Loading...
HomeMy WebLinkAboutC3. PSA - Materials Testing Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: 2016 Materials Testing Project - Professional Services Agreement. MEETING DATE: June 20th, 2016 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize City Manager to sign the Professional Services Agreement with Dowl for the 2016 Materials Testing Project. BACKGROUND: Attached is a copy of the partially executed Professional Services Agreement with Dowl for the 2016 Materials Testing Project. The document is in the City’s standard format. In 2014 the City began retaining a consultant to provide construction materials testing on all of our construction projects. The contract was a term contract with the testing being performed on an on call basis. After a two year term, we felt it was time to re-advertise the project to open it back up to all interested consultants. These services were procured through the City’s consultant selection process. A Request for Proposals was published in the Bozeman Daily Chronicle on February 7th and April 21st, with the proposals being due on March 4th. Proposals were received from 6 firms on the project which were distributed to a selection committee of 5 city employees. Dowl was chosen as the most qualified based on the written proposals. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission FISCAL EFFECTS: As detailed in Exhibit A to the Professional Services Agreement, the services will be billed on a unit price/hourly basis depending on the testing being performed with a not to exceed limit of $40,000. The costs will be broken down and reimbursed from each individual project and as such spread over the Water, Sewer, and Street enterprise funds. Attachments: Professional Services Agreement Report compiled on: 6/7/14 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86