DRAWINGS The Contractor shall prepare and submit fabrication drawings,design mix information,material testing compliance data, and other data, in accordance with the General Conditions. Following review, the Contractor shall resubmit copies of any drawings which required revision or correction. 3 SPECIAL PROVISIONS Any review by the Owner will not relieve the Contractor from responsibility for errors or omissions, inadequate design performance requirements, schedule requirements,and proper operation of any item required under the Contract. Notwithstanding any such review, Contractor shall remain solely responsible for full and complete performance in accordance with the terms, conditions, provisions, drawings and specifications set forth in the Contract Documents. 14. UNDERGROUND UTILITIES The Contractor shall be responsible for checking with the Owners of underground utilities such as the City,County,power and telephone companies,etc.as to the location of their underground installations in the project area. The Contractor shall be solely responsible for any damage done to these installations due to failure to locate them or to properly protect them when their location is known. It shall be solely the responsibility of the Contractor to fully coordinate his work with the agencies and to keep them informed of his construction activities so that these vital installations are fully protected at all times. A Montana One-call system, phone number 1-800-424-5555 has been set up to facilitate requests for underground facility located information. The Contractor is responsible for contacting the One-call system prior to any excavation. 15. EASEMENTS, RIGHTS-OF-WAY, ADJOINING PROPERTY The Contractor shall contain all of his construction operations within the easements and rights of way unless written approval is secured from the owner of the adjoining property or written approval is given by the Owner to utilize the adjacent land area. 16. TRAFFIC CONTROL A. General. The Contractor shall at all times conduct his operations so that there is a minimum interruption in the use of the City's streets affected by the work. Exact procedures in this respect shall be established in advance of construction with the City Engineer. Barricade function,design and construction shall conform to the latest edition of the Manual on Uniform Traffic Control Devices and the Standard Specifications for Road and Bridge Construction of the State Highway Commission of Montana latest Edition. Should construction of the project require the closure of any streets,roads or highways or require night- time or long-term traffic control, the Contractor will be required to prepare a detailed TRAFFIC CONTROL PLAN to address the methods and means of controlling traffic under the specific conditions. In regards to closures,the plan shall include specific details on traffic detours and estimated durations of the closures. Details of signing,barricades,flagging and other traffic control devices shall be presented. 4 SPECIAL PROVISIONS The traffic control plan shall be prepared by either an ATTSA (American Traffic Safety Services Association)certified Traffic Control Supervisor or Traffic Control Design Specialist or approved equal, or a Professional Engineer.The traffic control plan shall be approved by the Owner prior to construction. B. Traffic Access. Construction work shall be programmed by the Contractor so that local traffic will have continuous access within one block of any given property. It shall be the responsibility of the Contractor to notify all affected residents in the area of programmed work, of street closures, parking requirements and restrictions,use of driveways,and any other conditions,a minimum of twenty- four (24) hours prior to beginning work within the affected area. All signing, barricades, and other traffic control measures shall be provided by the Contractor. C. Warning Signals. All streets, roads, highways and other public thoroughfares which are closed to traffic shall be protected by means of effective barricades on which shall be placed,mounted or affixed acceptable warning signs. Barricades shall be located at the nearest intersecting public highway or street on each side of the blocked section. All open trenches and other excavations within the construction area shall be provided with suitable barriers, signs and lights to the extent that adequate public protection is provided. All abrupt grade changes greater than one inch which traffic is required to pass over;and obstructions, including but not limited to, material stockpiles and equipment shall be similarly protected. All barricades and obstructions shall be illuminated by means of warning lights at night. All lights used for this purpose shall be kept burning from sundown to sunrise. D. Measurement and Payment. No separate measurement and payment shall be made for construction traffic control unless listed as a bid item. Construction traffic control shall be considered an incidental cost to be included in other items in the contract requiring traffic control to complete that item. E. Reflective Traffic Vests. All workers working in public right-of-way shall at all times wear reflective vests that at a minimum meet ANSI Class II requirements. 