HomeMy WebLinkAbout16- Morrison Maierle Amendment 5 North 7th Lighting Design Main to Villard!Morrison ■� Maierle engineers - surveyors • planners - scientists April 14, 2016 City of Bozeman, Economic Development Attn: David Fine 121 N. Rouse PO Box 1230 Bozeman, MT 59771-1230 Re: Bozeman — N. 7th Light Design & Const. Contract Amendment #5 -Signed MMI#: 0417.063 Mr. Fine: 2880 TECHNOLOGY BLVD. W. • P.O. BOX 1113 • BOZEMAN, Mr 59771 406.587.0721 • www.m-m.net As requested we have modified Amendment #5 to include "streetscape" design; including a pre - design study, boulevard tree, planter, pavers and irrigation designs. Task 800 incudes this requested effort. Our effort on this portion of the project will be assisted by DHM Design, a landscaping subconsultant with extensive experience with urban tree and streetscape design. We feel their expertise is necessary to ensure project success. Please find two (2) signed originals of updated Amendment #5 to the PSA for the North 7th Lighting Design and Construction Administration project. This amendment includes effort associated with the design of luminaires and streetscapes between West Villard Street and West Main Street. This amendment also includes an allowance for miscellaneous engineering as requested by the City of Bozeman/Midtown Board as well as the above described 11streetscape" design. The amendment and associated attachments are enclosed. If you have any questions or require additional information, please let me know. As always, we appreciate the opportunity to work with you and look forward to continued service in the future. Please contact me at 922-6823 if you have any questions. Sincerely, Uzi 17�_ Kevin Jacobsen, .E., LEED AP Senior Civil Engineer Enclosure(s) N:\0417\063\Contracts-Client\Contract Amend #5 -main to villard\Contract Amend #5 Letter.docx We create solutions that build better communities. AN EMPLOYEE -OWNED COMPANY • AN EQUAL OPPORTUNITY EMPLOYER --- MINORITIES / FEMALES / DISABLED / VETERANS AMENDMENT NO. 5 TO PROFESSIONAL SERVICES AGREEMENT FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION MMI. No. 0417.063 THIS IS AN AGREEMENT made as of �'106 , between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and Morrison- Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-1113 (ENGINEER). WHEREAS the parties previously entered into aProfessional Services Agreement dated July 11, 2011, herein referred to as the Original Agreement, for professional engineering services for the North 71 Lighting Design and Construction Administration project; and WHEREAS, the scope of the Original Agreement included preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment No.l to the Original Agreement included additional miscellaneous services; and WHEREAS, the scope of Amendment No.2 to the Original Agreement included a pre -design investigation services phase; and WHEREAS, the scope of Amendment No.3 to the Original Agreement included additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services; and WHEREAS, the scope of Amendment NoA to the Original Agreement included additional pre -design investigation services; and WHEREAS, the parties desire to amend provisions ofthe Original Agreement to include additional preliminary design, final design, bidding and negotiating services, construction services and miscellaneous services for the project. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C-5 — SCOPE OF SERVICES FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION and EXHIBIT D-5 — ENGINEERING FEE ESTIMATE are hereby incorporated in and made part of this agreement. The Scope of Services and Engineering Fees are increased per these exhibits. ARTICLE 1- ENGINEERING SERVICES Article 1.1 of the original agreement is modified to include the following: 1.1. The detailed description of the specific project components is described as follows: Perform preliminary and final design level engineering services for improvements to North 7' Avenue, between West Villard Street and West Main Street. 1 Perform bidding and negotiating services and construction engineering services for improvements to North 7'h Avenue, between West Villard Street and West Main Street. Perform miscellaneous services as requested by the City of Bozeman for improvements to North 71h Avenue, between West Villard Street and West Main Street. ARTICLE 6 - COMPENSATION FOR ENGINEERING SERVICE Article 6.1 of the original agreement is modified as follows: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $212,579.59 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: $41,880.56 (-30% of design fee) until the Pre -Design Investigation Phase report and exhibits have been submitted to the OWNER. $118,796.00 (-53% of design fee) until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $51,903.03 (-17% of design fee) until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuantto the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 ofthis Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Article 6.2 of the original agreement is modified as follows: Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Construction Phase and Project Documentation Services an amount not to exceed $ 145,656.00 except as provided under 6.2.1.2 and 6.2.4. 