Loading...
HomeSearchMy WebLinkAbout001_C1.1 COVER002_C1.2_LEGEND, NOTES, AND ABBREVIATIONS003_C2.1_EXISTING CONDITIONS AND DEMOLITION PLAN004_C3.1_OVERALL SITE PLAN005_C3.2 SITE PLAN- WEST006_C3.3_SITE PLAN-EAST007_C4.1_PLAN AND PROFILE TRAIL STA. -0+50-7+00008_C4.2_PLAN AND PROFILE TRAIL STA. 6+50-15+00009_C4.3_PLAN AND PROFILE TRAIL STA. 14+50-20+50010_C5.1 GRADING AND DRAINAGE PLAN-WEST011_C5.2_GRADING AND DRAINAGE PLAN-EAST012_C6.1_DETAILS013_C6.2_DETAILS014_C6.3_ADS DETAILS015_C6.4 ADS DETAILS020_A20_MAIN PAVILION - FLOOR & ROOF PLAN021_A21_MAIN PAVILION - ELEVATIONS022_A22_RESTROOM PAVILION023_A23_PARKING LOT TOILET024_L1.1_OVERALL LANDSCAPE PLAN, SCHEDULES & NOTES025_L1.2_LANDSCAPE PLAN – PARKING LOT026_L2.1_LANDSCAPE DETAILS027_L3.1_IRRIGATION PLAN - OVERALL028_L3.2_IRRIGATION PLAN – PARKING LOT029_L4.1_IRRIGATION DETAILS030_L000 OVERALL SITE PLAN031_L001 NOTES AND LEGENDS032_L200 PARKING LOT HUB - HARDSCAPE PLAN033_L300 OVERALL LANDSCAPE PLAN034_L301 PARKING LOT HUB - PLANTING PLAN035_L302 CROSSING ENLARGEMENT PLANS036_L500 LANDSCAPE DETAILS037_L501 LANDSCAPE DETAILS038_L502 LANDSCAPE DETAILS039_L600 IRRIGATION GUIDANCE AND WATER USE ESTIMATES040_C3.2 SITE PLAN (SOUTH)041_C3.3 SITE PLAN (CENTRAL)042_C3.4 SITE PLAN (NORTH)043_C5.1 GRADING AND DRAINAGE PLAN044_C5.2 GRADING AND DRAINAGE PLAN045_C5.3 GRADING AND DRAINAGE PLAN046_C5.4 GRADING AND DRAINAGE PLAN047_C6.1 EROSION CONTROL PLAN (SOUTH)048_C6.2 EROSION CONTROL PLAN (CENTRAL)049_C6.3 EROSION CONTROL PLAN (NORTH)050_ C5.3 STORM POND GEOLOGICAL CROSS SECTIONS