17. DISPOSAL, EROSION, WATER POLLUTION, AND SILTATION CONTROL The Contractor is responsible for proper disposal of all waste soils and materials unless otherwise directed herein. Where waste materials are disposed on private property not owned by the Contractor, evidence of property owner's written permission shall be obtained and provided to the Owner. Contractor shall comply with all Local, State, and Federal laws and regulations pertaining to fill in wetlands and floodplains. The Contractor shall dispose of all refuse and discarded materials in an approved location. The Contractor shall exercise every reasonable precaution throughout the life of the project to prevent pollution or siltation of rivers,streams or impoundments. Pollutants such as chemicals,fuels,lubricants, 5 SPECIAL PROVISIONS bitumens, raw sewage, and other harmful wastes shall not be discharged into or alongside of rivers, streams,impoundments or into natural or manmade channels leading thereto. In addition,the Contractor shall conduct and schedule his operations to avoid muddying or silting of rivers, streams or impoundments. The Contractor shall meet the requirements of the applicable regulations of the Department of Fish, Wildlife and Parks, Department of Health and Environmental Sciences and other State or Federal regulations relating to the prevention or abatement of water pollution and siltation. The Contractor's specific attention is directed to the Montana Water Pollution Control Act and the Montana Stream Preservation Act. The Contractor shall be responsible for obtaining any required discharge permits associated with groundwater de-watering operations. Contractor's shall include all clean-up, restoration, etc., of any detention or discharge areas. All debris or waste materials shall be cleaned up by the end of the work day. Inlet Protection: all storm drain inlets shall be protected with filter fabric or approved equal method to prevent debris from entering the storm drain system. 18. PROTECTION OF EXISTING PAVEMENT All equipment shall be fitted with pads on the outriggers and other accessories as necessary to prevent damage to existing pavement during the course of the project. Any damages to pavement shall be corrected by the Contractor, at his expense, in a manner as directed by the Engineer. 19. SALVAGEABLE ITEMS Any items removed from the existing system under the terms of this contract shall remain the property of the Owner and shall be delivered to a site of the Owner's choosing within the property limits of said Owner. Should the Owner choose not to accept any salvageable items,then the Contractor shall dispose of those items at his expense at a site or landfill acceptable to the Engineer. Any costs for the above work shall be at the Contractor's expense. 20. FINAL CLEANUP AND SITE RESTORATION Following completion of the work, all construction debris shall be removed from the work area. All disturbed landscaped areas shall be restored with topsoil and re-seeded. The cost for final cleanup and restoration shall be included in other bid items; no separate payment shall be made for this work. 21. ACCESS TO RECORDS The Contractor shall allow access to any books, documents, papers and records which are directly pertinent to this Contract by the Owner, State or Federal agencies, or any of their duly authorized 6 SPECIAL PROVISIONS representatives for the purpose of making an audit, examination, excerpts or transcriptions. 22. INSURANCE Insurance coverages required under this contract shall extend, at a minimum, to the end of the contract time. 23. PROTECTION OF TREE ROOTS, SPRINKLER SYSTEMS, AND PROPERTY PINS The Contractor shall take special care when working around trees to avoid any unnecessary damage to the roots or the trunks of trees. If any roots have to be removed to complete the work,the roots shall be neatly cut with a sharp tool. Indiscriminate ripping of tree roots will not be permitted. The method and equipment to be used shall be submitted to the Engineer for approval prior to the start of work. In addition, the Contractor shall take special care when working around trees to avoid any unnecessary damage to the branches or the trunks of trees. Protective barriers shall be placed around trees as necessary to prevent inadvertent damage by equipment. The Contractor shall take care to locate any existing sprinkler heads or lines prior to excavation. Any sprinkler systems which are damaged shall be repaired by the Contractor. The Contractor shall be responsible for preserving existing property pins in the field. The cost of resetting property pins removed by the Contractor shall be the responsibility of the Contractor. 24. SUPPLEMENTAL TECHNICAL SPECIFICATIONS Section 02910 - Seeding 2.1 Seed Use the following seed mixture to seed all disturbed landscaped areas at a rate of 30 lbs/acre: Tall Water-save Fescue 60% Kentucky Bluegrass 25% Perennial Ryegrass 15% 7 SPECIAL PROVISIONS SECTION 00100 MEASUREMENT AND PAYMENT The quantities listed in the Bid Form are estimates for the purpose of bidding only. Payment to the Contractor will be made based on the actual satisfactorily completed work quantities measured in the field. Under the terms of this contract,the unit price as contained in this Bid Form shall be applicable to quantity overruns. The following measurement and payment sections do not necessarily name every incidental item required by the Contract Documents to complete the work. Cost of all such incidental items shall be included in the various related bid items. No separate measurement and payment shall be made for traffic control unless listed as a bid item in a bid schedule. Items 101, 203 and 303: 4" Concrete sidewalk in place Measurement