6.2.1.1 Costs Compensation. Compensation forthese services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. K 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $ 12,780.00 which includes $ 0.00 for consultants employed by the Engineer and $ 12,780.00 for all other reimbursable expenses. The estimated .i I .. I . o Penses are identified iH Exhibit ME" 6.2.3. Failed Test Expenses, The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 6.3 DIRECT LABOR COST PAYMENT FOR MISCELLANEOUS SERVICES AND EXPENSES OF ENGINEER. Article 6.3 of the original agreement is modified as follows: Task 701, 702 and 703 shall be compensated in accordance with the following: 6.3.1 The OWNER shall pay for Miscellaneous Services an amount not to exceed $74,894.80 except as provided under 6.3.1.2 and 6.3.3. 6.3.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.3.1.2 Notification. At any time during the project that it becomes apparent that the Miscellaneous Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.3.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.3.1.1. The amount and terms of any additional compensation under 6.3.1.1 or 6.3.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 3 estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.3.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount ofthe costs incurred up to an amount not to exceed $ 9,144.80 which includes $ 0.00 for consultants employed by the Engineer and $ 9.144.80 for all other reimbursable expenses. The estimated mimbufsable 6.3.3 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15, or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 7.3 DIRECT LABOR COSTS Article 7.3 of the original agreement is modified as follows: Direct Labor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, drafters, specification writers, estimators, other technical and business personnel; but does not include indirect payroll related costs or fringe benefits. For the purposes of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principals $60.00/hour Supervising Engineer III $56.00/hour Supervising Engineer II $53.00/hour Supervising Engineer I $50.00/hour Senior Engineer II $46.00/hour Senior Engineer I $42.00/hour Design Engineer II $39.00/hour Design Engineer I $35.00/hour Staff' Engineer $31.00/hour Engineer Intern $28.00/hour Survey Manager $48.00/hour Land Surveyor It $33.00/hour Land Surveyor I $30.00/hour Survey Technician $28.00/hour Engineer Technician II $34.00/hour Engineer Technician I $30.00/hour Technician II $26.00/hour CADD Drafter $24.00/hour Two Person Survey Crew $53.00/hour Clerical $24.00/hour *Non professional classified employees subject to time and one-half over time rates. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA BY: (21 (City Manager) DATE: S- 9 —)6 ATTEST: ?, B Y: (Ci Jerk) MORRISON-MAIERLE, INC. BY: Ck— (Vice-President) DATE: A -pr t. ` k3 42 U j N:\0417\063\Contracts-ClienWonlracl Amend 0 -main to villard\PSA Amendment#5.doc 5 Mm Morrison 611 Maierle engineers - surveyors - 0l90ne,s • saemwg Exhibit C-5 - Scope of Services for N. 7" Lighting Design and Construction Administration West Villard Street to West Main Street April 12, 2016 Preliminary Design Phase The preliminary design phase will proceed following written authorization to proceed from the owner. The additional topographic survey and preliminary engineering design shall occur during this phase. The following sections describe each task as well as identifying the deliverable for each task. Task 101 Topographic Survey Task Description — The topographic survey will be completed following written authorization to proceed from the owner. All surface features, as well as subsurface features, will be mapped on project coordinates for areas that have been modified since the last survey completed. Additional survey will be completed as necessary for private property where improvements are proposed. Key features; including intersections, anticipated utility crossing points, and potential easement areas will be surveyed as well. City of Bozeman horizontal and vertical control networks will be used for the survey. Task deliverable —Updated topographic mapping illustrating survey findings. Task 102 Site Evaluation Task Description — Previously completed. Task deliverable —N/A Task 103 Lighting Layout Task Description — Updating the preliminary lighting layout for Phase 3. Task deliverable — Preliminary Lighting Layout. N0 Morrison � Maierle