HomeMy WebLinkAboutTIF Minutes 4-16 /
Downtown Tax Increment Finance
Board Meeting Minutes
April 19, 2016
Attending: Bobby Bear, Bob Hietala, Vonda Laird, Jeff Krauss, Chris Naumann
Absent: Shannon Haish, Bob Lashaway, Bill Stoddart
Public Comments: None
Disclosure: None
Minutes
ACTION: Bob
Hietala moved to approve the March minutes as presented.
Vonda Laird seconded the motion.
All voted in favor.
Financial Report
Chris presented the finance report as of April 17,
2016.
No new income to report since the February figures.
The most recent expenses included: $25,000 for Downtown Partnership 4th quarter management fee and approximately another $7,000
on four different projects.
The board had no other questions regarding the finance report.
Executive Director’s Report
Technical Assistance Program Update—NO CHANGES
Four grants have
been awarded in FY2016—shown at the bottom of the chart. The chart also lists uncompleted grants that were awarded in FY2015. Keep in mind that the committed grant amounts are only tentative
since the actual reimbursement amount will be determined as a one to one match upon completion of the grant work. As a reminder, the Planning grants have a $7500 cap and the Façade grants
are capped at $3000. Bold listings indicate completed.
/
Downtown Fiber Network Project Update
Two construction bids were received for the installation of the fiber conduit within the
Downtown and North 7th urban renewal districts. Saunders Line Construction is preparing to implement the following timeline:
May 9: Project Start Date
Late May: begin work in downtown
district
June 30: Project Completion Date
I will be communicating with downtown property and business owners the specific blocks where they will be working a week in advance via e-announcements.
New
Floodplain Map Update
During meetings with the Downtown BID and TIF boards questions surrounding the potential for Mill Ditch to be utilized as a downtown flood mitigation facility were
raised. The draft floodplain area downtown is expansive, due in part to reduced flow moving down Mill Ditch in the draft hydraulic model when compared to the existing effective model.
Water in Mill Ditch is diverted from Bozeman Creek and forms the “stream” at the base of Peet’s Hill that moves through the Library property and Lindley Park before discharging to the
East Gallatin River north of the Interstate. Conceptually, Mill Ditch could serve as a flood control bypass facility for the downtown area. An evaluation of the capacity of the ditch
to serve this purpose must be performed, however, which will require engineering analysis and manipulation of the FEMA hydraulic model to understand how the respective floodplains of
Bozeman Creek and Mill Ditch would change if more floodwater is directed from one to the other. The results of the evaluation would inform decisions on whether to pursue a potential
flood hazard mitigation project. To perform this evaluation, the Engineering Division has placed $20k in the proposed FY17 budget and will be issuing an RFP to select a qualified engineering
firm to perform this work in the near future. The $20k would also fund an overall evaluation of the FEMA hydraulic model to identify potential problem areas in the draft mapping for
the city to bring forward during the formal appeal period.
Building Project Updates
Lark Addition (corner of Grand and Main) 4-5 story building with 28 new Lark hotel rooms. Passed
through DRC and DRB. CC Final Site Plan Approval has been delayed at the request of the applicant.
5 West Building (northwest corner of Mendenhall and Tracy) Construction began on Friday
October 2nd with the demolition of the old Opportunity Bank building. Scheduled to open in Jan/Feb 2017.
Etha Hotel (old Armory building) the project has all the entitlements and permits
needed to begin construction but no start date has been publicized.
Willson Residences (old East Willson School) being redeveloped into 18 residential units with underground parking.
Partial completion scheduled for Summer 2016.
NeBo (400 block of East Mendenhall) 2 buildings, four floors each. 12 residential units each with 2-car garage. Expected completion 4th
quarter 2016.
Rialto Theater Application to redevelop the Rialto has been reviewed by the DRC. Next steps include submitting FSP and Building Permit.
New Businesses Update
Bozeman
Taproom—Mendenhall/Rouse…Service Elec (north) opening in June
Union Market— Mendenhall/Rouse…Service Elec (south) opening in July
Spice and Tea Shop—Stylon
Bisl Restaurant— now open
in Poor Richards space
Restaurant—Universal Athletics
Delicious Bakery—Downtowner (third down from Babcock corner) opening in May
Berkshire Hathaway Real Estate—Perspectives/Downtowner
(nearest Babcock corner)
Finn Restaurant—closed…new Mexican bar and restaurant opening this summer
Caspian—Persian restaurant opening end of April in Bozeman TV and Appliance space
???—Element
Hotel restaurant still lacks a proprietor
Planning Updates
In this section I will provide update about several important City planning processes.
City of Bozeman Planning Updates
Transportation
Master Plan www.bozemantmp.com
Consultants: Peccia & Associates (Helena), Alta Planning (Bozeman)
Timeline: September 2015 (kickoff) through September 2016 (adoption)
UDC Revisions
http://bozeman.net/Projects/UDCCodeupdate/Home
Consultants: Makers (Seattle), Leland Group (Portland), Studio Cascade (Spokane)
Timeline: September 2015 (kickoff) through February 2017
(adoption)
Neighborhood Conservation Overlay District Analysis
Consultants: KLJ/ArchTrio
Timeline: Final report released December 18, 2016
http://www.bozeman.net/CMSPages/GetFile.aspx?nodeguid=39be
de2f-b3ab-4c6c-a7c3-f2d4696e4ecb&lang=en-US
Comprehensive Parking Plan
Consultants: Rick Williams Consulting (Portland)
Timeline: September 2105 (kickoff) through April 2016 (adoption)
City
Vision & Strategic Plan
Consultants: HDR
Timeline: March 2016 (kickoff) through October 2016
2017 Downtown Improvement Plan
Consultants: yet to be determined
Timeline: yet to be determined…RFP
summer 2016
2017 Community Plan (City Growth Policy) Update
Timeline: October 2016 through late 2017
Discussion and Decision Items
Draft FY2017 Budget
Chris presented the draft FY17
budget (see below).
Projected revenues equal just shy of $2.5 million. Expenses over $100,000 include: $430,000 for garage debt service; $150,000 for fiber internet infrastructure; $250,000
for public parking improvements; $105,000 for Partnership management fee; $100,000 residential incentive program; $100,000 encumbered hotel incentive; and $100,000 explosion impact fee
program.
Chris highlighted two new expenses for FY17: 1) $60,000 for Downtown Plan update; and 2) $60,000 for one-way traffic modelling project. The board agreed these should be included
in the budget.
The board also said they would like to renew the BPC-TIF MOU to contribute the interest income to the garage long-term maintenance fund. Chris said he would prepare a
new 3-year MOU and gather the necessary signatures.
Chris reminded the board that the Explosion Impact Fee MOU expires December 31, 2016 and that the board had previously discussed not
renewing it for a third 3-year term.
Chris said he would make the modifications discussed and the board would review and approve the budget at the May meeting.
/