and payment for this item shall be as per MPWSS,Section 02529 4.4,square foot method. Item 102, 202, and 302: 6" Concrete sidewalk, in place. Measurement and payment for this item shall be as per MPWSS,Section 02529 4.4,square foot method. Item 103: Special Costs This item shall be paid for at the lump sum price bid for special costs for each lot, which price and payment shall constitute full compensation for furnishing all tools,equipment,labor and incidentals for additional work not covered in Bid Items 101 and 102 that is necessary in order to complete the sidewalk on City right-of-way. Additional work may include but is not limited to: removal of excess cut material or placement of fill; removal of trees, shrubs, or other vegetation;and removal and disposal of existing concrete debris or other debris. Payment will be made at the special cost bid for all work that is completed for each lot as listed on the Bid Form. Item 201: Concrete removal and disposal. This item shall be measured and paid for by the square foot (SF) at the unit price bid for "Concrete removal and disposal", which price and payment shall constitute full compensation for furnishing all materials, tools, equipment, labor, loading, hauling, disposal, and incidentals necessary to sawcut and remove and dispose of existing PCC or asphaltic concrete pavement or sidewalks, straight curbing, or integral curb and gutter. 1 MEASUREMENT AND PAYMENT Item 204: Detectable warning This item is measured and paid for by the square foot at the contract unit price bid for "Detectable warning". Price and payment is full compensation for furnishing and installing detectable warning panels in accordance with manufacturer's recommendations. Item 301: Unclassified excavation above sub grade This item is measured by the square yard and paid for at the unit price bid for"Unclassified excavation above subgrade", said price and pavement being full compensation for all labor,tools,equipment,and other incidentals necessary for removing (including sawcutting) and disposing of any asphalt concrete pavement,PCC pavement,curbing,sidewalks,drive approaches,soil,or vegetation necessary to prepare the site for the installation of new curb and gutter, sidewalks,pedestrian ramps,drive approaches, and asphalt pavement,and to re-compact and/or prepare as necessary the base material for placement of new asphaltic or Portland cement concrete. Item 304: Combined concrete curb and gutter. This item is measured and paid for by the lineal feet of combined curb and gutter in place at the contract unit price bid for"Combined concrete curb and gutter". Price and payment is full compensation for all materials, preparation of gravel base, curing of concrete, painting face of gutter with tack oil, all pre- molded mastic material for expansion joints, steel dowels and sleeves, all equipment,tools, labor, and for the performance of all work and incidentals necessary to complete the item. Item 305: 3" thickness of asphalt concrete pavement surface course, grade B. This item shall be measured and paid for as per MPWSS Section 02510 4.4 A. 2, square foot basis. Item 306: Storm drain inlets. This item shall be measured and paid for as per MPWSS Section 02720 4.4 A,and includes all necessary work and materials required to connect inlet to existing storm drain pipe. Item 307: Construction Traffic Control This item shall be measured and paid for as per MPWSS Section 01570 Part 4, lump sum basis. 2 MEASUREMENT AND PAYMENT APPENDIX B Estimated Quantities, Plan Sheets v v U O O c m m O ro w u m M T c m Z3 U uj w u= v v c m r-i CD ri N Ln r- r� car r, O ri Ln O M �t O Ln iD lD c4 oo m oo O rn rl v rn rn N �n d rn m m rn m Lo d m T D N00 V i-+ w c m cn Q. t,z r, m CDri ri N M m m ..1 Y 00 00 00 Y a Y Y r-i U U U U O O U U U O U O O U N O O O m m O O O m O m m O 0 Co CO m m N m m m m m O m 7-0 c-i N co r-I ri ri N m c-i w ri ri 01 w O O O O O O O O O O O O O J J J J J J J J J J J J J J .Y (6 N v) 3 N z c O 0 _0 -0 O > > > N cc m m N Y Q1 (u UJ O a) N v1 vl N (6 (D (6 J U � Y � n n O O ca Y W W m N N M M W c c c a a a a a vi vi vi vi m v w w w O N "t oo W o m ct oa zt v 0 0 0 w oo m r- rn ro m in r\ O 0 ct CO M -Y P to in to to M M c* O O Q to Ln lD M m m M M M M m m M i i ANTICIPATED WORK LOCATIONS-SIDEWALK REPAIRS 4"Walk(SF) 6"Walk(SF) 511 Westridge 5 LF sunk 25 2413 Westridge 20 LF driveway spalled,15 LF pvt tree roots 75 100 2705 Westridge 10 LF sunk 50 2711 Westridge 5 LF pvt tree 25 2902 Westridge 10 LF pvt tree 50 2814 Westridge 10 LF pvt tree 50 2525 Landoe 10 LF sunk/tree roots 50 515 Henderson 13 LF pvt tree,10 LF driveway 65 50 2814 Secor 9 LF sunk 45 3009 Healy 10 LF pvt tree 50 3020 Healy 15 LF pvt tree/sunk 75 815 Arnold 15 LF sunk 75 735/725 Arnold 12 LF sunk on property line 60 1817 S.Willson 10 LF spalled 50 1215 S.Willson 50 LF spalled and cracked 250 1211 S.Willson 40 LF spalled 200 Story Mansion 172 LF 760 208 W.Grant 90 LF spalled 450 alley approach south side Hayes b/w Grand and 3rd 20 LF 100 221 W.Hayes 5 LF pvt tree 25 216 W.Hayes S LF sunk 25 1410 S.3rd city tree root-non-sawable 6 LF 30 1410 S.3rd 55 LF spalled (10 LF is 6") 225 50 1404 S.3rd 40 LF spalled 200 1431 S.4th 10 LF sunk 50 404 W.Grant city tree root 20 If 100 1317 S.3rd 5 LF spalled 25 1317 S.3rd city tree root 10 If 50 1301 S.3rd 10 LF spalled 50 1303 S.4th 20 LF 2 spots sunken and spalled 100 1221 S.4th 15 LF pvt tree 75 409/411 W.Hayes 25 LF spalled 125 522 W.Hayes 65 LF spalled and cracked 325 1314 S.6th city tree