Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
00 Development Review Application
01 Design Narrative
02 Concept Review Response to COB Comments - MMI JBB
03 Concept Review Response REF #2 - Fire Marshall Correspondance
04 Concept Review Response REF #6, #9 112 S Church - Storm Report
04 Concept Review Response REF #6, #9 Storm Report
05 Concept Review Response REF #8 - Blackfoot PUE Letter
06 Concept Review Response REF #8 - 112 Church NWE PUE Letter
07 Concept Review Response REF #10 - The Depot - Sewer
08 Concept Review Response REF #10 - The Depot - Water
09 Concept Review Response REF #13 SID Protest Waiver DRAFT
10 Concept Review Response REF # 40 - Floodplain Correspondence
10.1 Floodway Data
10.2 BFE Determination Flood Profile
10.3 BFE Interpolation Figure
11 Site Plan MEPF Design Narrative
12 Noticing Checklist N1
13 Traffic Impact Study
14 Concurrent Construction Existing and OnSite CCON
15 Concurrent Construction Exhibit
16 Notated CCOA Certificate of Appropriateness Checklist
17 CCOA Historic Record 112 South Church Ave 2021
18 CCOA DEMO 24643 approval
19 Cutsheet Storefront Windows
20 Cutsheet Winco Windows
21 Cutsheet Hollow Metal Doors
22 Cutsheet Overhead Garage Door
23 Cutsheet Corten Steel Panel
24 Cutsheet Awning Frame & Fabric
25 Cutsheet Railing
26 Cutsheet Roof Pavers
27 Cutsheet Roof Terrace Bench
28 Cutsheet Roof Top Table
29 GeoTech Report
30 Traffic Impact Response Letter
31 Acknowledgement - Stormwater Maintenance Requirements
Floodplain Correspondence