Loading...
HomeSearchMy WebLinkAbout1.0 A1 Development Review Application 08-20-20201.1 PUDF Final PUD Plan Required Materials 08-20-20201.2 RC Revisions and Corrections 03-18-20211.2 SP Site Plan Checklist 08-20-20201.3 Bridger Vale Final PUD- Narrative Response to Comments 02-10-20211.3 Bridger Vale Final PUD- Narrative Response to Comments 03-29-20211.3 Bridger Vale Final PUD- Narrative Response to Comments 12-14-20201.4-Adjoiners 08-20-20201.4-N1 08-20-20201.5-WR 08-20-20201.6-PUDF Item #1 (Overall Narrative) 08-20-20201.7-PUDF Item #2 (Proposed Relaxations) 08-20-202010.0 Doc. No. 2682114_12-14-202010.1 Doc. No. 2634483_12-14-202012.0 Stormwater Mainentance Plan 03-29-202113.1-Vaughn Environmental Services Wetlands Delineation Report 08-20-202013.2-GCD Ditch Classification 08-20-202013.3-GCD Ditch Figure 08-20-202013.4-GCD Ditch Information 08-20-202014.0 Bridger Vale SAP_03-16-202115.0 Stormwater Design Report_06-12-201915.1 Ground Water Monitorin_03-29-202116.0 Notice of PUD Restrictions_02-10-202117.0 Bridger Vale Parks Master Plan-02-10-2021 (Revised 01-22-21)2.0 Response to FOF 08-20-20202.1 Title Report 08-20-20202.2-City Zoning Map 08-20-20202.3-Existing Land Use Map 08-20-20202.4-Community Plan Future Land Use Map 08-20-20203.0-Color Aerial Photoraphy, Watercourses, Streets, Trails and Railways) 08-20-20204.0-Site Illustration 08-20-20205.1-PUDF Checklist Response Item 16 08-20-20205.2-PUDF Checklist Response Item 16.E 08-20-20206.0 Bridger Vale Subdivision Declaration of Conditions, Covenants and Restrictions_-3-22-20216.1 Bridger Vale Bylaws_03-22-20216.10 First Amendment Declaration_03-23-20216.2 Exhibit B - Bridger Vale Subdivision Design Guidelines_12-14-20206.3 Exhibit C - Bridger Vale Landscaping Plan_12-14-20206.4 Exhibit D - REMU tracking mechanism_12-14-20206.5 Exhibit E - Design Review Application Form_12-14-20206.6 Exhibit F - Stormwater Maintenance Plan_12-14-20206.7 Exhibit G - Declaration of Institutional Controls_12-14-20206.8 Exhibit H - Weed Plan_12-14-20206.9 Articles of Incorporation_03-29-20217.0 Weed MOU [Signed] 08-20-20208.0 IA- Improvements Agreement - Sidewalks_12-14-20208.1 IA Estimate-Sidewalks_12-14-20208.10 LOC for Park Landscaping8.11 LOC for Sidewalks8.2 Exhibit A - Sidewalks_12-14-20208.3 IA-Improvements Agreement - ParkLandscaping_12-14-20208.4 IA Estimate-Park Landscaping Estimate_12-14-20208.5 Exhibit A - Park Landscaping_12-14-20208.6 IA-Improvements Agreement - Open Space Landscaping_12-14-20208.7 IA Estimate - Open Space Landscaping_12-14-20208.8 Exhibit A - Open Space Landscaping_12-14-20208.9 LOC for Open Space Landscaping9.0 Waiver of SID Parks [Signed] 08-20-2020