Loading...
HomeSearchMy WebLinkAbout_BSD7-Phase 2 03-06-19AG2-01 Phase 2 Cover Sheet 03-06-19AS2-00 Master Site Plan 03-06-19AS2-01 Phase 2 Site Plan 03-06-19C-1.0 Directory, Schedule & Map 03-06-19C-1.1 Notes, Legend & Abbreviations 03-06-19C-2.0 Existing Conditions & Survey Data 03-06-19C-2.1 Existing Conditions & Demolition Plan 03-06-19C-3.0 Site Plan 03-06-19C-3.1 Streamline Bus Stop Plan 03-06-19C-3.2 Signage Plan 03-06-19C-3.3 Striping Plan 03-06-19C-3.4 Utility Plan Roundabout 03-06-19C-3.5 Utility Plan Ruth Thibeault Way 03-06-19C-3.6 Utility Plan Roundabout 03-06-19C-4.0 Grading Plan Roundabout 03-06-19C-4.1 Grading Plan Ruth Thibeault Way 03-06-19C-5.0 Construction Management Plan 03-06-19C-6.0 Civil Details 03-06-19C-6.1 Civil Site Details 03-06-19C-6.2 Civil Site Details 03-06-19C-6.3 Civil Site Details 03-06-19E-1 BEALL ST. & NO 15TH AVE. LIGHTING PLAN 03-06-19E-2 WIRING DRAWINGS 03-06-19E-3 WATER TIGHT CONNECTORS 03-06-19E-4 TYPE 10-A LUMINARE STANDARD DETAIL 03-06-19ES2-01 Electrical Site Plan - Phase 2 03-06-19ES2-02 Ruth Thibeault Photometric Calc - Phase 2 03-06-19ES2-03 Electrical Site Details 03-06-19L100 Landscape Overall Plan 03-06-19L200 Phase 2 Landscape Enlargement Plan 03-06-19L300 Irrigation Overall Plan (Phase 2) 03-06-19