root non-sawable 10 LF 50 1320 and 1322 S.6th 65 LF pvt trees and spalled 325 Ped ramp NE Grant and 6th replace 115 1322 S.6th 45 LF(20 LF is 6") 125 100 510 W.Hayes Entire frontage spalled 355 1122 S.5th 105 LF 525 520 W.Garfield(Alpha Gamma House) 10 LF sunk 50 1104 S.Sth 6 LF pvt tree 30 410 W.Arthur 25 LF in driveway 125 1121 S.3rd 15 LF pvt tree 5 LF spalled 100 221 W.Arthur city tree root r/r 10 LF 50 1020 S.3rd city tree root non-sawable 35 LF 175 1007 S.Grand 20 LF spalled 100 1019 S.3rd 20 LF 2 spots 100 504 W.Cleveland 310 LF 1550 805 S.3rd city tree root non-sawable 30 LF 150 404 W.Harrison 30 LF 150 905 S.5th 70 LF 350 525 W.Harrison 65 LF spalled 325 822 S.5th cit tree root r/r 5 LF 25 822 S.5th 30 LF spalled and city tree involvement 150 426 W.College 28 LF 140 424 W.College 25 LF 125 807/811 S.6th 20 LF in driveway 100 412 S.6th city tree root 50 420 N.Willson city tree root 35 40 j 619 W.Babcock 35 LF 2 spots 175 II 628 W.Main 15 LF on Main 5Ox6 on 7th 300 75 606 N.7th 15 LF on 7th 75 Totals 9495 755 Indicates city responsible for repairs R9-11(L) SIDEWALK CLOSED AHEAD CROSS HERE 30"X24" SIDEWALK CLOSED 24"X 18" SIGNS ARE TO BE PLACED AT THE NEAREST LEGAL CROSSING TO THE WORK AREA. MAY ONLY BE USED IF A PARALLEL SIDEWALK EXISTS ON THE OTHER SIDE OF THE ROADWAY. SIDEWALK CLOSED 24"X18" R9-1 1(R) SIDEWALK CLOSED AHEAD CROSS HERE 30"X24" SIGN ® WORK SITE TRAFFIC DRUMS OR CONE CITY OF BOZEMAN SCALE: PEDESTRIAN TRAFFIC NO. 01570-7 CONTROL FOR TEMPORARY NONE FEB 2007 STANDARD DRAWING SIDEWALK CLOSURE 5' 5 2% t Sk I F R9-9 I SIDEWALK CLOSED TEMPORARY ACCESS RAMP ADEQUATELY SUPPORTED ° ° FENCING FENCING SIDEWALK CLOSED MUST MAINTAIN 4' CLEAR AREA K "`�" R9-9 BETWEEN FENCING. WALKWAY MUST BE SMOOTH AND KEPT CLEAR OF 11 FENCING AS SHOWN MAY USED OBSTRUCTIONS FOR SHORT TERM (LESS THAN How APPROPRIATE TRAFFIC j 30 DAYS) INSTALLATION. MORE ME CONTROL PLAN MUST BE I PERMANENT STRUCTURES WILL BE USED FOR LANE CLOSURES REQUIRED FOR LONGER TERM. --- A COVERWALK MAY BE REQUIRED FOR OVERHEAD OPERATIONS (IF HEIGHT MINUS 10' EXCEEDS DISTANCE FROM WALK WAY TO WORK AREA) 1 I CITY OF BOZEMAN SCALE: SIDEWALK CLOSURE NO. 01570-5 STANDARD DRAWING NONE WITH FEB 2007 DETOUR 5.4" (0.45') 24" 9' 2" ° 4. TOPSOIL° 3"R 5„ (TYP.) 4"R 4 3�4"TO PER 1' SLOPE \/ ° ° ° 12" 6 7.5" 91, °d ° . 4. O O O O 0 0000000000000000000000000000000 CRUSHED GRAVEL O O O O O O O O O O O O O O O O BASE - 3' MIN. 0000000000000000000000000000000 SUB-BASE COURSE AS REQUIRED COMPACTED SUBGRADE 0.5" 1.5.E 3/4" -3/4" PER 1' SLOPE 3 4" PER 1' SLOPE 1 2" PER 1' SLOPE y 9.5" DROP CURB FOR DRIVEWAYS DROP CURB FOR PEDESTRIAN RAMPS SPILL CURB NOTES: 1. Subgrade or base course compaction shall conform to section 02230 (M.P.W. Specs., 1996 ed.) 2. Contraction joints shall be placed at 10' intervals and shall have a minimum depth of 3/4" and minimum width of 1/8". 3. 1/2" expansion joint material shall be placed at all P.C.s, P.T.s, curb returns and at not more than 300' intervals. The expansion material shall extend through the full depth of the curb and gutter. 4. No curb and gutter shall be placed without a final form inspection by the City Engineer or his representative. 5. Concrete shall be Class M-4000, 6. Crushed gravel base shall meet the requirements of Section 02235 (MPW SPECS, 2003 ed.) For curb and gutter replacement projects, washed rock may be used for the gravel base. CITY OF BOZEMAN SCALE: INTEGRAL CONCRETE NO, 02528- 1 STANDARD DRAWING NONE CURB & GUTTER Revised Mar. 2006 d ( R = 15' BACK OF CURB d a PT da d B °�• 'e. •.e.o•. X 1' (TYP.) DOWEL WITH 24' N0.5 a. EXPANSION REBAR 3" INTO BACK e. JOINTS OF CURB, 3 CLEAR ° N C •.• .a .° °.. °e .,a e d. A .. �� MAX. ° 4 . 4' ..... ° a d.• • ' o ° 5 ° ' X 5�"' SIDEWALK :2 1:20 MAX. ° 5' SIDEWALK (TYP.) 1 a a d' SCALE: >" =5' OWEL C 5 1/2' BLVD. (TYP.) a 6' THICK CONCRETE SURFACE RAMPS TO BE CONSTRUCTED WITH DETECTABLE �\EXPANSION Flow line WARNING SURFACES COMPLYING WITH ADAAG JOINT COVERING THE ENTIRE WIDTH OF THE RAMPS`. ONE COR14ER OF THE DETECTABLE WARNING MUST BE WITHIN 8 OF GUTER FLOW LINE; NO OTHER POINT ON THE LEADING EDGE OF THE DETECTABLE WARNING STORM DRAIN INLET MAY BE MORE THAN 5' FROM THE FLOW LINE. (TYPICAL LOCATION) REINFORCE CONCRETE IN RAMPS WITH FIBERMESH"AT A RATE IF 1 1/2 lbs./C.Y. OR WITH 6x6x10 GAUGE WIRE MESH 12 � 5'-0' � 1 TOP OF CURB TRANSITION TO NORMAL SIDEWALK ELEVATION. DISTANCE VARIES. SIDEWALK r 5' SIDEWALK 5•5„ NO LIP 5.15' VARIES LANDING FLOW LINE SECTION B-B NO LIP 9 5„ mac. NO SCALE } , 6„ STANDARD p 6" 6" CONCRETE CURB SECTION SIDEWALK DEPRESSED WALK LANDING RAMP 3" GR EL BASE (TYP.) SECTION A-A NO SCALE SECTION C-C CONSTRUCTION NOTES: NO SCALE 1, Standard applies to new construction, with max. curb R=15% and min. 5.5' boulevards. 2. Romp and curb can be poured monolithically, 3. Storm drain inlets shall be constructed "upstream" of ramps. Alternative locations permitted only upon City Engineer's approval. 4. Ramp width shall be 5' minimum. 5. Sidewalk cross—slopes shall not exceed 2%. BOULEVARD SIDEWALK N0. 02529-8 CITY OF BOZEMAN SCALE: PERPENDICULAR AS SHOWN PEDESTRIAN RAMP NOV. 1995 STANDARD DRAWING (15' MAX. RADIUS/5.5' MIN. BOULEVARD) Revised April 2006 SIDEWALK BOULEVARD 5'TYP VARIES- PROPERTY LINE MIN GRAVEL BASE ItY " THICK M-4000 CONCRETE MAINTAIN SECTION B PROPER SIDEYARD SETBACK PER ZONING REGULATIONS ( TRANSITION SECTION FROM CURB TO DROP CURB: �IEXISTING ., 5' MAX. 7 &T EXPANSION JOINTS COMPLETELY AROUND SIDEWALK SECTION DRIVEWAY THROAT WIDTH 24' MAX. CURB & APRON POURED MONOLITHIC IUNLESS OTHERWISE APPROVED CONTRACTION JOINT EXPANSION JOINTS AT CURB RETURNS w I BACK OF CURB SIDEWALK CONTRACTION JOINTS SPACED AT 5' INTERVALS - MIN. I FLOW LINE DEPTH 1". EXPANSION JOINTS TO BE PLACED AT 25' a I EDGE OF GUTTER INTERVALS. 