HomeMy WebLinkAboutC5. PSA - Storm Drainage Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Kellen Gamradt, Engineering Inspector Kyle Mehrens, Stormwater Program Coordinator SUBJECT: Contract Agreement for Installation of Storm Drainage Improvements at Plum Avenue and Avocado Street MEETING DATE: June 20, 2016 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign a contract with Omdahl Excavation for installation of storm drainage improvements at Plum Avenue and Avocado Street. BACKGROUND: The vacant lot at the southeast corner of Plum and Avocado Street is currently a low point in the area where storm water runoff from Plum Avenue and Avocado Street collects and infiltrates into the ground. With the proposed development of the True Dragon Brewery on this lot, storm water runoff will not have a clear path for treatment and discharge. The proposed improvements include: installing storm drain inlets and piping to collect storm water runoff and to and infiltrate the storm water in an underground infiltration basin which will be located under Plum Avenue, north of the intersection. The objective of this project is to provide a way to capture, treat, and infiltrate stormwater from city owned streets post development of the True Dragon Brewery Improvements. Two bids were obtained for this project in order to meet the city’s purchasing policy of at least 2 written quotes for services totaling between $5,000 and $79,999. Omdahl Excavation provided the low bid with a total price of $47,900. Duneman Construction submitted the second bid with a total price of $70,477. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: The costs of this project will be paid for with approved funding from the FY16 Storm Water Fund. Attachments: Contract Agreement, Contractor’s Bids Report compiled on: 06/13/16 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112