engineers • surwyors • planners . svenmis Task 104 Lighting Calculations and Modeling Task Description — Updates to lighting modeling and calculations per City of Bozeman, MDT, and IESNA standards. Task deliverable — N/A Task 105 R.O.W. Exhibits Task Description — Previously completed. Task deliverable — N/A Task 106 SILD Exhibits/Legal/Packet Task Description — Previously completed. Task deliverable — N/A Task 107 Coordination - City, MDT, Utilities, Suppliers Task Description — On-going coordination with regulatory agencies, utilities and product suppliers as it relates to the North 7h Lighting Design and Construction Administration project. Task deliverable — N/A Task 108 Traffic Control Plan Task Description — Completion of traffic control plan to be included in the construction documents. Task deliverable — Inclusion in construction documents. 2 O0 Morrison 411 Maierle engineers • surveyors • pta-trs - strenusts Task 109 Civil Components Task Description — Completion of design of sidewalk, boulevard, grading, landscaping, signs etc. for sixteen (16) properties between Villard and Main Streets. Task deliverable — Inclusion in construction documents. Task 110 Preliminary Plans and Specifications Task Description — This task includes effort associated with preparation of a preliminary set of construction drawings and specifications. Plans and specifications to be completed in accordance with City of Bozeman standards. Task deliverable — Preliminary Plans and Specifications. Task 111 Preliminary Engineer's Estimate Task Description — Preparation of an Engineer's estimate of probable cost based on the preliminary plans and specifications. Task deliverable — Preliminary Engineer's estimate. Task 112 NSURB Meetings Task Description — Attendance at up to six (6) NSURB meetings or other applicable meetings to present project status and project findings. Task deliverable — Attendance and presentations at NSURB meetings. Task 113 Quality Assurance/Quality Control Task Description — This task includes effort associated with project coordination and quality assurance review. Task deliverable — N/A 3 E0 Morrison � Maierle 0.9 vers • surveyors • planners • scmAl"Is Final Design Phase The final design phase will proceed following written authorization to proceed from the owner. Following review and comments by reviewing authorities, we will incorporate required changes into the final design plan set and specifications. The following sections describe each task as well as identifying the deliverable for each task. Task 201 Final Plan Set Preparation Task Description — A final set of construction plans based on comments and changes requested from the governing reviews. Plan set will be a "construction ready" set. Task deliverable — Final plan set. Task 202 Final Specifications / Bidding Documents Task Description — A final set of construction specifications. Specifications will provide the bidding documents for the construction project. Specifications and contract documents will be per City of Bozeman standards and will be "bid ready". Task deliverable — Final specifications and bidding documents. Task 203 Final Review / Permitting Coordination Task Description — Final coordination for review and permitting items associated with the project. Task deliverable — Technical memorandum with findings, as necessary. Task 204 Quality Assurance / Quality Control Task Description — This task includes effort associated with project coordination and quality assurance review. Task deliverable —N/A 4 �E Morrison Maierle Cn9me0rs •surveyors • plin,ws • sc."wts Bidding or Negotiating Phase The bidding or negotiating phase will proceed following written authorization to proceed from the owner. The following sections describe each task as well as identifying the deliverable for each task. Task 301 Prepare Advertisement, Bid Document Reproduction, Bidders List, Process Deposits Task Description — Prepare project advertisement and complete all coordination required to distribute construction documents to bidders. Task deliverable — Bidders List. Task 302 Conduct Pre -Bid Conference and Respond to Contractor Requests Task Description — Conduct pre-bid conference and respond to all Contractor RFI's prior to bidding. Task deliverable —N/A Task 303 Prepare and Issue Addendum Task Description — This task provides allowance for issuance of one (1) addendum to the plans and specifications. Task deliverable — Addendum No. 1, as necessary. Task 304 Attend Bid Opening, Prepare/Evaluate Bid Tab, Award Recommendation Task Description — Attend bid opening and subsequently process bid tab and make award recommendation. Task deliverable — Bid tab and award recommendation. 