0 a VARIABLE I (5.5' TYP.) CONTRACTION JOINTS TO BE SPACED AT 10' INTERVALS IN CURB & GUTTER EXPANSION JOINT MATERIAL SHALL BE 1/2" THICK PRE-FORMED BITUMINOUS TREATED FIBERBOARD FILLER. ALL CURB REPLACEMENT SHALL BE DONE WITH INTEGRAL CURB AND GUTTER UNLESS OTHERWISE APPROVED, GRADE ESTABLISHED AS 1/4" RISE PER FOOT FROM TOP OF ADJACENT FULL HEIGHT CURB SIDEWALK DRIVEWAY R MATCH EXISTING SIDEWALK GRADE 1' 5' TYP. 5.5' (VARIES) ES) 1/4" PER FOOT SLOPE STREET SURFACE w z J •� d 0 O CK WASHED ROCK 0 CURB & GUTTER 3" MIN. MIN. 6" THICK M-4000 CONCRETE " OR MATCH EXISTING OR REQUIRED SIDEWALK WIDTH SECTION A CITY OF BOZEMAN SCALE: RESIDENTIAL NO. 02529- 1 1 STANDARD DRAWING NONE DRIVEWAY APPROACH DEC 2003 AND SIDEWALK DETAILS ON o0 Z vo x (Ao `A to o3W m N0L, WLd c w Z�O VOA z� w m o t j ZUU �2 to UU d v •- • w °•; O al a � w a. - o En °. U Q ° •. U � 4. O N ♦' Z w U v.. N� Q JU O O o Zw m ¢Z O Z O w0 m Um r QW t- Y U 20 M ° U h _ g0 O Z� J �w F=- v' ZW Of a.ZQ Xw Z O� wF O ' J Q Z Z CLo zz 4- CITY OF BOZEMAN SCALE: CONCRETE CLASS 1 TRAIL NO. 02529-17 STANDARD DRAWING NONE TYPICAL SECTION April 2006 4?t DATE(MM/DD/YYYY) ' ' CP "" EVIDENCE OF PROPERTY INSURANCE 06/27/2016 THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE ADDITIONAL INTEREST. AGENCY PHONE COMPANY A/C No Ext: Marsh USA Inc. Zurich American Insurance Co 333 South 7th Street,Suite 1400 Minneapolis,MN 55402-2400 J43750—BR113-16-17 ; FAX E-MAIL (A/C, /C No): ADDRESS: CODE: SUB CODE: AGENCY CUSTOMER ID#: INSURED LOAN NUMBER POLICY NUMBER Knife River-Belgrade CPP3704500-14 PO Box 9 Belgrade,MT 59714 EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL 01/01/2016 01/01/2017 TERMINATED IF CHECKED THIS REPLACES PRIOR EVIDENCE DATED: PROPERTY INFORMATION LOCATION/DESCRIPTION Re:2016 Sidewalk Installations and Repairs,and Curb Replacements;City of Bozeman;Contract Amount:$320,315.70 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. COVERAGE INFORMATION COVERAGE/PERILS/FORMS AMOUNT OF INSURANCE DEDUCTIBLE 'All Risk"Blanket Real and Personal Property including 25,000,000 25,000 Boiler Machinery,earthquake,flood and wind perils. Leased/Rented Contractor's Equipment($2,500,000 per item,$5,000,000 per occurrence) 5,000,000 25,000 Builders Risk/Installation(See Attached) 25,000,000 5,000 REMARKS(Including Special Conditions Owner,Contractor,Subcontractors,Sub-Subcontractors Engineer,Engineer's Consultants,and any other persons or entities identified in the Supplementary Conditions is/are included as additional insured where required by written contract. CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ADDITIONAL INTEREST CHI-006619831-01 NAME AND ADDRESS MORTGAGEE X I ADDITIONAL INSURED LOSS PAYEE rl City of Bozeman LOAN# PO Box 1230 Bozeman,MT 59771 AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjee0.1 ACORD 27(2009/12) ©1993-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: J43750 LOC#: Minneapolis ADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY NAMED INSURED Marsh USA Inc. Knife River-Belgrade PO Box 9 POLICY NUMBER Belgrade,MT 59714 CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 27 FORM TITLE: Evidence of Property Insurance BUILDERS RISK COVERAGE DURING COURSE OF CONSTRUCTION SUBJECT TO POLICY TERMS AND CONDITIONS. Any one Building,Structure or Project--$25,000,000 Limit(Deductible$5,000) Transmission and Distribution Lines Work--$25,000,000(Deductible$5,000) Paving,Decking of Bridges--$25,000,000 Limit(Deductible$5,000) Sewer/Water or Plumbing--$25,000,000 Limit(Deductible$5,000) Flood-$25,000,000 Limit per Occurrence and Annual Aggregate(Subject to a minimum$5,000 deductible) Earth Movement-$25,000,000 Limit per Occurrence and Annual Aggregate(Subject to a minimum$5,000 deductible) Earth movement in Zones 1 and 2 are subject to a per Occurrence and Annual Aggregate limit of-$15,000,000(Subject to a minimum$5,000 deductible) Other deductibles may apply as per policy terms and conditions. ACORD 101 (2008/01) ©2003 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ®¢ DATE(MM/DD/YYYY) Acc>Ro CERTIFICATE OF LIABILITY INSURANCE 06/27/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Marsh USA Inc. PHONE FAX 333 South 7th Street,Suite 1400 A/C No Ext: A/C No: Minneapolis,MN 55402-2400 ADDRIESS: Attn:MDU.CertRequest@marsh.com INSURER(S)AFFORDING COVERAGE NAIC# J43750-JTLBE-GAX-16-17 INSURER A:Liberty Mutual Fire Ins Co 23035 INSURED INSURER B:WA WA Knife River-Belgrade PO Box 9 INSURER C:Liberty Mutual Insurance Company 23043 Belgrade,MT 59714-0009 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: CHI-006619784-02 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP LIMITS TYPE OF INSURANCE LTR D WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY TB2-641-005097-046 01/01/2016 01/01/2017 EACH OCCURRENCE $ 2,000,000 DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES Ea occurrence $ 500,000 MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 4,000,000 POLICY PR� LOC PRODUCTS-COMP/OP AGG $ 4,000,000 OTHER: $ A AUTOMOBILE LIABILITY AI2-641-005097-056 01/01/2016 01/01/2017 COMBINED SINGLE LIMIT $ 2,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED a cident-Zr $ X HIRED AUTOS X AUTOS Pe $ UMBRELLA LIAR OCCUR EACH OCCURRENCE $ EXCESS