Loading...
HomeSearchMy WebLinkAbout00 Development Review Application01 Design Narrative02 Concept Review Response to COB Comments - MMI JBB03 Concept Review Response REF #2 - Fire Marshall Correspondance04 Concept Review Response REF #6, #9 112 S Church - Storm Report04 Concept Review Response REF #6, #9 Storm Report05 Concept Review Response REF #8 - Blackfoot PUE Letter06 Concept Review Response REF #8 - 112 Church NWE PUE Letter07 Concept Review Response REF #10 - The Depot - Sewer08 Concept Review Response REF #10 - The Depot - Water09 Concept Review Response REF #13 SID Protest Waiver DRAFT10 Concept Review Response REF # 40 - Floodplain Correspondence10.1 Floodway Data10.2 BFE Determination Flood Profile10.3 BFE Interpolation Figure11 Site Plan MEPF Design Narrative12 Noticing Checklist N113 Traffic Impact Study14 Concurrent Construction Existing and OnSite CCON15 Concurrent Construction Exhibit16 Notated CCOA Certificate of Appropriateness Checklist17 CCOA Historic Record 112 South Church Ave 202118 CCOA DEMO 24643 approval19 Cutsheet Storefront Windows20 Cutsheet Winco Windows21 Cutsheet Hollow Metal Doors22 Cutsheet Overhead Garage Door23 Cutsheet Corten Steel Panel24 Cutsheet Awning Frame & Fabric25 Cutsheet Railing26 Cutsheet Roof Pavers27 Cutsheet Roof Terrace Bench28 Cutsheet Roof Top Table29 GeoTech Report30 Traffic Impact Response Letter31 Acknowledgement - Stormwater Maintenance RequirementsFloodplain Correspondence