5 NE Morrison � Maierle engineers • surveyors • plannees • wenuus Task 305 Award Contract and Contract Documents Task Description — Facilitate contract award and execute contract documents. Task deliverable — Two (2) signed originals of all contract documents to City of Bozeman and one (1) signed original of all contract documents to Contractor. Construction Phase The construction phase includes the general administration of the construction contract. The following sections describe each task as well as identifying the deliverable for each task, Task 401 Conduct Pre -Construction Conference and Notice to Proceed Task Description — Coordinate pre -construction conference and prepare Notice to Proceed. Task deliverable — Notice to Proceed. Task 402 Shop Drawing/Traffic Control/Permit Review and Approval Task Description — Review and approval of applicable Contractor submittals. Task deliverable — Approved Contractor submittals. Task 403 Construction Layout/Control Task Description — Provide construction staking services and control points as requested by Contractor and per project specifications. Task deliverable — N/A 0 �N Morrison Maierle engineers • surveyors • planners • ici"Ints Task 404 Resident Project Representative (1/4 Time, 2.5 Months) Task Description — Complete duties and responsibilities of the Resident Project Representative (RPR). Estimate effort is based on a two and a half (2.5) month construction window with the RPR on-site approximately 25% of the time. Task deliverable — N/A Task 405 Construction Management - Coordination, Schedule Progress, Pay Requests Task Description — Provide construction management services, schedule review and updates, and preparation/review of Contractor pay requests. Task deliverable — Weekly progress reports and pay requests. Task 406 Final and Two Year Warranty Inspection Task Description — Coordinate final and two-year warranty walk through. Prepare punch list items and notify City of Bozeman when items are complete. Task deliverable — Punch lists and completion notifications. Project Documentation Project documentation includes preparation of a construction notebook documenting the construction events that occurred throughout the project. The following sections describe each task as well as identifying the deliverable for each task. Task 501 Progress Reports (Monthly) Task Description — Preparation and assembly of monthly progress reports based on weekly progress reports throughout the project. Task deliverable — Monthly progress reports. N0 Morrison � Maierle engmms • swvr/o:s - planners - sciennsts Task 502 Record Drawings and Project Notebook Task Description — Preparation and assembly of record drawings and project construction notebook. Task deliverable — Project construction notebook and Mylar record drawings. Construction Testing Construction testing shall include material testing and verification of contract compliance. The following sections describe each task as well as identifying the deliverable for each task. Task 601 Concrete Strength, Air, Temp, Slump (Flatwork) Task Description — Completion of concrete testing of pole bases and flatwork per City of Bozeman standards Task deliverable — Testing reports. Task 602 Subgrade and Base Densities Task Description — Testing of subgrade and base material densities for impervious surface improvements. Task includes two (2) soil proctors to determine maximum densities for on-site backfill material. Task deliverable — Testing reports. 8 M0 Morrison �Maierle engmeeis • s—eyws • planners • w,mms Miscellaneous Services Miscellaneous services as described below. The following sections describe each task as well as identifying the deliverable for each task. Task 701 Miscellaneous Services — Additional Requested Task Description — Task 701 provides for additional effort as necessary to update easement documents and exhibits, complete design for parcels as necessary or any other unidentified requested services as directed by Owner. Task deliverable — As requested. Street Tree / Stormwater Analysis, Design and Construction Professional services as described below. The following sections describe each task as well as identifying the deliverable for each task. Task 801 Pre -Design Analysis and Report Task Description — Includes effort to prepare a pre -design report detailing pre-existing conditions, recommended trees and appropriate spacing, case studies of similar projects, stormwater treatment possibilities, cost considerations and anticipate maintenance. Task deliverable — Pre -design report. Task 802 Preliminary / Final Design Task Description — Will include both preliminary and final design of the tree types, locations, planting bed details including species, water main survey for irrigation, water tapping design, meter design, irrigation performance specification, paver design and installation details. Task deliverable — Final design included within construction plan set 6 N0 Morrison � Maierle engmeeu - wweyors - plmws • soenusts Task 803 Construction Task Description — Construction oversight of boulevard planting installation to ensure compliance with design intent. Task deliverable — N/A 11C Exhibit D-5 - Engineering Fee Estimate �aMorrison City of Bozeman, MT - North 7th Lighting Design and Construction Administration 1 111a Maierle V111ard St to Main Si. Prepared For: David Fine, City of Bozeman Economic Development Engineering Services Task or Division 100 -Prelimina Desl n Phase Staff Labor Labor Total Two Person Survey Crew 12,00 $167.00 $2100,11.00 101. Topographic Survey -Additional Survey (Spot Senior En (neer I 2.00132,00 $264.00 surveys for Improvements since last survey) land Surveyor 11 2,00 105,00 $210.00 Enolneering Technician 11 8100 $105,00 $840.00 102. Site Evaluation DeslQn Engineer 1 0400 $110.00 $0.00 Senior Engineer 1 0.00 $132.00 $0.00 103. Lighting Layout Design Engineer 1 8.00 $110.00 80.00 Senior Engineer 1 2.00 $132,OU $264.00 104. Lighting Calculations and Modeling Design Engineer 1 12.00 $110.00 $1,32000 Senior En inert 2.00 $132,00 $264.00 105. 8.0,19. Exhibits Design Enqlncer 1 0.00 $110.00 $0.00 Senior En (neer I 0.00 $132,00 $0.00 106. S1LD Exhibits/Legal/Paci(et Desi n Engineer 1 2.00 $110.00 5220,00 Senior Engineer 1 4.00 $132.00 $528.00 107. Coordination - City, MDT, Utilities, Suppliers Design Engineer f 30.00 $110.00 $3,300.00 Senlor En inert 24.00 $132.00 $3.168.00 108. Traffic Control Plan Design E )neer 1 100 t110.00 $330.00 Senior Engineer I 2.00 $132.00 $264.00 109. Civil Components (sidewalk, boulevard, grading, Enialneer Intern 80.00 $88.00 S7.040,00 Landscaping, signs, etc. for 16 properties) Engineering Technician 11 26.00 105.00 $2,730.00 Sento, Engineer I 26.00 $132.00 $3,432.00 110. Preliminary Plans and SpWriration5 Desi n Erolneer 1 10.00 710,00 $1,100.00 Senior En lneer 1 26.00 $3,432.00 Ill. Preliminary Engineer's Estimate Design Encllneer 1 3.00 110.00 330,00 Senior En (neer I 6.00 132,00 792 00 112. NSUR13 Meetings(9)_Senior Engineer I 16.00 $132.00 2 112.00 113. nail Assua nail Control Su In Ineer l 2.00 177.00 54,00 200 - final DmIgn Phase 20I. final Plan Set Preparation Design Engineer i 32,00 0 Senior Engineer 1 26.00 0 202. Final Specifications / Bidding Docs Desi n Engineer 1 10.00 ZS132,020 00 E640.GO Senior En (neer 1 16.000 203 Final Review fltf Coordination Senior En (neer 1 20. 204. nail Assura nail Control Su In Inecr lit ,00 t rr 300- Bidding orNegotiating Phase 301. Prepare Advertisement, Bel Document Administrative specia7l= 8,00 5,00 $600.00 Reproduction, Bidders List, Process Deposits Senior En (neer I 8.00 $132.00 $1,056400 -SupervisingEnvilneer ifI O.DO S149,00 $0.00 302. Conduct Pre -Bb Conference and Respond to Dell n Engineer 1 4.00 110,00 440.00 ConVactor R nests Senior En (neer 1 8.00 $132.DO $1,056.00 303. Prepare and issue Addendum Design Eng1reer I 4.00 10.00 S440.00 Senior Engineer 1 2,00 $132.00 $264.00 304. Attend Bid Opening, Prepare/Evaluate Bid Tab, Deal n Encifneer i 1.00 $110.00 $110.00 Award Recommendation Senior Engineer 1 6.00 S132.00 $792.00 305. Award Contract and Contract Documents Senior En )neer 1 12.00 $132.00 $1,584.00 Surleuvisirm Enolneer 111 1.00 $177.00177.00 r r r 400 - Construetlon Phase 401. Conduct Pre -Construction Conference and Notice Mign Engineer 1 4.00 110.00 $440.00 ro Proceed Senior Engineer I 6.00 $132.oO 1792.00 402. Shop Drawingfraffic Control/Permit Review and Deskin Encilneer 1 6.00 $110.00 $660,00 Approval Senior Engineer 1 6.00 $132.00 $792.00 403. Construction Layout/Control Two Person SurveyCrew 54,00 16700 $9,018.()0 404. Resident Project Representative (1/4 Time, 2.5 Months) Engineer Intern 100 -DD $88.00 $8,800.00 405. Construction Management - Coordination, Design EnQlrieer 1 10.00 110.00 $1,100.00 Schedule Pr rens Pay Requests Senior En (neer I40.00 132.00 5 280.00 406. Final and Two Year Warranty Inspection Drs n Engineer I 6.00 10.00 66(1 Senior En Ince,I 6.00 1 .W 792.00 500 -Pro ect Docurrlenlatlon 501, Progress Reports (Monthly) Design Engineer 1 4,00 110.004SLAO.-DO Senior En ineer I 18.00 132.00 502, Record Drawings and Project Notebook Dest n Engineer 1 24.00 11210,:0 Senior En lneer I 6.00 132.00 600 - Construction Testi + 601. Concrete Strength, Air, Temp, Slump (Flatwork) Engineer Intern 16,00 $88,00602. Su a nd Base Densities En ineer Intern 16.00 00 700- Miscellaneous Services + rr 701. Isoe Menus Seivioes-Additional R nested flot to Exceed Rate Schedule r r1 $30,000.00 30 000.00 800 -Sped Tree/ S6ormwater Analysis, Del n and construction 80L Pre• Ma and Report Not to Exceed a Schedule 7 5 ,0017,51)(00 802. Prelimina Final Des n Not ro Exceed Rate Schedule 14 00 14 500.00 803, structlon Servlar Not ro Fxoeed Rate Schedule 1500 1 500.00 r rr Subtotal Engineering Services Labor Costs 790.00 $145,753.00 UV417(063tCtr8a $aAC ct Ar WrS-mxn to neuClEdr.DL DS•&V -Vtbra Wh>3s 9/17/101ti