LIAB HCLAIMS-MADE AGGREGATE $ DED RETENTION$ $ C WORKERS COMPENSATION WA7-64D-005097-016(AOS) 01/01/2016 01/01/2017 X STATUTE FOTH- AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y� E.L.EACH ACCIDENT $ 1,000,000 N/A OFFICER/MEMBER EXCLUDED? MT Employers Only"' 1,000,000 (Mandatory in NH) P Yers Liability Y��� E.L.DISEASE-EA EMPLOYE $ If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Re:2016 Sidewalk Installations and Repairs,and Curb Replacements;City of Bozeman The Owner,Engineer,and Engineer's consultants is/are included as additional insured under general liability per the attached CG 2010 and CG 2037 endorsements and does not include professional liability coverage. Blanket Additional Insured for Automobile Liability is included per attached designated Insured Endorsement CA 2048. General liability policy includes contractual liability but only to the extent provided in the policy. CERTIFICATE HOLDER CANCELLATION City of Bozeman SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE PO Box 1230 THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Bozeman,MT 59771 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Manashi Mukherjee Maupo �4ti+tc r.. u @ 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD Policy Number: A j2_S 4I-w00509 7--056 Issued by L1f3E;E `I'`r` tIf_frl Lt��L, FIRE .EN`UR N(,;F COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, NOTICE OF CANCELLATION TO THIRD PARTIES hhis onchorseament nic}difies insurance provided under the fallowing: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PARI.. TRUCKERS COVERAGE PART EXCESS AUTOMOBILE. LIABILITY INDEMNITY COVERAGE PART ;ELF-INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PANT PRODUCTSI`CONIPLETED OPERATIONS LIABILITY GOVERACE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY— UMBRELLA COVERAGE FORM Schedule Dame of Other Person(s) C Email Address or mailing address: dumber Days Notice: 0 rg ani�ation(s - per schedule of certificate Per schedule of certificate holders on gn holders on file withtt)e file with the Company. Company, �._. . .. --- A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the parsons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above„ if any, before the cancellation becomes effective:. In no event does the notice to the third party exceed the notice to the first narned insured. B. This adv: nrse notification of a pending cancellation of coverage is Intended as a courtesy only. Our failure to provide such advanCr, notification will riot extend the policy cancellation date nor negate cancellation of the policy. All other ternns and conditions of this policy rernain unchanged. k LIM 99 01 05 11 2011 t_iberty Mutual Group of Companies. All rights reserved. Page 1 of 1 InClUde:3 copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: AI2-641-00 5097-056 COMMERCIAL AUTO CA 20 48 10 13 THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsers nt modifies insurance provided under the fallowing: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOP CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who Lire "insureds" for Covered Autos Liability Coverage under the Who Is An. Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverat�a Form, SCHEDULE - ----------------- — Name Of Person(s) Or Orcganizativn(s): Any person car organization whom You have .agreed in writing to add as an additional insured, but only to c.overagc and minimum limits of insurance required by the written agreement, and in no event to exceed either 'fie scope of coverage or the limits of insurance provided in this policy. i phis policy will be primary and non-contributory to any like insurance available to the person or organization noted above. Iraforraiatrrar i regUirrd to Corriplete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured"for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph AJ, of Section 11 — Covered Autos Liability Coverage in the Business Auto and' Motor Carrier Coverage Forms and Paragraph D.2, of Section I — Covered Autos: Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 <e lrrSurarrce SPrvic:es Office. Inc.,2011 Page 1 of 1 THIS ENDORSEMENT MENT H a TIME POLICY. PLEASE READ IT CAREFULLY. OWNERS, LESSEES OR ADDITIONAL INSURED CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the folintving: COMMERCIAL GENERAL LIABII-ITY COVERAGE PART SCHEDULE :.. . .... .......-- ------ Name Of Additional Insured Person(s) Location(s) Of Covered operations 'i Or Orctanization(s); Any persons or organizations for whom you have All locations as required in writing and agreed to agreed in writing, pries to an "occurrence:" or prier to an "occurrence" or offense. "offense", to provide, additional insured status. .. --- IrIfornlation re guired to complete this Schedule, if not shown above, will he shown in the Declarations. A. Section II -- Who Is An Insured is amended to H. With respect to the insurance afforded to these include as an additional insured the persr�r or additional insureds, the following additional exclu organization(s) shown in the Schedule, but only sions apply: with respect to liability for "bodily injury", „property This; insuranc;e doers not apply to "bodily injury" or damage" or "personal and advertising injury" °property damage"Occurring after: CaUl9ed, in,,vhole or in part, by; t. All work, including materials, parts or equip- 1. Your acts or ort7issions; r�r ment furnishe{ ire connection witk-r Such work, 2. The acts or omissions of those acting on your on the project (ether than service, maintenance behalf; or repairs) to be performed by or on behalf of in the performance of your ongoing operations for the additional insureds) at the location Of the the additional insured(s) at the location(s) desig- covered operations has been completed; or hated above, CC 20 10 07 04 car ISO Properties, Inc., 2004 page I of 2 2. That portion of "your work" out of which the injury or darnage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the sartne project. 7 hi4 errdvrsemerd is executed by thy, LIBERTY MUTUAL FIRE IWWRANGF COMPANY F rerniuni $ F ffeC.tive Data Expiration C aw, For ritt:achrnent to Pokey Noc 182-641•QQ5097-0 4C Audit basis I_:;rIcd Tv a Countersigned by ------------ Authorized Repreuentalive I stri;rJ Sales Office and No, End.Serial No, Page of 110 ISO Properties, ]no,, 2004 CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. OWNERS, LESSEES OR ADDITIONAL INSURED COMPLETED OPERATIONS CONTRACTORS This endorsement rnodifie:, insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE DAFT SCHEDULE Name Of Additional Insured Person(s) Location And Description of Completed Operations Cr Cr anizatirn�s ; Any persons or organizations for whom you have All locations as required in",Waiting, and agreed to agreed in writing, prior to an "occurrence"or prior to an "occurrence"or offense. "offense;", to provide additional insured status. Information required to complete this Schedule, if not shown above, will be �Down in the [�eclaratinns. Section 11 Who Is An Insured is amended to include as an a n additional insured the person(s) or argani< rtiont;u} sh{awn in thO Schedule, but only with respect to liability for"bodily injury"or"property dam- age'" caused, in whole of in part, by "your wo " at the Icaration designated and described in the sched- cllo of this endorsement performed for that additional insured and irlc:luded in the "products-ccn-Ipit�ted operations hazard". This endorsement is executed by the LISERIY MUTUAL FIRE INSURANCE COMPANY Pramium S E teciive Date Expiration Crate Fo ittadlMerlt to P71ic.y No T132-641-00 a097-040 Aa,riit oasis vsued'lo Countersigned by � _ - ....-- - Autharizec!Represex4a ive s;I;e; Sales Office and No. End.Serial No. CG 20 37 07 04 C, ISO Properties, Inc., 2004 Page 1 of'I Policy Number rf_ 3"41-641-(ttl5ti97-04 Issued b}y IA RER l Y NIL; t,IAL, FIRE INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION TO THIRD PARTIES T lis endorserrient modifics insurance provided under the following, BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVE[ PART TRUCKERS COVERAGE FART EXCESS AUTOMOBILE LIABILITY INDEMNITYC COVERAGE PART SELF--INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART Pf�Ot UC�I"SIC C)ivi€ hE7`Et7 OPERA LIABILITY COVERAGE PART t_IC,UOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY---UMBRELLA COVERAGE FORM Schedule Name of Other Perscsn(s) f Email Address or mailing address: Number Lays Notice. Arcdarlixation(s �._ — _._w_. Per Schedulc, of certificate 90 holders on file w'tlr the Company± ... -- _..... - A. If we oancei this policy for any reason other than nonpayrnent of Pren1iu111, we will natify the pet, on of organizations shown in tho ,:3r..he itrlr at_aov We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if, before the cancellation becomes effeotive. to rt0 ov'ent does the notice to the third party exceed the notice to tile:first named insured. B. Tlti;,, advance, notification of a pending cancellation of coverage is intended as a courtesy only. Our farltffea to provide such advance notification will not extend the policy cancellation date near negate cancellation of tide policy, All other terms and conditions of this policy remain unchanged_ LIM 99 01 05 11 >2011 Liberty N'lutual Group of Cornpanies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its Pell-lission, POLICY NUMBER:TB2-641-005097-046 COMMERCIAL GENERAL LIABILITY CG 25 03 05 09 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ 1TCAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modes insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. For all sums which the insured becomes legally B. For all sums which the insured becomes legally obligated to pay as damages caused by "occur- obligated to pay as damages caused by rences" under Section I — Caverage A, and for all It under Section I -- Coverage A, and medical expenses caused by accidents under for all medical expenses caused by accidents Section I — Coverage C, which can be attributed under Section I — Coverage C, which cannot be only to ongoing operations at a single designated attributed only to ongoing operations at a single construction project shown in the Schedule below: designated construction project shown in the 1. A separate Designated Construction Project Schedule below; General Aggregate Limit applies to each des- 1. Any payments made under Coverage A for ignated construction project, and that limit is damages or under Coverage C for medical equal to the amount of the General Aggregate expenses shall reduce the amount available Limit shown in the Declarations. under the General Aggregate Limit or the 2. The Designated Construction Project General Products-completed Operations Aggregate Aggregate Limit is the most we will pay for the Limit, whichever is applicable; and sum of all damages under Coverage A. ex- 2. Such payments shall not reduce any cept damages because of "bodily injury" or Designated Construction Project General "property damage included in the products- Aggregate Limit. completed operations hazard", and for medi� cal expenses under Coverage C regardless of C. When coverage for liability arising out of the the number of: "products-completed operations hazard" is prov- ided, any payments for damages because of a. Insureds; "bodily injury" or"property damage" included in the b. Claims made or"suits" brought; or "products-completed operations hazard" will c. Persons or organizations making claims or reduce the Products-completed Operations Agg- regate Limit, and not reduce the General Agg- regate Limit nor the Designated Construction 3. Any payments made under Coverage A for Project General Aggregate Limit. damages or under Coverage C for medical D. If the applicable designated construction project expenses shall reduce the Designated Con- has been abandoned, delayed, or abandoned and struction Project General Aggregate Limit for then restarted, or if the authorized contracting that designated construction project. Such parties deviate from plans, blueprints, designs, payments shall not reduce the General Ag- spec cations or timetables, the project will still be gregate Limit shown in the Declarations nor deemed to be the same construction project shall they reduce any other Designated Con- struction Project General Aggregate Limit for E. The provisions of Section 111 — Limits Of Insurance any other designated construction project not otherwise modirfied by this endorsement shall shown in the Schedule below. continue to apply as stipulated. 4. The limits shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Decla- rations, such limits will be subject to the appli- cable Designated Construction Project Gen- eral Aggregate Limit. CG 25 03 05 09 0 Insurance Services Office, Inc., 2008 Page 1 of 2 SCHEDULE Designated Construction Project{s}; All Construction projects not located at premises owned, leased or rented by a Named Insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 25 03 05 09 O Insurance Services Office, Inc., 2008 Page 2 of 2 { NOTICE OF CANCELLATION TO THIRD PANTIES A, If we cancol this policy for, �-rny reason other than nonpayment of premium, we will notify the persons or organizations shoe/n in the S(.-hedule: t)elow. V+Jr;will semi notice to the ernail or rnrrifing address listed ta'efott+ at least 10 days, or the Of clays listed below, if any, before cancellation berornPs effective. in no event cfoos the notice to tine third paf-y exoeed the nolicci to the first named ins :red, E:'_ This acivanr.;o notification of a lending c;ar'icellation of covorage is intended as a courtesy only, Our failure to provide such advance rro':ification will not extend the policy cancellation Elate nor negate cancellation of the policy. Schedule Wine of Other Person(s) Email Address or mailing address: Number Days Notice: Pet sc:hodule;of certifictate 17,C7 holders on file with the company All other terms and conditions of this policy remain uncl`rangod, s,>ued by L.itresty Insurance:(`•arpotation 21814 f—or,attachrrai;nt to policy tlo_ VA7...641)--UO 091-016 Effective pate 01 f()7 f M.6 r,,emicttn s I,33tian -to Centennial Errer+1Y?lcidinrts, inc. w fir 90 18 06 11 C)2011, Liherty Mutual troop. All Rights Reserved. Page 1 of 1 Eel. O&O'l!201 1 r--� MONTCON-09 JMCMILLAN DATE(MM/DDIYYYY) CERTIFICATE OF LIABILITY INSURANCE 6/27/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Billings Office PHONE 406 238-1900 FAX No: 406 245-9887 Pa newest Insurance,Inc. _LAIC,No,Eutt: ) ) y E-MAIL P.O.Box 30638 ADDRESS: Billings,MT 59107-0638 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Safety National Casualty Corp INSURED INSURER B: JTL Group,Inc.DBA Knife River-Belgrade INSURERC: A Member of the MCCF i PO Box 9 INSURER D Belgrade, MT 59714 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE TADDL`SUBR POLICY EFF POLICY EXP LIMITS LTR( INSD I WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE I$ DAMAGE TO RENTED —i CLAIMS-MADEEl OCCUR I PREMISES Ea occurrence $ MED EXP(Any one person) $ PERSONAL& GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGDV INJURY $ RELATE $ POLICY OTHER:' JEO —�LOC ( PRODUCTS-COMP/OP AGG �� AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident !^ BODILY INJURY(Per person) $ ANY AUTO � __ I ALL OWNED F SCHEDULED I L BODILYINJURY(Peraccident) $ AUTOS AUTOS L_ NON-OWNED I PROPERTY DAMAGE $ II __ HIRED AUTOS !AUTOS Per accident $ UMBRELLA LIAB OCCUR j EACH OCCURRENCE $ EXCESS LIAB CLAIMS MADE I AGGREGATE is DED I �RETENTION$ Is WORKERS COMPENSATION I I STATUTE I ORH- AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N I E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? ❑!N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below I E.L.DISEASE-POLICY LIMIT $ A (Workers Compensation I ISP4054451 1 01/01/2016 01/01/2017 Coverage A Statutory I I j DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) Subject to the terms and conditions of the policy as issued by the Insurance Company.SIR for Work Comp$$1,000,000 per occurrence.Covers Montana State Resident Employees.All claims are administered by the Montana Contractor Compensation Fund(MCCF). JOB:2016 Sidewalk Installations and Repairs,and Curb Replacement City of Bozeman i I CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Bozeman THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Y ACCORDANCE WITH THE POLICY PROVISIONS. PO Box 1230 Bozeman,MT 59771 AUTHORIZED REPRESENTATIVE ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD